Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capper
See JDLand's Capper Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


376 Blog Posts Since 2003
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 38
Search JDLand Blog Posts by Date or Category

From EYA: "Capitol Quarter will accept contracts on our next 5 market rate homes on Sunday, September 21, 2008 at 11:00 a.m." (I'm on my cell, so can't link right now. Go to eya.com for details.) UPDATE: Okay, I'm back. The five homes are being offered in the $630,000 - $645,000 range. Here's my Capitol Quarter page, just because I can't ever pass up an opportunity to link to it.
Comments (0)
More posts: Capper, Capitol Quarter
 

This is one of those real estate-section puff pieces, not a straight news story, but it's a quiet Friday so I'll link to the WashTimes's "New in DC: Batter, and Buyers, Up,"which gives an overview of Capitol Quarter. If you're looking for a summary of what's there, it runs through all the basics. For photos and lots more information, my Capitol Quarter page has plenty to keep you occupied.
Comments (0)
More posts: Capper, Capitol Quarter
 

At last night's Zoning Commission monthly public meeting, the DC Housing Authority made a presentation on the latest request for changes to the approved Planned Unit Development at Capper/Carrollsburg. I wrote a long explanatory entry about this request and the plans for multi-unit residential buildings at Capper back in July, and so I'm just going to plagiarize myself here:
"There are five new apartment buildings slated to be built, three of which along the east side of Canal Park where the temporary parking lots are, and another at New Jersey and K on the trash transfer site. And there is a new plan for a fifth apartment building, on L Street across from the Marine Bachelor Enlisted Quarters (B.E.Q), on the northern portion of the old Capper Seniors footprint.
"Under the original Capper plans, there was to be a strip of 61 townhouses built on this spot, but the DC Housing Authority has recognized that these homes would be dwarfed by the B.E.Q. to the north and the two planned office buildings directly behind them at 600 M Street. So DCHA has now filed a request with the Zoning Commission to allow an expansion in the total number of housing units allowed at Capper to 1,747, which would allow the construction of a four-story 189-unit apartment building (with a massing very similar to the B.E.Q.) on this stretch of L Street known as Square 882N. This Zoning Commission request is also looking to expand the number of units in the planned apartment building on the south side of L Street between Second and Third (let's call it Square 769N) to 171 units, as a result of its block-mate 250 M Street having recently gotten approvals to be built higher than originally requested."
As for last night's Zoning Commission presentation, there was a feeling apparently that it wasn't clear enough, so DCHA will be returning in early October with additional details.
 

Sunny, cloudless day? You knew there was no way I could pass it up. (Tivo has Nadal-Murray waiting for me.) So enjoy the new Capitol Quarter photos showing third floors now framed on the first batch of houses at Fourth and L. Catch the highlights on the project page, or the whole gamut in the Expanded Archive.
(And, Go Fed!)
Comments (0)
More posts: Capper
 

It was too pretty of an afternoon to pass up a new batch of photos at Fourth and L, to document 10 days' worth of framing work on these first Capitol Quarter townhouses. (I'm sure the novelty of this construction will wear off soon. Hopefully before my camera gives out.)
Comments (0)
More posts: Capper, Capitol Quarter
 

I took a lot of photos today, but let's start with the ones showing new construction phases underway. First off, we have the first framing at Capitol Quarter (top), where the wood outlines of the first four houses east of the Fourth and L intersection are now up. (At least the photos are more exciting than the ones a few weeks ago of the concrete block foundations.)
Then there's 1015 Half Street, the 410,000-sq-ft office building under construction on the old Nation nightclub site. The crane arrived within the past week or so, and I finally got to a spot where I could see down into the hole to confirm that the first pillars are underway. So, by Thanksgiving, there should be the beginnings of yet another new addition to the skyline.
More photos in the next few days.
Comments (0)
More posts: 1015 Half, Capper, Capitol Quarter, Square 697n
 

* As I mentioned below, the garage that housed both the Merritt and Four Star cab companies started getting brought down today. They didn't get it all on Thursday, but I imagine by sundown Friday the rest will be gone. (See pictures from midmorning, though it's hard to see much in the way of a difference from First and K, since they took out the back of the building and only a smidgen of the K Street facade.)
* Only a few hours after I said that Capitol Quarter framing would start "in the next few days," lumber went up on the first house on the south side of L east of Fourth. (No pictures yet--this weekend!)
* Sometime this week the crane was put up at 1015 Half Street, so we should be seeing vertical construction before too long.
* Building permits for the external renovations to 900 M Street are now winding their way through the bureaucracy. No word yet on any retail tenants.
 

I can't pretend that photos of not-very-high cinderblock foundations coming up along L and Fourth streets are really all that exciting (unless you own one of the houses-to-be), but that didn't stop me from taking a quick batch of new Capitol Quarter photos this morning, despite having to tiptoe around the serious infrastructure work clogging up L and Fifth.
Comments (0)
More posts: Capper, Capitol Quarter
 

While the focus lately has been on the start of the Capitol Quarter townhouses, there is more to the redevelopment of the old Capper/Carrollsburg public housing complex. There are the two completed seniors buildings (Capper Seniors #1 and 400 M Street), now providing 300 of the 700 old Capper public housing units that are being replaced. The first phase of Capitol Quarter includes 39 subsidized rental units, and the second phase (which is probably not going to start delivering until 2011) will have another 47 subsidized rentals; this is in addition to the sales of 121 market-rate and 91 workforce-rate townhouses throughout both phases. That leaves a little over 300 public housing units to come, which will be included in the 1,300 apartments expected to be constructed at Capper over the next five years or so.
There are five new apartment buildings slated to be built, three of which along the east side of Canal Park where the temporary parking lots are, and another at New Jersey and K on the trash transfer site. And there is a new plan for a fifth apartment building, on L Street across from the Marine Bachelor Enlisted Quarters (B.E.Q), on the northern portion of the old Capper Seniors footprint.
Under the original Capper plans, there was to be a strip of 61 townhouses built on this spot, but the DC Housing Authority has recognized that these homes would be dwarfed by the B.E.Q. to the north and the two planned office buildings directly behind them at 600 M Street. So DCHA has now filed a request with the Zoning Commission to allow an expansion in the total number of housing units allowed at Capper to 1,747, which would allow the construction of a four-story 189-unit apartment building (with a massing very similar to the B.E.Q.) on this stretch of L Street known as Square 882N. This Zoning Commission request is also looking to expand the number of units in the planned apartment building on the south side of L Street between Second and Third (let's call it Square 769N) to 171 units, as a result of its block-mate 250 M Street having recently gotten approvals to be built higher than originally requested.
I've updated the map and descriptions on my Capper Overview page to reflect these latest plans for the area, and it's worth taking a look at if you're not really familiar with exactly how wide-ranging the Capper Planned Unit Development is. (Reading the 2004 zoning order establishing the PUD and laying out the requirements isn't a bad idea, either.) I should also note that the apartment and office buildings will combine to have about 50,000 square feet of ground-floor retail. There should also be a new community center at Fifth and K, but it doesn't seem to be on the front burner just yet.
Of course, the question then becomes: when? Timelines are always dicey and should be taken with a couple pounds of salt, but it appears that these two L Street apartment buildings (882N and 769N) would be first up on the agenda, perhaps being delivered in 2011. The other two buildings on Second Street would come next, and the anticipated 400-unit building on the trash transfer site would probably be the last one to be built, finishing maybe sometime in 2013. The three office buildings and the second phase of Capitol Quarter townhouses would be sprinkled throughout that time frame as well, with 250 M Street probably being the first office building to get underway, possibly even later this year. (Have I thrown in enough "maybe"s and "possibly"s and "perhaps"s for you?)
At least these plans don't have to wait until school buses get moved!
 

You'll probably need your x-ray specs to really glean any progress from my usual vantage points, but that shouldn't stop you from taking a look at today's batch of Capitol Quarter photos, taken on the blocks bounded by Fourth, Fifth, L, and Virginia. As the above photo shows (there's a bigger version on the project page), foundations are indeed now being dug for the first townhouses, on the south side of L between Fourth and Fifth. And meanwhile, the streets are getting pretty new granite curbs and brick gutters. The blocks north of L now have a lot of "private" infrastructure work underway (meaning, the pipes and whatnot that will run beneath the houses), so all in all there's no denying that, after a long long wait, the heart of the Capper/Carrollsburg redevelopment is now underway. We should be seeing the first hints of structures rising out of the ground next month.
And, if you really really can't get enough of seeing what's happening in that section of the neighborhood, go to the Capitol Quarter Phase I Expanded Archive, where you can see all vantage points. And be sure to click on the Click to see all available photos of this location. icon anytime you want to see the complete range of photos from a certain spot (to watch the old Capper buildings come down, then see the weeds grow, then see the beginnings of construction).
UPDATE, 7/25: Within 24 hours of my visit, the first concrete footers were poured.
Comments (0)
More posts: Capper, Capitol Quarter
 
376 Posts:
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 38
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.