Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capper
See JDLand's Capper Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


376 Blog Posts Since 2003
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 ... 38
Search JDLand Blog Posts by Date or Category

Caught a break with such beautiful weather today, and so I snagged a new batch of overhead photos from up high at the Courtyard by Marriott. I took the entire batch, both east and west, and have paired them with the first ones I took, in March 2006. It's quite a difference; these are the views that people should see when they're carping about "how the area around the ballpark is one big construction zone" -- yes, it is, but look what that construction has done in just two years. (And think of what the commentary would be if this construction *weren't* happening.) You can also toggle to include all the photos from here in 2007 as well, to watch the process step-by-step.
These photos show the progress of 100 M, Onyx, Velocity, 70/100 I, the changes with the Capper Seniors buildings and all the demolitions (and new parking lots!) at Capper. There's even the first views of 909 New Jersey coming up above ground level. I'm still adding some updated photos to those project pages, but you'll get the idea.
 

* The prettiest darn fences, about four feet high, popped up around parking lots T and U on Third Street within the past two days. An unexpected touch. (I originally said wrought-iron, but now that I think about it, that's not what they are. Just black steel or some other metal I'm not smart enough to recognize. But still cool. Photos to come.)
* The Prince George's Gazette says that Nationals Park "could bring jobs and an economic boon to the southern part of the county."
* This is a few days old, but the US Park Police and the National Park Service say you'd better not think of parking at Anacostia Park during ballgames and other events at the stadium: "The NPS and USPP remind those seeking parking for events at the new Nationals' stadium that parking within Anacostia Park is open to park users only. Parking on turf is illegal within Anacostia Park. Park users are asked to be aware that increased vehicular traffic is anticipated and to make plans accordingly."
* Dr. Gridlock on his Get There blog talks about the "National Trifecta" on March 29--the National Marathon (which wrought all sorts of havoc in Southwest last year), the National Cherry Blossom Festival, and the Nationals-vs-Orioles exhibition game--that could make for rough driving around the city on that Saturday.
* I've taken enough photos of the stadium scoreboard to last a good long while, but Fox5 has a bunch of shots of the Scoreboard Control Room.
*This week's Ballpark and Beyond column in the Post's District Extra covers the new parking lots at Capper, and has a preview of the Florida Rock zoning hearing tonight (see renderings and photos here).
 

About five readers in the past week have submitted the same question: What's the Deal With Capitol Quarter? And it's hard not to be wondering that, as one of the first announced projects to revitalize Near Southeast still hasn't seen the start of construction, with a number of target dates having slipped past. (You can read my WTDW Capitol Quarter from December to see the last update.)
EYA told me this week that they're now looking at June or July as when the first townhomes will get underway, a little past the "Spring" start date that was projected a few months ago. As for the "why", I've mentioned before that we shouldn't really be surprised when companies working on projects worth hundreds of millions of dollars aren't spilling their guts to a pesky neighborhood blogger about the reasons for bad news, so I have no answer. But perhaps the new 2008 reality of a much tougher real estate market and the "credit crunch" are playing a part?
This isn't to say that nothing's happening at Capitol Quarter, since work at the site has been chugging along for the past few months. The first phase of public infrastructure improvements, which has been the cause of all the ripping up of Fourth, Fifth, I, K, and L streets, is all but finished (except for some last work along L Street). And work has started on installing "private infrastructure"--the wet and dry utility lines for the new houses--which will be followed by preparing the lots for vertical construction. But of course none of this is terribly flashy work, and until the townhouses start popping up, it's easy to feel like nothing's happening.
It's still anticipated that all the Phase I townhouses will be completed by the end of 2010.
If you want to get caught up on previous WTDW... entries, here they are. To submit a WTDW question of your own, drop me a line, keeping in mind that I don't always get to these right away.
PS: No need to further inundate me with WTDW Canal Park questions. Many people (including me) are way ahead of you. Rumors are flying, and I'm trying to get some answers, so I'll post as soon as I have something.
Comments (0)
More posts: Capper, Capitol Quarter, What's the Deal?
 

* We knew he'd been asked, but it's now confirmed that President Bush will be throwing out the first pitch at Nationals Park on Opening Night (March 30). Officials from the team have told me that they've acquired more than 50 magnetometers to handle the security checks for the expected 41,000-person sellout crowd. But it's also one more reason to get there plenty early; the gates will open at 3:30 pm. Barry passes along the message from Stan: Take Metro! Stan also says, as we've heard from multiple sources lately, that the team is continuing to work on some same-day/cash lot parking, though it isn't in place yet. (They've said previously that they're trying to figure out how to offer these spots in a way that would prevent too much additional congestion, perhaps by requiring spaces to be purchased via the Internet beforehand.)
* As for the surface parking lots, work is speeding up (just in time!). Striping and lighting looks to be mostly done on one of the Blue Zone lots at Third and Tingey in The Yards (dull parking lot photo here), and work continues on the two lots along First Street north and east of the ballpark. Ditto for the lots on Capper/Carrollsburg land, all of which are in the Orange Zone. Asphalt is being laid at Lot W at Seventh and M on the old Capper Seniors site (another dull parking lot photo here). Stormwater management systems, gravel, and lighting are in at lots U and T on Third Street between I and L (more not-quite-so-dull photos here and here, both of which show the new signs now posted).
To manage these Capper lots, the DC Housing Authority has chosen UStreet Parking, a certified DC Local, Small, Disadvantaged Business (LSDBE) that handles the parking at RFK, the Convention Center, and many swank spots that geeky old neighborhood bloggers will never see the inside of, such as Love and Ultra. Look for some free parking days in April, along with monthly parking accounts and possibly some cash parking, especially now that the Performance Parking signs (and the enforcement expected to accompany them) have taken away the bountiful free parking on Capper streets that local residents and workers have gotten used to.
UPDATE: And yes, I've gotten an updated version of the Maine Avenue sign. And "Nationals Park" is now added to the Sixth Street and South Capitol Street exit signs, though not yet with the Curly W attached.
 

In our latest edition of What's the Deal With...., reader JD of JDLand.com asks: "WTDW with the old trash transfer site at 900 New Jersey Avenue, that place with the smokestack and all the Department of Public Works operations?"
At Wednesday's marathon capital budget hearing (no, I'm still not done watching it) the agency's director mentioned both the New Jersey Avenue site and the maintenance yard on O Street beneath the 11th Street Bridges as DPW locations that will eventually be moving to make way for development associated with the city's Anacostia Waterfront initiatives. I e-mailed DPW to get some clarification on his remarks, and have been told that the street sweepers that currently operate out of 900 New Jersey will be relocating in November to DPW's Bryant Street, NW, facility, but that other DPW functions are going to remain at New Jersey and K until the Office of Property Management can find them a new home.
This site is eventually supposed to be redeveloped as a mixed-income apartment building under the Capper/Carrollsburg Hope VI plan, but no timeline has been announced. And William C. Smith's plans for a 1-million-square-foot project on the block just to DPW's north, which include reopening I Street between New Jersey and Canal, would seem to need DPW to move out before they can get started.
As I wrote about over the summer, neighbors have been wanting that building closed for a long, LONG time.
 

I wandered around on Sunday for a photo session, wishing that spring would hurry up and get here so that the sun will rise higher during the day and set farther west so that I can stop dealing with the damn glare whenever I face southward.
* I have new images along N Street just north of the ballpark between Half and First, which show the work at the entrance plaza at Half Street, including glass now being installed on the ground floor of the western parking garage, as well as the structures that will make up the entrance gates.
* In fact, I updated all 12 angles of the Half and N intersection, which now that it has its new wide sidewalks, curbs, streetlights, and an initial paving job, is really a stunning testament to 24 months of change, not only on the four corners of Half and N but the blocks to the north as well. It's definitely worth a look.
* I took a lot of photos of the now-demolished Willco stretch along First Street (and gave the project its own page as well), and of course I got all the usual angles of 55 M Street.
* On Half Street between I and K, where JPI's 23 I Street residential project is expected to start this year, a pile of red-and-black advertising banners have been hung on every available surface, and a "JPI Permit Parking only" sign has appeared on the entrance to the former towing company's parking lot on that block. I'm guessing JPI's purchase of the property just closed. I haven't heard anything about potential start dates for this project, or when the Wendy's might close.
* If you browse all the photos I took yesterday, you'll also see a smattering of 70/100 I and 100 M shots as well as images of the two blocks along Third Street where temporary surface parking lots are going in (so now my pictures of those blocks have changed from post-demolition views of nothing to pre-blacktop views of nothing). And the always popular shots from the SE Freeway at South Capitol are updated, too.
And don't forget to click on the icon wherever you see it to see all photos in the archive of a certain location.
 

DCist alerts us to a new documentary, Chocolate City, which looks at gentrification in DC by following the story of the 400 families at Capper/Carrollsburg who have been moved out as part of the Hope VI redevelopment of the project. There will be a screening on Saturday night (Jan. 26) at Busboys and Poets at 2021 14th St., NW at 11 pm, and two other screenings in the next two weeks.
Comments (0)
More posts: Capper
 

Time to dip back into the What's the Deal With...? mailbag, where once again I'm being asked fabulous questions that I don't actually have any answers for. But that hasn't stopped me yet....
* Readers B. and K. are the most recent readers to ask about the Public Space Storage building on South Capitol between M and N, just a few feet north of the ballpark, wondering whether it has any plans to close. I know that Monument Realty was interested in acquiring the building, since it owns the lots just to the building's south as well as all other parts of the block not owned by WMATA, but that was before Metro awarded the Southeastern Bus Garage and its parking lot (on the north side to the storage building) to Akridge. It's certainly a valuable piece of land, and I don't think it's going out on a limb to say that I doubt it will be there many years from now, but as of this point I've heard of no deals.
* Reader R. has asked about Canal Park, which continues to appear stalled, with no public pronouncements on it in months. (And with that "Spring 2008" still displayed for all to see on the sign at Second and M.) Is it still the school buses throwing up the roadblock, which is what we last were told? Is there some new wrinkle? I haven't heard anything, I'm sad to report.
* Reader F. asks about Ann's Beauty and Wig Shop, the dazzlingly pink building sandwiched between St. Matthew's and Onyx at 125 L Street, wondering if it's going to be sold. Ann's came to this block in 2005, after I believe being forced out of Waterside Mall in SW, and the owner has apparently been pretty vehement with potential suitors that she has no intention of selling. Perhaps the pending sale of St. Matthew's to Ruben Companies could change that, but as of now, I've heard nothing.
That's the best I can do for now--absolutely no useful information at all! No doubt there's scuttlebutt on each of these that I'm not privvy to, but I continue to be unsuccessful in my quest to get all city officials and private-sector parties operating in Near Southeast to inform me at all times about all their dealings. It's almost like they think I'm just some sort of powerless pesky neighborhood blogger or something....
Got a WTDW question? (maybe even one that I might know the answer to?) Pass it along. But I'll close with a hint--when it comes to oft-discussed projects around Near Southeast, as soon as I hear information that I can confirm, I post it. (I do tend to stay away from posting rumors, and considering some of the ones I've heard over the years that have turned out to be fabulously incredibly wrong, I don't regret this.) If you haven't seen any updates lately about Canal Park, or Capitol Quarter, or the Post Plant, or any other project, it's because nothing new has come my way. I'm as desperate to post the latest news flashes as you are to read them....
 

It was time this weekend to catch up on photos for a bunch of locations, including the most aged batch of them all, the views of the ballpark's northern footprint along N Street, which haven't been updated since September, so you can now have your fill of photographs of imposing parking garages. The curbs and historic streetlamps are now in, and N Street has been paved from South Capitol to Half, and it looks like the paving east to First isn't far behind. So even though the half-shadow half-sunlight conditions weren't the best to work with, I took full updates of the First, Half, Cushing, and Van intersections along N, all of which you can see here.
One thing that really struck me today for the first time is just how wide First Street is becoming, as you can see in this batch of northward-looking photos. I also saw that all the businesses on the west side of First south of M have now vacated--as you can see above, it's odd to see those old about-to-be-demolished buildings with sparkly new sidewalks and streetlamps in front of them.
I also trudged around the road construction along First Street north of M as best I could to update photos of 100 M, Onyx, and 70/100 I, and also got a good new batch of 55 M photos as well as the always showy views from the freeway at South Capitol. And I finally got the last set of old Capper Seniors photos to show that the building is indeed gone. And heaven help me I even took a photo of the new sign advertising the Square 696 project, and also a few shots barely showing that work started this week on the first Capper parking lot at Third and I (because there's nothing more exciting than documenting the construction of a parking lot). There's just too much change, and I couldn't stop until it had all been documented! Aaaiiiieeeeee!!!!
For those of you brave enough to try, here's all the photos from the past two days on one page. (Thank heavens I've done a lot of work over the past year or so to automate the update process as much as possible.) Don't forget to click on the icons to see all photos of a location over the years....
 

Nineteen building permits for various addresses around Capitol Quarter have been approved in the last week, as you can see in the Building Permits feed (check it out, homeowners-to-be--your address might be there!). These don't mean that houses will start popping up next week, but it is another step in the long process toward work getting underway. As I've mentioned before, the digging you see currently in the old Capper area is the work on the public infrastructure; the laying of the pipes and utilities under the homesites themselves (known as the private infrastructure) will come next, followed by the "vertical construction" of the houses, which people are still telling me should start in the spring.
Comments (0)
More posts: Capper, Capitol Quarter
 
376 Posts:
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 ... 38
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.