Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capper
See JDLand's Capper Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


376 Blog Posts Since 2003
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 ... 38
Search JDLand Blog Posts by Date or Category

In our latest edition of What's the Deal With...., reader JD of JDLand.com asks: "WTDW with the old trash transfer site at 900 New Jersey Avenue, that place with the smokestack and all the Department of Public Works operations?"
At Wednesday's marathon capital budget hearing (no, I'm still not done watching it) the agency's director mentioned both the New Jersey Avenue site and the maintenance yard on O Street beneath the 11th Street Bridges as DPW locations that will eventually be moving to make way for development associated with the city's Anacostia Waterfront initiatives. I e-mailed DPW to get some clarification on his remarks, and have been told that the street sweepers that currently operate out of 900 New Jersey will be relocating in November to DPW's Bryant Street, NW, facility, but that other DPW functions are going to remain at New Jersey and K until the Office of Property Management can find them a new home.
This site is eventually supposed to be redeveloped as a mixed-income apartment building under the Capper/Carrollsburg Hope VI plan, but no timeline has been announced. And William C. Smith's plans for a 1-million-square-foot project on the block just to DPW's north, which include reopening I Street between New Jersey and Canal, would seem to need DPW to move out before they can get started.
As I wrote about over the summer, neighbors have been wanting that building closed for a long, LONG time.
 

I wandered around on Sunday for a photo session, wishing that spring would hurry up and get here so that the sun will rise higher during the day and set farther west so that I can stop dealing with the damn glare whenever I face southward.
* I have new images along N Street just north of the ballpark between Half and First, which show the work at the entrance plaza at Half Street, including glass now being installed on the ground floor of the western parking garage, as well as the structures that will make up the entrance gates.
* In fact, I updated all 12 angles of the Half and N intersection, which now that it has its new wide sidewalks, curbs, streetlights, and an initial paving job, is really a stunning testament to 24 months of change, not only on the four corners of Half and N but the blocks to the north as well. It's definitely worth a look.
* I took a lot of photos of the now-demolished Willco stretch along First Street (and gave the project its own page as well), and of course I got all the usual angles of 55 M Street.
* On Half Street between I and K, where JPI's 23 I Street residential project is expected to start this year, a pile of red-and-black advertising banners have been hung on every available surface, and a "JPI Permit Parking only" sign has appeared on the entrance to the former towing company's parking lot on that block. I'm guessing JPI's purchase of the property just closed. I haven't heard anything about potential start dates for this project, or when the Wendy's might close.
* If you browse all the photos I took yesterday, you'll also see a smattering of 70/100 I and 100 M shots as well as images of the two blocks along Third Street where temporary surface parking lots are going in (so now my pictures of those blocks have changed from post-demolition views of nothing to pre-blacktop views of nothing). And the always popular shots from the SE Freeway at South Capitol are updated, too.
And don't forget to click on the icon wherever you see it to see all photos in the archive of a certain location.
 

DCist alerts us to a new documentary, Chocolate City, which looks at gentrification in DC by following the story of the 400 families at Capper/Carrollsburg who have been moved out as part of the Hope VI redevelopment of the project. There will be a screening on Saturday night (Jan. 26) at Busboys and Poets at 2021 14th St., NW at 11 pm, and two other screenings in the next two weeks.
Comments (0)
More posts: Capper
 

Time to dip back into the What's the Deal With...? mailbag, where once again I'm being asked fabulous questions that I don't actually have any answers for. But that hasn't stopped me yet....
* Readers B. and K. are the most recent readers to ask about the Public Space Storage building on South Capitol between M and N, just a few feet north of the ballpark, wondering whether it has any plans to close. I know that Monument Realty was interested in acquiring the building, since it owns the lots just to the building's south as well as all other parts of the block not owned by WMATA, but that was before Metro awarded the Southeastern Bus Garage and its parking lot (on the north side to the storage building) to Akridge. It's certainly a valuable piece of land, and I don't think it's going out on a limb to say that I doubt it will be there many years from now, but as of this point I've heard of no deals.
* Reader R. has asked about Canal Park, which continues to appear stalled, with no public pronouncements on it in months. (And with that "Spring 2008" still displayed for all to see on the sign at Second and M.) Is it still the school buses throwing up the roadblock, which is what we last were told? Is there some new wrinkle? I haven't heard anything, I'm sad to report.
* Reader F. asks about Ann's Beauty and Wig Shop, the dazzlingly pink building sandwiched between St. Matthew's and Onyx at 125 L Street, wondering if it's going to be sold. Ann's came to this block in 2005, after I believe being forced out of Waterside Mall in SW, and the owner has apparently been pretty vehement with potential suitors that she has no intention of selling. Perhaps the pending sale of St. Matthew's to Ruben Companies could change that, but as of now, I've heard nothing.
That's the best I can do for now--absolutely no useful information at all! No doubt there's scuttlebutt on each of these that I'm not privvy to, but I continue to be unsuccessful in my quest to get all city officials and private-sector parties operating in Near Southeast to inform me at all times about all their dealings. It's almost like they think I'm just some sort of powerless pesky neighborhood blogger or something....
Got a WTDW question? (maybe even one that I might know the answer to?) Pass it along. But I'll close with a hint--when it comes to oft-discussed projects around Near Southeast, as soon as I hear information that I can confirm, I post it. (I do tend to stay away from posting rumors, and considering some of the ones I've heard over the years that have turned out to be fabulously incredibly wrong, I don't regret this.) If you haven't seen any updates lately about Canal Park, or Capitol Quarter, or the Post Plant, or any other project, it's because nothing new has come my way. I'm as desperate to post the latest news flashes as you are to read them....
 

It was time this weekend to catch up on photos for a bunch of locations, including the most aged batch of them all, the views of the ballpark's northern footprint along N Street, which haven't been updated since September, so you can now have your fill of photographs of imposing parking garages. The curbs and historic streetlamps are now in, and N Street has been paved from South Capitol to Half, and it looks like the paving east to First isn't far behind. So even though the half-shadow half-sunlight conditions weren't the best to work with, I took full updates of the First, Half, Cushing, and Van intersections along N, all of which you can see here.
One thing that really struck me today for the first time is just how wide First Street is becoming, as you can see in this batch of northward-looking photos. I also saw that all the businesses on the west side of First south of M have now vacated--as you can see above, it's odd to see those old about-to-be-demolished buildings with sparkly new sidewalks and streetlamps in front of them.
I also trudged around the road construction along First Street north of M as best I could to update photos of 100 M, Onyx, and 70/100 I, and also got a good new batch of 55 M photos as well as the always showy views from the freeway at South Capitol. And I finally got the last set of old Capper Seniors photos to show that the building is indeed gone. And heaven help me I even took a photo of the new sign advertising the Square 696 project, and also a few shots barely showing that work started this week on the first Capper parking lot at Third and I (because there's nothing more exciting than documenting the construction of a parking lot). There's just too much change, and I couldn't stop until it had all been documented! Aaaiiiieeeeee!!!!
For those of you brave enough to try, here's all the photos from the past two days on one page. (Thank heavens I've done a lot of work over the past year or so to automate the update process as much as possible.) Don't forget to click on the icons to see all photos of a location over the years....
 

Nineteen building permits for various addresses around Capitol Quarter have been approved in the last week, as you can see in the Building Permits feed (check it out, homeowners-to-be--your address might be there!). These don't mean that houses will start popping up next week, but it is another step in the long process toward work getting underway. As I've mentioned before, the digging you see currently in the old Capper area is the work on the public infrastructure; the laying of the pipes and utilities under the homesites themselves (known as the private infrastructure) will come next, followed by the "vertical construction" of the houses, which people are still telling me should start in the spring.
Comments (0)
More posts: Capper, Capitol Quarter
 

Having driven by this evening, I can report that the last wing of the old Capper Seniors building has come down in the past few days. Nothing left but a big pile of rubble. I'll go back and get photos when it's not, um, DARK.
 

While the plan that Tommy Wells announced last week to address on-street parking around the ballpark and on Capitol Hill is just beginning its trek through the legislative process, the first of the new parking lots that the city and the Nationals will want stadium-goers to use will get underway soon. Building permits have been approved in the last few weeks for temporary surface lots in the Capper footprint at Second and K, Second and L, and Sixth and M, and work on the first two should be starting this month. (The third lot will get started in January, after the wreckage from the almost-completed demolition of the old Capper Seniors building is cleared away.)
At the same time, a Request for Proposals has been issued by DC Housing Enterprises for the management of these lots, offering a one-year contract with up to four one-year renewal options. The RFP, while chock full of selection criteria, required certifications and other specifications, also gives a few details about the planned operations of the lots themselves, which together will have about 670 spaces (or more, if valet parking is used). They will be offering monthly prepaid public parking on weekdays from 6 am to 7 pm, at a rate of not less than $150 per month; some daily parking may be allowed as well.
But users of the lots will have to vacate prior to any Nationals game, since the lots are "expected to be subject to an exclusive arrangement" with the team that gives all spaces over to ballgame parking from two hours before the game until three hours after. And a nice arrangement it is--the DC Housing Authority will apparently receive $10 per parking space per game, whether all spaces are used or not.
The zoning rule passed earlier this year that allowed the creation of temporary ballpark-area lots such as these says that they may also be used for a "seasonal or occasional market for produce, arts or crafts with non-permanent structures," though no plans for anything like that have been announced. The rule also states that the lots can only last until April 2013, since it is believed development around the ballpark will bring plenty of underground parking that will negate the need for these surface lots. The three Capper lots will eventually be replaced with a mix of apartment buildings, townhouses, and office buildings, though start dates for those projects have not been announced.
One block south of Capper, at the Yards, another batch of temporary surface lots are planned, which would have about 700 spaces. Beyond these and the garages with 1,225 spaces on the ballpark site itself, no other stadium parking locations have been publicly identified, though the Nationals have said they have found enough parking spaces for all season ticket holders--they just haven't said where they all are yet. And the city and the team continue to say that Metro will be the best way to get to the ballpark.
You can check out my stadium parking map to see where these new lots are--it also shows the other locations where zoning allows temporary lots, plus existing lots and underground garages where parking could be made available.
 

Before the snow-that-never-was arrived yesterday, I took a quick spin to get some updated photos. There was still a smidgen of sun when I visited the old Capper Seniors site, where only the southwest wing of the huge building remained standing when I was there (but even that could be gone by now). I also wandered along Tingey Street behind the DOT HQ for the first time in a long time to see what's going on with the work at The Yards--they're now preparing to build some temporary parking lots and are doing their infrastructure work before starting the rehabs next year of three existing buildings into residential and retail offerings. I also took some shots along M Street and at Onyx on First and 100 M to take advantage of the overcast skies in those spots, since the building shadows on winter days when the sun's out are almost impossible to work with. Finally, I got updated photos of 55 M Street, the northern portion of Monument's Half Street project, where the section along M Street is now three stories high and a fourth story is underway on the southern edge of the building.
Here's the entire batch of new photos on one page--don't forget to click the if you want to see all photos in the archive from a certain angle. And in case you missed these a few days back, I recently took new overhead photos of the North of M area (looking south and west and northwest), showing quite a change in the last 21 months.
 

Here's your dreary Thursday morning reading material:
* The Post writes about the labor disputes at the ballpark: "Labor leaders are defending the hiring practices at the construction site of the new Washington Nationals ballpark, saying that efforts to give jobs to D.C. residents have been an 'unequivocal success.' [...] [T]he leader of the Metropolitan Washington Council of the AFL-CIO said the project has been successful in hiring District workers. The letter disputed criticism from some local activists that the ballpark had not come through with jobs for city residents."
* The Examiner, NBC4, WBJ, and the Post write about the presentations last night of the four finalists' plans for redeveloping Poplar Point. Channel 4 also includes a slideshow of the designs and links to information on each plan's community benefits. Apparently one of the propsals includes "an aerial tram that would carry passengers across the river to the new baseball stadium." And Now, Anacostia has some bullet points on the various presentations as well.
* Also from the Post, a District Extra piece on last week's council hearing on the Taxation Without Representation tote boards that some city council members want to put on the Wilson Building and the stadium. (Here's my report on the hearing.)
* My Ballpark and Beyond column in the Post adapts my recent blog posts on the sale of St. Matthew's, the Capper PILOT bill, and the recent Capitol Riverfront BID meeting.
* UPDATE: I should also add this opinion piece in the Examiner by Phil Wood on his impressions of the new ballpark. "If you asked me to describe the place in a single word, I'm ready to answer. Compelling."
 
376 Posts:
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 ... 38
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.