Near Southeast DC Past News Items: Canal Park
See JDLand's Canal Park Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


181 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 19
Search JDLand Blog Posts by Date or Category

I've been to a fair number of ribbon cuttings over the past decade, and I have to say that Friday's opening of Canal Park seemed to be infused with a level of excitement and joy that I don't think I've seen at any of the others.
While getting Nationals Park open in 2008 was a triumph of speed and scale, the 13-year journey of the three-block park at the heart of Near Southeast required so many hands and so much patience and resulted in a space with which the stakeholders are clearly thrilled that it shouldn't really be a surprise that on a gorgeously crisp late fall day so many attendees were walking around with what Tommy Wells described as "a huge smile on their face."
The speakers standing at a podium in the center block's small pavilion ran through the list of names and agencies that brought the park to fruition, starting with developer William C. Smith, whose CEO Chris Smith started the long drive to build the park, creating the Canal Park Development Association back in 2000. Then there was money from the federal government and the DC government, additional dollars and much support from the DC Housing Authority, work by OLIN landscape architects and STUDIOS architecture to design the park with innovative sustainable development and storm water management components (and a skating rink!). Props were given for the hiring of Housing Authority residents for 15 of the park's 25 part-time jobs.The Capitol Riverfront BID and the DC Commission on the Arts and Humanities also took bows for their parts in the park's creation (and future).
After the speeches, the festivities moved to the skating rink, where the ribbon was cut and Mayor Gray drove the Zamboni, and then the public laced up its skates and got out on the ice. And they kept skating, well into the night. (And I have no doubt there will be big crowds at the rink and park today as well.) For all the happiness seen in the park's founders about getting it finally opened, I saw equal measures of surprise and cheer that so many residents and neighborhood office workers had come to the opening, had stayed through the long speechifying, and now were skating and strolling.
I've joked that I sure have been saying the word "finally" a lot lately--the trash transfer station is finally demolished, Kruba Thai is finally open, Gordon Biersch finally admitted they're coming to 100 M, Vida Fitness is finally announced, Capitol Quarter is finally finished.... But it's the "finally" of Canal Park opening that hit me more than I expected, perhaps similarly to all those happy stakeholders.
I took a lot of photos of fenced-off schoolbuses in the early years, posted a lot of renderings (some for the park's first design that never materialized), and bugged a lot of people to find out the latest. It was, after all, one of the few projects that was already in planning when I started tracking Near Southeast in early 2003, along with the Capper redevelopment and Capitol Hill Tower.
And now the park is open (with the Park Tavern restaurant to follow "within a few weeks"), and everybody can enjoy it. Finally!
Hope you'll check out my photo galleries of the park, yesterday's ceremonies, and the park's opening night, along with my expanded gallery of before-and-afters from around the park (with some that I still need to fill in, oops). And you can also see coverage from the Post, NBC4, and WJLA. And the lineup of today's events and other details on the park's official web site. And tell us what you think of the park.
Comments (5)
More posts: Canal Park, Events, photos
 

A flyer just sent out by the Capitol Riverfront BID is announcing that Canal Park will have a two-day Grand Opening, on Friday, Nov. 16 and Saturday, Nov. 17, kicking off with a ribbon cutting with the mayor and other dignitaries at 11 am on the 16th.
The park's much anticipated ice rink will be the center of attention for the rest of the festivities, and it will be open from noon to 9 pm on Friday and 10 am to 10 pm on Saturday--admission is $8 for adults and $7 for kids/seniors/military, with skate rentals costing $3. There will also be "ice performances" at the top of each hour from noon to 4 pm, and coaches available to help new skaters.
Saturday will also have live music in the park from 10 am to 3 pm, various art-y options, and a "Get Active" program from Results Gym with boot camp, a kids obstacle course, and a Zumba class.
Considering that it was nine years ago this month that I first wrote about the plans to remove the school buses from the park's three-block site along 2nd Street between I and M, SE, I'd say this opening indeed qualifies as a milestone in the neighborhood. See my Canal Park project page for photos of what the footprint has gone through over the years.
(The BID also says that the management of Kruba Thai and Sushi says that their restaurant in the ground floor of the Foundry Lofts at the Yards is opening on Monday, Nov. 12. Will that come true as well? We shall see!)
UPDATE: I should add there's no word in this whether the Park Tavern restaurant will open on this same weekend--my guess is that the pressure is pretty strong to have it open in some format, but there's no announcement.
Comments (13)
More posts: Canal Park, Events, Foundry Lofts/Yards, The Yards
 

Isn't it great that the icky humid cloudy weather of the past few weeks finally broke? Aren't the skies glorious and blue? Does that mean I finally got to get out to take some photos? Why, yes!
First up are new photos from ground level at Canal Park, including the new L Street streetscape and the sculptures:
If you're big on Canal Park, you may also be interested in the many before-and-afters in the Canal Park Expanded Photo Archive, which leads off with the first decent bunch of photos from 2nd Place and L Street since construction started on the park many moons ago and then takes you on a before-and-after walk around the park's perimeter.
And then there's the progress on L Street between 3rd and 4th as the Capitol Quarter townhouse construction continues to wrap up:
I also added a few sunny-day Boilermaker Shop exterior photos and a shot of the hole in the ground at the Twelve12 apartment/Teeter project, because the ones I took on back Gloomy Thursday, when I got to go inside the Boilermaker building, drove me nuts:
External construction has pretty much wrapped up at 200 I/225 Virginia/Old Post Plant/Old Star Plant, especially on the south side of the building, facing Canal Park. There was a ribbon-cutting on Friday for the DC Commission on the Arts and Humanities gallery in the building's new lobby on I Street, but unfortunately I wasn't able to make the event. Hope to get photos inside before too long. In the meantime, you'll just have to look at the outside, and compare it to the White Monolith that it used to be:
If these all aren't enough for you, you can spend some time in the Photo Archive, where you pick the intersection you want to see and then you can see the entire range of photos I've taken for all angles or just the ones of your choice. You may even end up in the Photo Archive without realizing it, if you click on the Click to see all available photos of this location. icon on any of the pages above, which also will give you the full range of photos for that angle. It's pretty much the Near Southeast equivalent of heading down the rabbit hole.
 

A most interesting and welcome present arrived in my inbox recently: a reader passed along four photos taken in 1990 or 1991 shot from what clearly is the old Defense Mapping Agency/National Geospatial Intelligence Agency building at 1st and M, looking out over the streetscape of a veeery different neighborhood than what exists today. It was during the construction of the Navy Yard Metro station, and you'll see what a war zone M Street was for drivers and pedestrians.
There's familiar sites from the early days of my photo archive--Normandie Liquors, the On Luck Cafeteria, Capper/Carrollsburg, the school buses at Canal Park, and more, but there's also landmarks I either never got to photograph (like the old Tracks nightclub at 80 M) or only barely caught (like the Aamco station at New Jersey and M). The Ellen Wilson apartment blocks just north of the freeway on 6th Street are even visible.
But don't stop with the color photos at the top of the page. The rest of the page has a series of overhead images from the Library of Congress archive, taken in 1992, showing many of the same locations as the "new" color shots, along with some other spots, matched where possible with my images of the not-yet demolished buildings. I posted them almost two years ago, but I'm sure they're new to plenty of people.
If you happen to have taken any photos of the neighborhood from pre-2003 that you'd like to share, I'd love to see them. Feel free to pass them along via whatever venue you might prefer--Facebook, e-mail (dc at jdland dot com), Flickr link, etc.
Comments (4)
More posts: Canal Park, Capper, photos, Rearview Mirror
 

I mentioned a few weeks ago that it would be happening soon, and indeed, L Street through Canal Park at 2nd Street SE is now open, with the sidewalk on the south side of the street available for pedestrians.
With this access available, K Street has now been temporarily closed to complete its streetscape. Since the park is still on schedule to open in November, it's likely that K Street will reopen by then.
I'd post pictures of the new vistas on L, but I can't stand any more cloudy-day shots of that location (such as this one from my visit inside the fences in late July), so it'll have to wait for the sun to come out.

Comments (8)
More posts: Canal Park
 

A few weeks back I posted a bunch of photos of the progress on Canal Park, all taken by shoving my camera lens up against the cyclone fences and doing the best I could. The park's poobahs have since taken pity on me, and on Monday gave me my first chance to get inside the construction site. Alas, almost as soon as I got there, the sunny day turned into a cloudy day, and so the photos don't exactly pop off the screen. But, as I've said before, sometimes you have to take photos with the weather you have, not with the weather you wish you'd have.
The entire gallery is here, and also includes some shots from up above the park site, from when the sun was still out. (Yes, I'm bitter. If you want to see exactly what sort of impact sun vs. no-sun has on photos, I point you to my newly updated gallery of before-and-afters from L Street on the east side of the park. Bleccch.)
Some items of note I learned during this walkaround:
* (Left) The block of L Street SE within the park's footprint will be permanently reopening to traffic before too long. But at about the same time, K Street will close within the park so that it can receive the same traffic-calming streetscape seen on L. I asked about pedestrian space along L during K's closure, and they will be looking at it.
* (Middle) The interior build-out has begun of the Park Tavern restaurant inside the main pavilion. It's expected to open when the park does, which still seems to be on-schedule for November.
* (Right) The black refrigeration tubing for the hockey ice rink is being installed, so that when it's unseasonably warm in January, people can still skate and not swim. And if you look at the enlarged photo and wonder why the staircase seems to have two different sized steps, it's because the ones on the right will have wooden slats added to them for a "bleachers" feel for sitting and watching the skating/fountain-frolicking.
Photos from this visit have also been added to my main Canal Park project page, if you're looking for more detail beyond what's in today's gallery.
Comments (0)
More posts: Canal Park, photos
 

* Canal Park's new web site launched today, and it indicates that they're still aiming for a November opening for the park, the ice rink, and the restaurant.
* The I Street McDonalds is going to be getting a makeover, judging by a recently approved building permit.
* Current 6D07 commissioner David Garber has picked up petitions to run for reelection. So far he and Ed Kaminski are the only potential candidates for the two single member districts that cover Near Southeast.
And, in this weekend's events:
* Tonight's Front Flick at Tingey Plaza is The DaVinci Code.
* The Nats are about to start their 12:35 pm Matinee as I type this on Thursday, then they'll play host to the Braves Friday-Sunday. This time around there's a Saturday 1:05/7:05 doubleheader, which includes the second NatsLive concert, with the Wallflowers. (Tickets for each game sold separately, and you need a ticket to the 7:05 pm game in order to see the Wallflowers.) It's a pretty big-time series against Atlanta, so expect big crowds.
* The Fairgrounds has its South on South Capitol Southern Rock festival on Friday and the Capitol GrooveFest on Saturday
* The Yards Park has Jah Works playing reggae for its Friday Evening Concert, then the Taste of Belgium beer/food/music event on Saturday.
 

It's summer, and I'm trying to be on a Word Diet, so lots of links, but short and sweet:
* This week's Front Flick, O Brother, Where Art Thou?, tonight at Tingey Plaza.
* Another installment of Truckeroo on Friday.
* One potential candidate for Near Southeast's two ANC single member districts has already picked up nominating petitions: Ed Kaminski, who lives in 6D02.
* Washington Examiner is hot on the Hood. Times two. Shorter version: more people coming (like Nats fans). More stuff coming. But you knew this already.
* Miniature golfing in Canal Park, in a manner of speaking.
* Reunion of Arthur Capper residents last week at Garfield Park.
* There's now lane restrictions on M Street SE between 7th and 11th for the next, oh, 27 months or so, thanks to the DC Water Clean Rivers Project. (This is also why Water Street east of 12th Street is closed.) The work along M got off to a bit of a rough start last month when contractors took over the pocket park at 8th and Potomac without using a particularly light touch.
* Nats Park in the mix for the 2015 MLB All-Star game, but lots of other cities want it, too.
* Across the way: new DC United investors "should boost quest for stadium" at Buzzard Point.
* At least SOME major media organizations know how to credit scoops. {Said while glaring at WashBizJ, though not PhilBizJ}
* Folks at 909 New Jersey, and also 1980s DC nightclubbers, might like this WaPo photo. Especially when compared to this. (The railroad tracks are probably not missed.)
 

Although the temperature was a bit high for my liking, it still felt good to take a walk with camera in hand for the first time since April around Canal Park and Capitol Quarter to get a new batch of photos. And, thanks to the planting of numerous trees along with other visible improvements, my months and months of complaining about not really having much to photograph during the park's construction have come to an end.
With the arrival of the trees and some initial streetscaping now in place on the portion of L Street that runs through the park, you can now see how narrow the street is going to be in order to work to slow vehicular traffic as it crosses the park. (The completed streetscape will also give a visual cue to Slow The Hell Down.) K Street will get a similar treatment.
So check out the slew of progress shots on my Canal Park project page. And I do also recommend a run through my Expanded Canal Park photo archive, to make a time-traveling virtual visit to the park's three blocks, which will get you comparison shots like these:
(Southeast corner of 2nd and K. I love the first shot, from nearly nine years ago, with lots of school buses and without USDOT.)
The official Canal Park web site can also give you more information, along with these slides from a presentation at last month's ANC 6D meeting. Though, judging from the people who chatted me up while I was poking my camera through the fences, we're long past the "what" stage and deep into the "when" ("WHEN!?!") stage. An opening in November is still the target.
Meanwhile, on Capitol Quarter's last block, framing has now gotten underway on 4th Street, with bricking and painting finished on the houses on the 3rd Street side. My suggestion is to scroll through the Capitol Quarter Phase 2 Expanded Photo Archive, because I can't imagine at this point the before-and-afters need much narration.
(Southeast corner of Third and L, in December 2004 [through the windshield!] and today.)
Comments (4)
More posts: Canal Park, Capper, Capitol Quarter, photos
 

Moving from the "P" portion of Monday's ANC 6D meeting (pylons and parking) to the "C"s:
* Canal Park: Chris Vanarsdale of the Canal Park Development Association gave an update on construction, the bottom line of which has not changed from what's been mentioned the past few months, that because of unexpected issues, the park's opening has been delayed until November. Unmapped utilities that required a redesign of the stormwater management system have been a big stumbling block, but Vanarsdale also mentioned the soil-related difficulties when building on the site of an old canal. Construction is now 60 percent complete, and the work on the pavilion is almost done. Here are the presentation slides, and you can also check out the official web site for more details (along with my project page). Oh, and they're thinking about offering Zamboni driving lessons!
* Community Center: The DC Housing Authority has filed a request with the Zoning Commission for an extension for construction of the planned Capper Community Center, which already received one extension back in 2010 that 6D supported. DCHA has apparently requested that the Zoning Commission act within 30 days on the request, news of which the ANC received on Monday. So the commissioners voted unanimously to send a letter urging postponement of the zoning case so that the ANC can address the request and form a response with a vote at next month's meeting. Commissioners Litsky and McBee also both commented that the project shouldn't be getting another extension.
UPDATE: Here is the letter sent on behalf of DCHA to the Zoning Commission asking for the extension: it would be for two years, requiring building permits by July 1, 2014 and construction underway by July 1, 2015.
* CSX/Virginia Avenue Tunnel: The commissioners voted 6-0-1 to send this letter to the appropriate parties laying out the ANC's opinion on the plans to reconfigure the Virginia Avenue Tunnel. After listing the various ways that the proposed construction "would put people, homes, businesses, and fragile historic resources at risk," the letter states: "[W]e strongly believe that the best options for our community are for CSX to either leave the Virginia Avenue Tunnel in its current state (Concept 1) -- with the suggestion that if this option were chosen that the tunnel would be fully maintained for the safety of both the trains below and the communities above, or to reroute additional train traffic outside the District of Columbia [...] instead of in an expanded Virginia Avenue Tunnel." But, if the construction does occur, "it is absolutely imperative that the health and safety of our many residents, the economic and physical well-being of our businesses, parks, religious institutions, homes, and historic buildings, and the north-south access for all existing modes of transportation be preserved and enhanced." A number of Capitol Quarter residents in attendance also spoke in support of the ANC's support. The next public meeting on the plans for the tunnel will be May 21 at 6:30 pm at Nats Park.
One more recap post to go, probably tomorrow.
 