In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


181 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 19
Search JDLand Blog Posts by Date or Category

A few days ago, WBJ reported Deputy Mayor Valerie Santos saying that Canal Park "will move forward" in June. With the previous comments on the park's timeline indicating a September start of construction, my curiosity was piqued, so I contacted the park association's executive director, Chris Vanarsdale, to find out the latest. To wit:
At this point, work is continuing on the design documentation, which is expected to be completed in June, and it's still expected that construction on the park itself will begin in September. However, the plans now also include $1.5 million of infrastructure work beneath Second Place (the road that runs on the eastern side of the park), which will be paid for out of the $29 million in Capper bonds that are hitting the market this week. (This wouldn't appear to be any sort of evil cost-shuffling by the city, since Second Place runs along blocks that will eventually house three Capper apartment buildings and WC Smith's 250 M Street office building that is also technically part of Capper's Hope VI redevelopment.)
The work on the utilities below Second Place, which are apparently quite a mess, will also allow the park to install stormwater management infrastructure to be in place for when the new apartment buildings are constructed, so that the park can capture water from those buildings' roofs to be used in the park for irrigation, fountain water, and whatnot. And, if there's any money left over after the infrastructure work, there's now streetscape designs for the east side of Second Place that complement the park's design, which would extend the "feel" of the park across the street.
It's this infrastructure work that will begin this summer, prior to the actual start of work on the park itself. The hope is to have a groundbreaking ceremony in July, though at this point all timeline forecasts are subject to the completion of the permitting process for construction, and we know how THAT can sometimes go. This also assumes that there aren't any (more) big surprises lurking beneath Second Place in terms of the existing water, sewer, and other utility lines.
The park's opening date is still pegged at fall 2011, since the work on the park itself is expected to take between 12 and 14 months. The design is still pretty much the one that we've been seeing for a while--there are a few renderings on my Canal Park page, and you can also visit the official park web site for more details.
Comments (0)
More posts: 250 M/New DDOT HQ, Canal Park, Capper, Capper New Apt Bldgs
 

At its November meeting, ANC 6D received an update on the progress of Canal Park, but I was out of town and missed the presentation, so I've gotten a quick status update from Chris Vanarsdale of the Canal Park Development Association. He passes along that the design development phase is nearing completion, and that hopefully in a few weeks they'll make available a revised plan view of the park--the middle block has apparently undergone some significant changes, with the addition of a much larger water feature and the reconfiguration of the pavilion in that block. You can see some renderings of the pavilions planned for the south end of the park (at M Street) on my Canal Park page, although there will probably be some revisions to the designs of these structures as well.
On the flip side, the anticipated start of construction is now being quoted as September 2010, about six months later than what's been on the boards for most of this year. It was reported back in October that the design approved by the National Capital Planning Commission would cost $18 million, $5.5 million more than the grant the CPDA has received to design and build the park; I don't know whether the park's design is being scaled back or whether they're still hoping to raise the extra funds (I've asked, but haven't received an answer).
Comments (0)
More posts: ANC News, Canal Park, meetings
 

News from the Capitol Riverfront BID:
* They've announced their second annual Holiday Market, running Dec. 15-18, from noon to 6 pm each day, at Second and M, on the Canal Park footprint.. "For four days, the Capitol Riverfront will present a festive holiday market with local artisans selling handcrafted jewelry, crafts, photography, holiday trees and greenery, and more. Enjoy a variety of festive foods and live music daily from noon - 2 pm."
* The BID has also posted a few photos of the construction work (and the sign) at the "soon-to-open" Justin's Cafe at Velocity on their Facebook page.
 

Here's a bunch of little items and event reminders. Alas, next week's pile of happenings come at a bad time on my calendar, and I'm going to have to miss almost all of them, so this would be a good chance for everyone to attend these meetings themselves instead of sitting around waiting for me to tell you what happened at them. :-)
* ANC 6D (Southwest and Near Southeast) has posted the agenda for its November meeting, which includes an update on the plans for Canal Park. It's on Monday, Nov. 9, at 7 pm, at St. Augustine's, Sixth and M streets, SW.
* The next night, ANC 6B (Capitol Hill SE and Eighth Street) is having its November meeting, where there will be a presentation by CSX on its planned Virginia Avenue Tunnel construction. (Voice of the Hill recently wrote about the plans, and you can read my posts about them, which include links to some source documents.) ANC 6B's meeting is Nov. 10 at 7 pm at the Old Naval Hospital at 921 Pennsylvania Ave., SE.
* Plus, the Friends of Garfield Park are having their own informational meeting about the CSX plans, on Thursday, Nov. 12, at 7 pm at Capitol Hill Day School (Second and South Carolina, SE).
* The Lower 8th Street Visioning Process folks have posted the minutes, historical background, and main presentation slides from their two October sessions. They've also posted the agenda for their November meetings, scheduled for 8:30 am and 7 pm on November 17 at the People's Church, 535 Eighth St., SE.
* And, if these events aren't enough for you, you can also watch on Nov. 12 the city council's Committee on Finance and Revenue Hearing on the bill that would allow the sale of bonds via the city's CFO office that would pay for a considerable amount of "Phase 3" infrastructure work for Capper/Carrollsburg redevelopment, encompassing some as-yet-undetermined combination of underground work on the Second Street blocks, the relocation of the DPW operations at New Jersey and K and demolition of that block, and the construction of I Street between Second and New Jersey. (This is above and beyond the $9.5 million in federal stimulus funds that the city is receiving to allow Capitol Quarter's second phase of townhouses to go forward.) The council hearing is on the 12th at 10 am, and you can watch on DC cable channel 13 or via the channel's web site. Here's my post about this proposed bill, if you want to know more.
 

From this Examiner story about today's various National Capital Planning Commission actions, news that not only did the commission (as expected) give approval to the conceptual designs for Canal Park, but that the park's development association is needing more money to complete the project: "But designs have already surpassed the $13.5 million grant the CPDA received from the D.C. Office of the Deputy Mayor for Planning and Economic Development. [CPDA executive director Chris] Van Arsdale estimates an $18 million total cost based on the design approved by NCPC, which includes a large playing field, a rain garden and a plaza that would accommodate in-ground water fountains in the summer and an ice rink in the winter. Van Arsdale said CPDA was trying to use new market tax credits through the Treasury Department to raise the millions still needed for the project."
Comments (0)
More posts: Canal Park
 

I'm racing out the door, so here's nothing more than a quick link to the National Capital Planning Commission's staff document on the new Canal Park concept design in advance of the commission's meeting on Thursday, in which a "favorable comment" is recommended. It also "[c]ommends the applicant on a revised concept that is both simple in its design, and high-performing in the range of amenities it will provide to the surrounding community. The revised concept incorporates simple park amenities such as an abundance of flexible open space, plentiful seating, and interactive water features to ensure that the park can be enjoyed by a variety of users."
It's a 14-page document with scads of renderings and details about the plans for the park, including the many low-impact design features. The NCPC does have some questions that it requests be addressed when the design comes back to the commission at the preliminary design stage, which you can see on page 2. It also says that the construction start date for the park is still expected to be March 2010, with a one-year timeline for completion.
How do all these new details on the design strike everyone? Post your thoughts in the comments.
(And check out the NCPC's overhauled web site!)
Comments (0)
More posts: Canal Park
 

Here's a bunch of small items that I've Tweeted over the past few days; I'm succumbing to abject laziness and only barely bothering to rewrite them (who needs all those extra words, anyway?):
* RT @TWTSports: #Nats will open the 2010 season at Nationals Park against the Phillies on April 5. [schedule link]
* RT @LPags03: #Nats host BOS for exhibition game on 4/3.
* The new Canal Park design is on the preliminary agenda for the Oct. 1 NCPC meeting. Hope it makes the final agenda: link
* Study of commuter ferry service to waterfront from Woodbridge pegs a $30M price tag just for needed improvements: link
* From @octolabs: DC Citywide Data Warehouse won coolest gov innovation award for DC Data Catalog/Data Feeds: link [and thanks for the shout-out!]
* RT @Cornercopia: Owner of blue civic with Maryland plates parked in front should probably move their car. 2 tickets already since Mon.
 

I think I mentioned this a few days back, but here it is again: On Saturday (Sept. 19) from 10 am to 2 pm, the BID is hosting a Canal Park Picnic and Home Tour: "Enjoy live music, food, drink, and lawn games at Canal Park! Tour selected rowhouses, condos, apartments and townhouses of residents in the new Capitol Riverfront neighborhood. See what it's like to live in the Front!" It's free and open to the public. Food will be provided by Cornercopia, "Smokin' Somethin'" (BBQ) and Sweetgreen (frozen yogurt). The two 45-minute neighborhood walking tours start at 10:30 am and 12:30 pm.
This also seems to be somewhat in place of a Capitol Riverfront WalkingTown DC tour, since there isn't one on WalkingTown's fall lineup this weekend. My bad--I didn't see the "FRONT" tour on the WalkingTownDC lineup.
Comments (0)
More posts: Capitol Riverfront BID, Canal Park
 

Pulling together smallish items from hither and yon:
* Last night saw the first arrival of a commercial water taxi at Diamond Teague Pier; WTOP covered the trip, which is a good thing, since I neither rode the boat nor stood on the dock to watch it sail in. I suck.
* A stroll through the city's building permits feed (which alas isn't as easy or useful as it used to be, since they pile every single permit into the feed over and over, rather than just posting new/updated ones) uncovered that back in August, a raze permit was issued for 156 L Street, home of the old Star Market and better known as the "Little Red Building"; the owner has spoken of plans to build a new two-story structure that would be a combination liquor store and deli. I haven't heard of any timeframe for the demolition, new construction, or store opening.
* From And Now, Anacostia, a heads up that today's Kojo Nnamdi show will include a segment called "Paris on the Anacostia: A Provocative Idea for DC's Waterfront," which will discuss the idea of *narrowing* the Anacostia River, "with the goal of bringing in new businesses, training new workers, and completely changing the relationship between folks East and West of the River." It'll be available online here.
* Tomorrow night (Thursday) is the second Outdoor Space Movie at Canal Park; this time it's Star Wars. The Force will be with you, starting at 7:30 pm.
* And Thursday night is also the deadline for pre-registration for ULI Washington's Urban Marketplace conference and expo on Sept. 15. Among lots of other sessions about urban development, it includes a panel discussion about the ballpark neighborhood, with Michael Darby of Monument Realty, Matthew Klein of Akridge, Michael Stevens of the BID, Harriet Tregoning of the Office of Planning, and me. It'll be a barn-burner!
* Saturday night is the second annual Opera in the Outfield at Nationals Park; the Washington Times previews it here. It's the Barber of Seville; but don't be alarmed when the first lines aren't "Welcome to my shop/let me cut your mop, let me shave your crop/Daintily, Daintily!"
* Forest City announced its second-quarter earnings, for those who know how to decipher these things. It does mention the Park at the Yards, still listing the completion date of the first phase as summer 2010. And their outlook? "While some see signs of a potential end of the recession, we are taking a conservative course based on what we can observe and are experiencing directly: continued weak fundamentals and little improvement in overall near-term conditions. As a result, we remain very cautious going forward. We expect the second half of the year to be challenging for our Company and for the entire industry, and we do not anticipate meaningful improvement in market conditions in the near or mid-term."
* I don't think I've officially linked to Cornercopia's Twitter feed, if you haven't seen it yet. (And there's my Twitter feed, too, of course.)
 

The Capitol Riverfront BID has decided that everyone liked the summer outdoor movie series so much, they're launching a four-week fall outdoor movie series, held this time at Second and M, on the future Canal Park site. The lineup is: Star Wars on Sept. 10, Toy Story on Sept. 17, Spaceballs on Sept. 24, and Apollo 13 on Oct. 1. (And the press release on the movie series says that construction on Canal Park will begin in Spring 2010, which is pretty much the same start date that's been on tap for awhile now.)
Comments (0)