Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Boilermaker Shops/Yards
See JDLand's Boilermaker Shops/Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


74 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

It was a beautiful afternoon for a walk along the Anacostia River, and I was lucky enough to take my stroll within the boundaries of the forthcoming Park at the Yards. The 5.8-acre park is scheduled for a "late summer" opening, and it's definitely taking shape, as you can see in my new Park Construction Photo Gallery. (And thanks also to Mother Nature for the fab backdrop; compare the shots from my visit in March to see why I tend to avoid cloudy days if at all possible.) The park, for those not keeping up, is being built by Forest City as part of The Yards, but is being funded by the city through PILOT monies and then will be turned over to the Capitol Riverfront BID for maintenance and "programming" once it's completed. It's that public money that has allowed the park's construction to go forward during a time when private funding is pretty hard to come by.
The biggest news is that the 60-foot light tower on the water's edge at the foot of Third Street, which was originally not going to be installed until the park's second phase, is now going to arrive (by barge!) in July and be in place when the park is unveiled.
And, while the no-longer-salmon-tin-sided Lumber Storage Shed will be merely an open skeleton when the park opens, it sounds like maybe the possibilities of tenants are close enough that the Shed could be transformed into its glass-skinned retail pavilion new self sooner than might have been anticipated during the park's design phase.
(There also seems to be similar optimism about both the nearby Foundry Lofts and Boilermaker Shops projects getting on track. Forest City continues to work with HUD to get the financing squared away for the Lofts, and the Boilermaker Shops could get underway before the end of the year.)
Also in evidence in the Photo Gallery is the (ZOMG!!) dog park. which will be a fenced-in area on the far western edge of the park along the boundary with the 1905 WASA building.
So, wander through and read the captions for greater detail, and compare the photos to the park rendering at the top of the page to orient yourself and to understand what different sections will look like when completed.
Comments (0)
More posts: Boilermaker Shops/Yards, Dog Parks, Foundry Lofts/Yards, The Yards, Yards Park
 

With the opening of the 2010 season at the ballpark and lots of other interesting news of late, my blogging time and focus has been geared toward these bigger items. But there's a fair amount of little stuff that I point to every day on my Twitter feed (also available on Facebook), mainly news stories that might be of interest but that aren't really important or newsy enough to devote much more than 140 characters to. I may eventually transition to leaving those completely to Twitter, but I still feel guilty enough for now to round them up here on the blog every so often. But if you're wanting all news items at warp speed, best to start reading the Tweets.
* EYA has passed the news to me that all Capitol Quarter Phase I townhouse units are now sold. They are gearing up to begin sales of the Phase II houses, which will start "soon." (Though I wouldn't take your tent down to their sales office just yet.) I imagine they will do the releases of these next houses in groups based on location, as they did with phase I. It's still expected that the entire townhouse development will be built out by the end of 2012.
* Last weekend Bisnow took a walk around the neighborhood with a camera (a novel idea!), and gave their readers an update on some of the projects. The only section that I've not seen reported before is Akridge now saying that construction for their 700,000-sq-ft mixed-use Half Street project is now pegged at "hopefully before next baseball season," likely meaning 2011. But, "once shovels hit the dirt, the one residential and two office buildings will likely go up at once," Bisnow quotes an Akridge rep as saying. It also says that Forest City is "hoping" to get started on the Boilermaker Shops retail renovation at the Yards before the end of this year. (Lots of "hoping" going on!) There's even a picture of the Pillsbury Doughboy that gazes out over the neighborhood from Capitol Hill Tower.
* Voice of the Hill says there's a possibility of a temporary dog park being installed at the Virginia Avenue Park (Ninth and Potomac, SE), at least until CSX starts on its tunnel construction project (more on CSX coming in another post later today). This is coming to the forefront because the principal of Tyler Elementary has now banned dogs from the school's playing field.
* Some neat overhead photos from DDOT showing the progress on the 11th Street Bridges construction. I'm hoping to get some ground-level images myself before too much longer.
* CNN reports on how Nationals Park has become a very hot venue for political fundraising, actively pursued and encouraged by the team. "[F]ederal candidates, major political parties, and political action committees have spent at least $432,000 on fundraising events either at Nationals games or at their facility, according to campaign finance documents filed with the Federal Election Commission."
 

In a blissfully short 26-minute hearing, the city's Zoning Commission approved tonight the series of amendment requests to allow the Trapeze School New York to set up shop on Parcel O at the Yards, on the southeast corner of Fourth and Tingey.
The commissioners seemed satisfied with the information they had in the Office of Planning report and the submissions from Forest City and the Trapeze School, and asked few questions (Chairman Hood was clearly trying to move things along). This is a temporary approval, allowing the Trapeze School to be at the Yards for five years, or longer if a Special Exception is later granted. The text amendments also waved the on-site parking requirement for the school, with new commissioner Konrad Schlater saying he was "comfortable" with it because parking "is definitely overbuilt" in the area around the ballpark. ANC 6D had voted 7-0 in support of the case as well. It's now expected that the National Capital Planning Commission will address the Trapeze School at its Oct. 1 meeting.
No date for the opening of the school in its new home was mentioned, though it was explained that Forest City was trying to expedite the process since the school is having to vacate its home at the old convention center site. There will still be building permits to be filed for and approved before the tent can be lifted.
Toward the end of the hearing, Ramsey Meiser of Forest City gave a bit of an update on the other projects in the first phase of the Yards. Here's the latest:
* They are continuing to work with the city's Housing Finance Agency to get the money together to (re)start on the Foundry Lofts, with a hoped-for completion date of late 2010 or early 2011.
* The Boilermaker Shop could open in 2011; this dovetails with what a commenter in this thread reported hearing over the weekend, although earlier today Forest City would not officially confirm for me any scheduled start date for the project, only that some retail tenants have been signed, but that Forest City can't name them publicly just yet. (Maybe in October.)
* The first retail in the Park at the Yards (in the old Lumber Shed building) could open in 2012; the park itself is expected to open next summer.
* "Parcel D", on the southeast corner of Fourth and M, is the site of the expected Harris Teeter (though Meiser didn't name them, saying only "a grocery store," since neither Forest City nor Harris Teeter have confirmed this rumor yet), and is now apparently going to be a residential building instead of office, which had been hinted at recently. It's expected delivery date is currently 2013.
* The Factory 202 lofts building at Fifth and M is not expected before 2014.
And all that's just the first phase! Meiser also said that Parcel N, the site of a surface parking lot on the southwest corner of Fourth and Tingey, would probably be the first project of Phase 2. But no date on that yet.
If you want to watch the hearing, visit DCOZ's On Demand Video page.
 

Today's print edition of the WashBizJournal has some big retail-related Near Southeast items of interest:
* "The developer of The Yards, the 42-acre Anacostia riverfront project near the Nationals ballpark, is close to landing a jazz club and Dogfish Head Alehouse and may move its local headquarters to the former Navy Yard. The two retail tenants would be the first in the Boilermaker Shops, a three-story industrial building with walls of red brick and plate glass on Tingey Street between Third and Fourth streets SE." (The Boilermaker Shops are scheduled to open in mid-2010, along with the Park at the Yards and the Foundry Lofts.)
* The planned office building at 401 M could become home to Forest City Washington's headquarters; it's the one with the grocery store space in the ground floor. WBJ says Forest City "is 'nearing a deal' with a grocer for 50,000 square feet and an announcement could come in 60 days. He would not reveal the chain, but sources say it is Harris Teeter Inc. which has two D.C. stores and plans a third in Northeast." 401 M is not expected to be constructed before 2011, however.
* Also on the grocery store front, confirmation of the rumor that's been hashed around here lately: "William C. Smith & Co., meanwhile, has been in discussions with Whole Foods Market Inc. about a store in its planned 4-acre development between New Jersey Avenue, H and Second streets, known as Square 737." (See, I tried to tell you folks it wasn't going to be at New Jersey and K; and Jonathan, you're welcome for this tip.)
UPDATE: Finally getting *some* piece of news about 800 New Jersey finally spurred me, after all this time, to create a project page for it. There's no renderings, just a bunch of "before" pictures, but at least it's something. And, since talk of grocery store on this site back in *1999* was one of the first tidbits that led me to start paying attention to the neighborhood, I guess it finally deserves its own page.
Comments (0)
More posts: Boilermaker Shops/Yards, foundry, Harris Teeter, Retail, WC Smith/Square 737, wholefoods, The Yards, Yards Park
 

This morning inside the Boilermaker Shop at Fourth and Tingey Mayor Fenty announced the completion of a $42 million public-private partnership to fund and maintain the 5.5-acre Waterfront Park at The Yards. He was joined by Forest City's Deborah Ratner Salzberg, Ward 6 Councilmember Tommy Wells, and Capitol Riverfront BID executive director Michael Stevens, all of whom extolled the potential not only of the park (the neighborhood's "front yard", Stevens said) but of all of what is coming to Near Southeast. In the press release, Fenty is quoted as saying, "This is a great example of the kind of great urban spaces we can create when we think creatively and work together with partners who share our vision for transforming the banks of the Anacostia River into a world class waterfront."
Construction will begin on the park in January, and is being funded by the PILOT (payment in lieu of taxes) that the city created last year. Once the park is built, the BID will be in charge of maintaining and "programming" it. One caveat for those who have been looking forward to seeing the park completed--it is now scheduled for a mid-2010 opening, along with the Boilermaker Shop and the Pattern Shop Foundry Lofts (they renamed the dang building; I can't wait to change it everywhere on the site).
I took a few photos at the event (seems like it's been forever since there was one of these, especially after the avalanche of them back in 2007 and early 2008). You'll also see on that page the latest renderings of the park, the Foundry Lofts building, and some views along Water Street. The park images aren't new, but the others are, and it may be a few days before I get them integrated into the site, so I figured I'd toss them up here for now.
I also got to take a tour behind the fences across much of the 44 acres of The Yards, and of course snapped a bunch of photos. However, since there are hardly any *streets* in most of these locations just yet, it makes my cataloging and posting of pictures much more time-consuming than with other projects. So I hope to post them in the next few days. At least the sun was out, unlike last time!
There was a fair amount of media at this event, so check back for links to stories (and the press releases, once they're posted).
UPDATE: A video report from NBC4, and a few paragraphs from the Post. The AP gave it a little write-up, too. And the Yards has now posted its own press release.
Comments (0)
More posts: Boilermaker Shops/Yards, Foundry Lofts/Yards, The Yards, Yards Park
 

The skies were threatening during my visit, so these aren't the most shimmering photos, but I do now have a big batch of new photos from the areas along the Anacostia River that by the end of next year should be transformed into the nearly six-acre Waterfront Park at the Yards. Right now it's mainly a lot of dirt, so I suggest spending some time looking closely at the rendering at the top of the page to orient yourself to the locations of the various photos and what the vistas should eventually look like. (The map at the top of my main Yards overview page is helpful, too.) I also got some photos inside the Lumber Storage Shed, that oddly terra cotta-colored building near the water's edge which will be having its corregated tin exterior stripped and replaced with glass as it's turned into a retail pavilion.
I've also posted some additional photos in the archive at spots where intersections will exist later this year when River and Water streets are created and when Fourth and Fifth are extended down toward the water. (Again, look at the map.) Really, these photos are nothing more than placeholders, but I just had to have the "befores" in order to be able to enjoy the "afters" someday....
(And don't miss my photos posted a few days ago of the interior of the Boilermaker Shop and of the latest progress on the Pattern Shop Lofts building.)
Comments (0)
More posts: Boilermaker Shops/Yards, Foundry Lofts/Yards, The Yards, Yards Park
 

Last week the folks at Forest City were gracious enough to take me on a behind-the-fences tour of the The Yards, so that I could stock up on "before" photos before too much more work gets underway. The first stop was Building 167, also known as the Boilermaker Shop, on the northeast corner of Third and Tingey streets behind the US DOT HQ. This steel-and-glass industrial workshop (such a rarity for Washington) was built in 1919, and by the end of 2009 Forest City expects it to be transformed into a 46,000-square-foot retail space, with a new loft-like mezzanine in the middle of the building that will provide additional square footage without sacrificing the wide-open feel of the high glass-lined ceiling. I have wanted to get inside this building for a long time, so I'm glad to now have photos in advance of the shop's makeover, which you can see on my Boilermaker Shop page along with renderings of what's coming.
Across the street at the old Pattern Joiner Shop, interior demolition work continues, along with the removal of all the windows and the white paint from the building's exterior. We didn't get to go inside, but I've still posted some updated photos, which you can compare to shots from the past three years to see what's been done in just a few months. By late 2009 this will become the Pattern Shop Lofts, with 170 apartments, ground-floor retail, an interior courtyard, and two new floors on top.
I also snagged some photos from a few other locations, too, and I'll get those posted soon.
And, if you're wondering What's the Deal With the big hole punched in the historic red brick wall on M Street east of Fifth--apparently that's the start of the necessary work to create 5 1/2 Street, SE (no, I'm serious), which will run between the big red brick Building 202 (to be turned into condos by 2011) and Building 74 (forecast to be converted into townhouses in a future phase of the Yards). Here's an overhead photo of the spot in question, taken from the roof of the old Capper Seniors building before it came down last year.
Comments (0)
More posts: Boilermaker Shops/Yards, Factory 202/Yards, Foundry Lofts/Yards, Retail, The Yards
 

I've been coveting electronic versions of the newer twilight-styled renderings of upcoming Yards projects, which have been taunting me from the fence drapings along Tingey and Fourth streets; and now I've gotten my mitts on them. Above is an overhead shot of the Waterfront Park, showing not only the various landmarks planned for this stretch along the Anacostia, but also perhaps a first peek or two at designs for some of the later-phase buildings to the north of the 5.8-acre park. I've also now got dusk-time renderings for the brown-and-white Pattern Shop Lofts apartment building and the retail-to-be Boilermaker Shop. All three of these projects should open in 2009 (though the park's piers and retail pavilions will be happening in future phases).
Comments (0)
More posts: Boilermaker Shops/Yards, Foundry Lofts/Yards, The Yards, Yards Park
 

Responding to my inquiry about the windows that have recently been removed from the Pattern Shop Lofts building on the south side of Third and Tingey streets in The Yards, the folks at Forest City have let me know that interior demolition work is indeed underway on the World War I-era building. The existing interior walls, ceilings, plumbing, asbestos {cough} and whatnot is all being removed, in preparation for the actual construction/renovation work that is scheduled to begin later this year. Two floors will be added to the top of the building as part of its transformation into a 170-unit apartment building, which will also have 10,000 square feet of ground-floor retail. It's expected to be finished next year. (Its neighbor across Third Street, the Boilermaker Shop, is currently out for bid, and construction is expected to begin this summer to turn it into a 46,000-sq-ft retail space by fall 2009.)
Meanwhile, work has stopped at the 1345 South Capitol Street site (directly across from the ballpark), with the old buildings demolished and the site mostly cleared. Camden Development has been planning a 276-unit apartment building for this location, but I've been told that the company is "trying to decide what to do" with the project.
Comments (0)
More posts: 1325sc, Boilermaker Shops/Yards, Foundry Lofts/Yards, South Capitol St., The Yards
 

With the ballpark now humming along like it's been here forever (Tom Boswell has a litany of good things to say in today's Post) , interest is starting to turn toward what sort of retail/restaurant options are going to come to the neighborhood, and when. For your Friday time-killing pleasure, I've tossed together a quick a survey of what's either available now or will be coming within the next two years. (I'm not including already existing retail; I'm just looking at where new stuff could arrive.) As of now, I've seen no announcements of tenants for any of these spaces, but maybe if residents, workers, and ballpark fans clap their hands and wish real hard....
* 20 M - Completed in March of 2007, its 11,000 sq-ft of ground-floor retail space would seem to be an enticing location (just across the street from the Navy Yard subway station's ballpark exit), but so far there's been no takers. "Coming soon" signs that were in the windows last year for Wachovia and Kinko's are now gone.
* Capitol Hill Tower - A 7,000-sq-ft restaurant space in the ground floor of this co-op building has been advertised ever since the building opened in 2006, but no takers so far.
* 100 M - The 240,000-square-foot office building at First and M is scheduled to be completed later this year, and they're offering 8,500 sq ft of "corner restaurant/retail space" with "great ceiling heights, storefront and outdoor seating." (There's no ground-floor retail planned for Onyx on First in the same block.)
* 55 M - The first part of Monument's Half Street project is this 275,000-sq-ft office building now under construction at Half and M (it's the building on top of the subway station entrance). It has over 10,000 sq ft of retail spaces on Half, M, and Cushing, and should be completed by mid-2009. (See retail spaces 1 through 4 on this page at the official web site.)
* 909 New Jersey - For the folks who choose to walk from the Capitol South Metro station, the under-construction residential building at New Jersey and K is going to have 6,000 sq ft of ground-floor retail space when it's completed in summer 2009.
* Velocity - The ground floor of this 200-unit condo building at First and L will have retail (I can't find how much), and will be finished by late 2009.
* The Yards - By the end of 2009, the renovation of the old Boilermaker Shop at Third and Tingey into a 46,000-sq-ft retail space should be completed, and there is also 10,000 square feet of ground-floor retail space planned for the Pattern Shop Lofts building on the south side of Tingey, which should have its conversion into a rental building completed by the end of next year as well. Both of these are situated on the route that most Nats Express users walk along to get from the shuttle stop at 300 M to the ballpark. (But will the Nats Express run after this year?)
* Half Street Part 2 - The southern part of the east side of Half Street north of the ballpark is going to be a combination of a 200-room hotel and two residential buildings totaling 340 units, with about 40,000-sq-ft of ground floor retail to entice the throngs that walk along Half Street before and after games. (See retail spaces 5 through 8 on this page at the official web site.)
* 1015 Half - Opus East hasn't yet committed to whether there will be ground-floor retail in this 410,000-sq-ft office building at Half and L, though about 10,000 sq ft of space will be there.
* 23 I - If this 420-unit apartment building does indeed begin construction in September of this year, there could be 15,000 sq ft of retail available at Half and I by the end of 2010.
That's about 200,000 square feet of space to be filled within the next few years--and this doesn't include the retail spaces in the ground floor of the baseball stadium along First Street (who knows when those will be occupied). It's possible other buildings slated to have ground-floor retail could pop up between now and the end of 2010--1111 New Jersey and 250 M are the main candidates.
And there will also could be more offerings at the Yards by 2011 (including that grocery store planned for 401 M as well as the Lumber Storage Shed and other to-be-built pavilions at the Waterfront Park). And maybe the first building at Florida Rock, across from the ballpark's grand staircase, could be done by the end of 2011. But this is getting a little too far down the road....
 
74 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8