Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Barracks
See JDLand's Barracks Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


37 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4

This is a painful post for me to write. (No, seriously--I hurt my left thumb last week, and typing doesn't help.) But I will power through to bring you news of upcoming events, all while wondering why Decembers are always so busy with public meetings--because it's not like we don't we have enough to do already....
ADD: Oops. Tonight (Dec. 6) is the 4th Annual Livable Walkable Community Awards, at Arena Stage at 6:30 pm.
* Tuesday (Dec. 7) is the second Marine Barracks site search public forum, in Eastern Market's North Hall. I can't find the agenda for it, but the CIMP web site describes it thusly: "Session 2 will begin with at 5:00 pm with an open house where information will be provided in displays, and subject matter experts will be present to discuss various aspects of the CIMP with a facilitated discussion to authenticate community development objectives to begin at 7:00 PM." You can see the draft community objectives handed out at last week's meeting, and read my summary of that session, as well as the scads of posts through the past year of this process.
* Wednesday (Dec. 8) is the neighborhood meeting with DC Public Schools interim chancellor Kaya Henderson on the movement to reopen Van Ness Elementary at 5th and M, SE. The meeting is at 6 pm (note the time change) at the Courtyard by Marriott at New Jersey and L, and while no decision on reopening the school will be announced, DCPS will be talking about the preliminary findings from the survey they did this fall about whether there would be enough students to justify reopening the school. Read my previous posts for details.
* On Thursday (Dec. 9) the ANC 6B ABC Committee will meet at 7 pm at the Southeast Neighborhood Library at 403 7th St., SE, and it will be taking up the new liquor license application for the Bavarian Beer Garden at 8th and L, SE. It's looking to be a 99-seat tavern, with an additional 200 outdoor seats in summer, and would operate from 11 am to 2 am Sunday through Thursday and 11 am to 3 am on Fridays and Saturdays. There's also apparently the possibility of live entertainment. The application will also be taken up by the full ANC at its regular meeting on Dec. 14 at 7 pm at 535 8th St., SE.
* Monday (Dec. 13) is ANC 6D's monthly meeting--the agenda should be out later this week.
* Tuesday, Dec. 14 is the BID's Annual Meeting, at 11:30 am at 100 M St., SE. There will be a keynote address by George Hawkins, general manager of DC Water, plus the BID will release its 2010 Annual Report and State of the Capitol Riverfront.
* The BID also launches its Holiday Market on the 14th, running daily through the 18th on the sidewalk outside of 1100 New Jersey Ave., SE, across from the Navy Yard Metro station. "Shop the market for wool sweaters and mittens, homemade soaps, jewelry, antique maps, wreaths and holiday greenery, paintings, and much more!" See the flyer for more details, or the latest BID newsletter.
* Also on the 14th is the aforementioned ANC 6B monthly meeting, which includes a report by Michael Stevens of the BID on the Lower 8th Street Visioning Process report that's being submitted to the Office of Planning. (This will also be presented to the ANC's Planning and Zoning Committee on Dec. 7 at 7 pm at 535 8th St., SE.)
* Finally, on Dec. 17, the James L. Brooks movie "How Do You Know" opens--this is the one that was filmed at Nationals Park (and all around DC) back in 2009, and stars Reese Witherspoon, Owen Wilson, Paul Rudd, and Jack Nicholson.
Ow.
 

With the selection of a location for a new Marine Barracks more than a year away, there wasn't much big news coming out of Monday's public forum, at least not in terms of my focus, the area south of the freeway. (There were lots of discussions about the disposition of the Building 20, the barracks building at 8th and Virginia the Marines are trying to get out of--I'll be leaving the blogging about that part of the process to Norm Metzger, who has posted some thoughts from Monday's meeting.)
The handouts, displays, and presentation slides are now posted on the CIMP web site for your perusal. And it must be said that the feel of this meeting was more collegial and less antagonistic than some of the previous ones have been--getting Virginia Avenue Park out of the mix seems to have dialed down the temperature somewhat, though it's clear that both sides (the Marines and the community) are still cautious and not completely at ease in working with their counterparts.
At this point, there's much more focus on the process of it all rather than any specific outcomes--how the RFP will be written and what requirements it will have for developers, whether there will be a community representative on the selection committee (doubtful), and the like. Writing about process isn't really my cup of tea--I just want to know about what comes out at the other end! That said, If I had to come up with a few bullet points that were of interest or sounded new, here's what I'd highlight:
* The approach to finding a new site really has changed from when this started a year ago--originally, the Marines were only looking at public property (Virginia Avenue Park, Tyler Elementary, Square 882, the annex at 7th and Virginia, and inside the Navy Yard), but now there's the Square 929/930 option on the east side of 8th Street as well as the "Exxon" site at 11th and M. That changes how the process moves forward though, since there will now need to be special federal legislation to allow for a public-private venture. Doing this, though, means that any private lands that end up being used for the new barracks will stay on the DC tax rolls, since a developer will own the land and lease space to the Marines. It also pushes the timeline for the choice of a developer into 2012, with construction at least a year after the decision gets made. There will also have to be a NEPA process.
* The Marine Institute is "being BRAC'ed" out of the Navy Yard, and apparently will be moving to Building 20, taking up 25 percent of the new building (the maximum amount the Marines can occupy and have the building not need the security-required deep setbacks from the street). David Perry of Barracks Row Main Street called this news "a good thing." There will be lots of ensuing discussion about how the remaining 75 percent of that building/site should be structured. (North of the freeway! Outside of my boundaries!)
* It's been determined through the antiterrorism/force protection guidance that there can be underground parking at a new barracks, but that the parking control gate would need to be 82 feet away from the barracks.
* The US Department of Transportation expressed its interest in sharing a child care facility with the new barracks, since USDOT moved 6,000 employees to Near Southeast in 2007 without any sort of day care offerings.
* The DC Housing Authority seems open ("let's have a dialogue," David Cortiella said) to talking about the community center site at 5th and K, which the Marines would probably want to gobble up if they decided to build the new barracks on the annex site. A community center would then be part of any shared-use facilities built. But DCHA has some timing issues that would need to be ironed out, the biggest being that they are required by the Zoning Commission to file building permits no later than July of next year.
* Michael Stevens of the Capitol Riverfront BID talked about how the BID wants to see the RFP laid out, including urban design guidelines that would need to be adhered to: no blank walls, first-floor retail uses, no major surface parking, no loss of parks, no street closures (though he acknowledged that one might be tough), and preservation of existing historic buildings; using these guidelines on the 8th and 11th Street sites would be a big boon to the efforts to revitalize lower 8th Street (which David Perry of BRMS also talked about). He also mentioned making sure no land goes off the tax rolls as an important issue.
* The Barracks' commanding officer, Col. Paul D. Montanes, put particular emphasis on his desire to integrate the barracks with the community, specifically mentioning the Navy Yard's brick wall as something he wants to avoid. He called this process a chance to build something special, not "an eyesore or a prison," and said that he considers the Marines at the barracks to be "ambassadors," and he wants them to be part of the community.
There was a lot more (maybe I should scan my illegible notes and post them!), but those were the big items; you can look through the materials if you want to know more. (Never use me as a stand-in if this is a topic you're really interested in--go to the forums!) At the end of the meeting they handed out a draft Community Development Objectives document, which will be the topic of discussion at the next forum, on Dec. 7 at Eastern Market's North Hall from 7 to 9 pm (preceded by another open house from 5 to 7 pm). If you want to submit your comments to the Marines about any aspect of the process, you can do so online. (If you're just checking in, here's my previous posts on the search so far.)
UPDATE: City Paper was there, too, and has a more general summary, for people who maybe haven't been following along.
Comments (0)
More posts: Barracks, Community Center, 8th Street, meetings
 

Just a reminder that the first of two public meetings to update the public on the status of the search for a new Marine Barracks location is tomorrow night (Tuesday, Nov. 30), at Eastern Market's North Hall (7th and North Carolina, SE). It will begin with an open house at 5 pm, with informational displays and "experts" on hand to discuss the various aspects of the Community Integrated Master Plan (CIMP), aka the site search. Then, at 6:30 pm, "speakers representing the community of stakeholders will present their viewpoints, [...] followed by a facilitated discussion of community development involving all participants."
Here's the agenda, and the CIMP web site has plenty of other informational materials including a recent Process Update (which I wrote about last week), in which it's stated that "the Marine Corps has not settled on any specific site or concept" (despite rumors to the contrary), and that the concerns of the fans of the Virginia Avenue Park "have been heard loud and clear and addressed accordingly."
My previous entry also talks about the CLG Status Report handout (posted by Norm Metzger), which includes some "Art of the Do-Able" conceptual graphics (emphasis on conceptual) that show how either the 11th and M "Exxon" site or the 8th Street "Square 929/930" site could be developed in ways that would not touch the Virginia Avenue Park. There's also a similar graphic showing how the presence at the current BEQ site along Virginia east of 5th could be expanded without losing the soccer field, which would requiring the shifting of the planned Capper community center site.
If the comment threads on my posts anytime I mention the word "Marines" are any indication, it should be a festive gathering.
Comments (0)
More posts: Barracks, meetings, Virginia Ave Park
 

ANC 6B03 commissioner Norm Metzger has a report on yesterday's Community Leadership Group meeting on the search for a new Marine Barracks site. (I'm sorry, I just can't bring myself to call it the CIMP process on first reference.) My short version: there's no news on a site selection, and it appears that any RFP to build a new barracks is probably at least a year away, and even that date could be derailed if any sort of federal legislative action is needed to allow the sort of public-private development partnership that the Marines seem to be looking for. Norm's description of the meeting as being an "odd mix of frustration, clearly expressed community anger, and clarity" seems to be a good summary of where things stand from the group's point of view.
Norm also posted the CLG Status Report handout, which I think will be of most interest to residents for its "The Art of the Do-Able" conceptual graphics (emphasis on conceptual) showing how either the 11th and M "Exxon" site or the 8th Street "Square 929/930" site could be developed in ways that would not touch the Virginia Avenue Park. There's also a similar graphic showing how the presence at the current BEQ site along Virginia east of 5th could be expanded without losing the soccer field, which would requiring the shifting of the planned Capper community center site. (On this last one, I'll note that it looks like what is marked as M Street on the renderings is actually L Street, and the second graphic is showing a northeast view from 5th rather than the northwest as marked.)
Finally, there is this statement from the CIMP folks that seeks to address what it calls "some misperceptions circulating about the future of Marine Barracks Washington and the local community," centering mainly the idea among some residents that a site has already been chosen along with the rumors about what may or may not happen to Virginia Avenue Park. "It is very important that the Virginia Avenue Community Gardener group knows that their concerns have been heard loud and clear and addressed accordingly," the statement says, going on to say that "informal site design concepts strongly suggest that there is potential for options under which the Bachelor Enlisted Quarters Complex could be developed, without impacting any portion of the Virginia Avenue Park and gardens."
There are two meetings scheduled to update the public on the process, on Nov. 30 and Dec. 7 from 5 to 9 pm at Eastern Market's North Hall. More information on the entire process is available at the CIMP web site, or you can slog through my pile of posts on it all over the past year.
Comments (0)
More posts: Barracks, meetings, Virginia Ave Park
 

I'm trying to conserve energy on all things having to do with the Marines' search for a new barracks until some decisions actually get made, so today I'm just pointing you toward a post at The Hill is Home describing how the Barracks Row Main Street board passed a resolution endorsing the two blocks between 8th and 9th south of the freeway ("929-930") as their preferred site for the new barracks--and how that endorsement has riled up the fans of the Virginia Avenue Park and the community garden hosted there, who see BRMS's endorsement of the site as endorsing the "bulldozing" of the park.
The BRMS's executive director has quickly denied this, saying that the submitted proposal for 929-930 "replaces, at a nearly 2-to-1 ratio, the square footage lost as additional green space on other portions of the site," but the Save the Virginia Avenue Park Committee is, shall we say, skeptical and displeased, as you can see in the THIH's blog post and its comments thread. Controversy is a-swirling!
For a bit more background, you can also read my recent entry about the meeting where the unsolicited development plan for the 929-930 site recently submitted to the Marines by two landowners on those blocks was first mentioned. There was also discussion at that meeting about how any developer looking to work with the Marines on the Barracks project will need to demonstrate that they have control of all portions of the site they're proposing, which would be a dicey propostion if the 929-930 proposal includes any chunk of the park, since the National Park Service (which controls the park) won't state its views on the Marines taking part of the park until a NEPA process is completed. Unless the Marines convince Congress to pass "special legislation," according to Norm Metzger. My previous posts on the search process give additional background, if you're itching for more information.
But it's best to remember at this point that there are still no announced decisions on where the Marines may go. There are public forums scheduled for Nov. 30 and Dec. 7 to update the community on the process.
Comments (0)
More posts: Barracks, 8th Street, Virginia Ave Park
 

* The Marines have officially scheduled their "public forum" on their search for a new barracks location (officially dubbed the easy-to-remember Community Integrated Master Plan [CIMP] process) for Tuesday, Nov. 30, starting with an open house at 5 pm, followed by "speakers representing the community of stakeholders" who will "present their viewpoints," followed by a discussion period. It will be held in the North Hall of Eastern Market, at 7th and North Carolina, SE.
This won't be a meeting where the new location will be unveiled; in fact, ANC 6B commissioner Norm Metzger says "it will be a year or more" before a Request for Proposals for a new site will even be issued, with construction to start in 2013 at the earliest. (This is perhaps a little longer than the timeline that was talked about just a few weeks ago, which included a hoped-for start of construction early in FY13, better known as late 2012.) For more info, you can see the map of the remaining possible sites, as well as an updated version of their "Comparison of Key Components and Consensus Elements" of potential sites. And of course all of my previous entries.
* At the September ANC 6B meeting, I was told that CSX was expecting to announce that their first "public scoping meeting" for the Virginia Avenue Tunnel Project would be on Oct. 20; however, that planned session is being postponed, with a new date to be announced.
Comments (0)
More posts: Barracks, CSX/Virginia Ave. Tunnel, meetings
 

Here's a bunch of little items that aren't ridiculously newsworthy, but that might be of interest. Since it's Friday and many of you actually have lives, I suggest reading a few at a time, and keep coming back over the weekend until you get through all of them. Some I've already passed along via Twitter (which you can also follow by being a Facebook Fan of JDLand), but some are surprisingly fresh. Here goes:
Top items:
* The process that will beget the new Southwest Waterfront is now underway, and SWill at Southwest: The Fabulous Blog With the Funny Name (did I get that right?) reports on this week's public meeting by the developers. Current plans call for 560 residential units, three hotels totalling 600 rooms, 840,000 square feet of office, 335,000 square feet of ground floor retail, some sort of music hall / museum / maritime education offering, 2,500 underground parking spaces in five garages, and 400-500 marina slips, with 60 percent of the site area being public space.
* Back before 1015 Half Street was a slow-to-finish office building, it was an old industrial building that in 1995 became the Capitol Ballroom and then eventually the Nation nightclub. But from its construction in 1931 until it was sold at auction in 1992, the southwest corner of Half and K was home to the J.E. Hurley Machine and Boiler Works company. And thanks to the Kinorama Flickr stream that took the Twitterverse by storm this week, here's a shot of the Hurley building, undated but probably in the early 1990s. The outlines of the more-familiar Nation building are clearly visible.
* Pastor Mark Batterson, writing about the National Community Church's purchase of the Miles Glass site at 8th and Virginia, says that they are looking at some of the adjacent properties as well. "Our current lot serves our current purposes, but when we think in twenty year terms the additional lots would give us more upside potential."
Calendar items:
* On Friday, Oct. 8, the Susan G. Komen 3-Day Race for the Cure will be holding its opening ceremonies at Nationals Park. It's not just for participants, and friends and family are also being encouraged to attend. Walkers will start arriving around 6 am, with the opening ceremony beginning (with "community stretching" at 7 am). Afterward, the participants will begin their 60-mile walk (though I can't find a map to figure out their route). More information about the opening ceremonies and race here.
* Mayor-in-Effect Vince Gray is having a series of town halls during October, with the Ward 6 one scheduled for Oct. 27 at 8:30 pm at Eastern High School, 1700 East Capitol St. NE.
Tidbits:
* Because I'm worried that the Marines' hunt for a new barracks site isn't engendering enough conversation around here, I'll point people to Norm Metzger's report on last week's Community Leadership Group meeting that I wrote about here.
* The Examiner did a Three-Minute Interview with Sam Fromartz of the Virginia Avenue Park's community garden.
* It's time once again for the Capitol Riverfront Perception Survey. Tell 'em what you perceive.
Off-Topic:
* I've written a few times about my interest in Detroit, and whether it can come back from so far down. If you haven't been following along, here's a great essay with lots of photos, written by David Byrne. (Yes, that David Byrne.) (thanks to reader EH)
* And, for the ultimate Friday time-waster, here's my bottlecap chasing cat that thinks he's a dog.
 

Unless you're big on process, RFIs, RFPs, and the potential crafting of legislation, there isn't really much news to report on the Marines' search for a location for a new barracks site to replace the aging and unsecure Building 20 at 8th and I. I was at the Community Leaders Group meeting this morning (as an observer, not a leader), and here's a couple snippets I came away with, although the very process-heavy discussions left me in the dust for much of the session:
What was originally going to be a public planning "charrette" this fall is now going to be a community forum, probably sometime in mid-November, coming after the Marines release a Request for Expressions of Interest to get a first read on the developers who might be interested in formulating a bid. The public forum (and a separate one on the same day for developers and industry types) will center around discussions about the official Request for Proposals that will then be crafted. (See, your eyes are glazing over.)
There are a couple of developers who have already floated ideas to the Marines, including the team of Winfield Sealander and Leon Kafaele, who both own a fair number of the lots on Square 929 and 930 (the two blocks between 8th and 9th and Virginia and M, including the "Quizno's building", although some of the lots along Potomac Avenue have gone through a foreclosure sale). The developers who bid on this public-private venture will need to demonstrate that they control or will control the properties on the sites they are proposing to develop; this would seem to make any proposed use of the Virginia Avenue Park site a bit more interesting.
The Marines are also looking at whether existing legislation covers their needs to get the development underway, or if new legislation needs to be written; if so, it would probably be placed in the next Defense Authorization Act. The if-all-goes-according-to-plan timeline is to get funding in the FY12 federal budget, with construction starting early in FY13. There would also be a NEPA process somewhere admist all of this well.
This has been a lot of words to basically say that there isn't much to pass along yet for people (like me!) who just want to know what's going to happen, and where, and when. But the Marines and the community leaders are clearly very aware of the community opposition to losing the two acres of open space that Virginia Avenue Park represents, though the Marines don't rule out the possibility of plans that would relocate some of the park's uses, even though there no doubt would be opposition to that as well. But of course there's some amount of community opposition for almost every site that the Marines have identified. But with Square 882 now officially marked as "removed from consideration" on the Marines' map, the options for a site seem to be getting pretty narrow.
UPDATE, 9/27: ANC 6B commissioner Norm Metzger has posted his own fine summary of the meeting, which I should have just waited for rather than trying to do it myself!
 

A press release out today from DC delegate Eleanor Holmes Norton wades into the Marines' search for a location for their new barracks:
"The Office of Congresswoman Eleanor Holmes Norton (D-DC) released a letter today from Norton to Brigadier General Robert R. Ruark, Assistant Deputy Commandant for Installations and Logistics, objecting to the potential sites selected by the U.S. Marine Corps (Marines) as the location to replace the D.C. Marine Barracks known as Building 20. Norton objected to the criteria the Marines seem to be using to narrow site selection, and wrote that conveniences for the Marines appear to have trumped their consideration of other possible sites. She objected to the two potential sites, Square 929, where Dogma runs a dog day care business, and to Square 930, where the community has converted a former drug haven into a park and community garden where residents grow fruits and vegetables.
"In her letter, Norton wrote, 'Your emphasis apparently has been on selecting a site in close proximity to the Marine Annex and Barracks Row, a convenient walk for the Marines, whose training is perhaps the most rigorous of all the armed services. Notions of convenience for your Marines should not supersede important community concerns, including consideration of the convenience for the community and the displacement of important community assets.' "
The release goes on to suggest as a possible location an "empty lot on 5th Street, between K and L Streets, next to the Marine Annex parking lot" -- which would appear to be referencing the current proposed site for the Capper community center.
The Marines are supposed to be having a "charette" in October or November (pushed back from September) to discuss the direction the site search is taking. You can read more about it at the Marines' web site for the project, or browse through my (many) previous entries on the subject.
Comments (0)
More posts: Barracks, Capper, Community Center
 

Via ANC 6B commissioner Norm Metzger, the Marines have sent out a one-page Comparison of Key Components chart, looking at the four possible sites for a new Marine barracks that appear to still be in the running (Square 882 is not on the chart, so this letter must have worked). There's not necessarily anything new in this table, but if you haven't slogged through the documents on the project's web site, it's a nice quick overview of the pros and cons (from the Marines' standpoint) of each location.
It does look like maybe they're looking at using their current Annex site at Seventh and L a little more intensely than it seemed in their early public workshops, with the possibility of expanding its footprint westward to Fifth Street, which would mean taking over the site where a new community center is to be built, and demolishing the parking garage built just east of Fifth in 2004. (But a new community center could be built as part of the "shared uses" scenario that the Marines are looking to enter into as part of their new plans to "create a win-win solution" for both the community and the USMC.) The baseball and soccer fields currently on the site would most likely be taken over in this scenario.
The Square 929/930 and 11th Street Exxon sites both would mean that the Virginia Avenue PARK AND Garden would have to be relocated, and though the document says that "replacement sites to be provided with goal of no net loss," the PARK AND garden's fans are fighting hard to not lose their current location.
The option of relocating the barracks to a site within the walls of the Navy Yard is also still on the table, though with the Navy talking about its own needs for an additional 700,000 square feet, it would seem difficult to reconcile the two expansion plans within the finite space of the WNY.
There probably won't be much news on the Barracks front until the "charrette" in September (details TBA), unless the Development Fairy makes a surprise appearance before then and finds a location that pleases all sides. For more background on the search up to now, read my previous entries.
(UPDATED to prevent hordes of Virginia Avenue Park fans from burning me in effigy for mistakenly referring only to the garden and not the entire park.)
Comments (0)
More posts: Barracks, Community Center, 8th Street, Navy Yard
 
37 Posts:
Go to Page: 1 | 2 | 3 | 4