Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 909 New Jersey
See JDLand's 909 New Jersey Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


80 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

With a hat tip to a tipster who shall remain nameless, I'm passing along CapitolYardsDC.com, the new splashy web site launched by JPI to market its four Near Southeast apartment buildings along I Street, which will total 1,350 rental units and which together are being called "Capitol Yards."
The two buildings I always cover together as 70 and 100 I Street have been dubbed Jefferson and Mercury at Capitol Yards, and although they're right next to each other they will have distinctly different looks-and-feels. The Jefferson will have more of a "warehouse" feel, with "exposed brick and hardwood floors" for a "spacious loft-style atmosphere", while the Mercury next door will be going for "up-to-the-minute finishes."
Across the street, 909 New Jersey is now known as 909 at Capitol Yards, and its page touts a "two-story lounge with a modern bar, plasma TVs and a 90-inch projection TV" as well as an Asian-themed spa and a rooftop deck with "lounging and grilling areas." This building will also have restaurant and retail tenants on the first floor (which might also prove to be a handy stop for Nationals fans walking along New Jersey going to or from the Capitol South Metro station).
The pages for each of these projects also include animated views of the building's exteriors.
There's also a page for what's now 23 Eye at Capitol Yards (though I haven't decided yet if I'm going to always indulge that whole "Eye" thing), which has the first rendering I've seen of the building that will eventually go up west of Half Street (where the Wendy's and a towing company currently reside). Its page touts not only a rooftop pool, but also a rooftop dog park, which one would like to assume will be outfitted with very high fences. The 421 units are being described as "two-story true loft homes with 18-foot windows"; the site also says that the building will be Washington's first LEED silver-certified residential building.
You can wander through my project pages for each of these buildings to see where they're at (and what their lots looked like before). The furthest along are 70 and 100 I, scheduled to open in the summer, and are now topped out and getting their brick facades. The hole has been dug for 909 New Jersey, and it is supposed to open in mid-2009. Nothing has changed yet at the 23 I site, but construction is expected to start in 2008.
 

This week's Washington Blade has a long story describing the continuing difficulties seen by the old Near Southeast nightclubs in their attempts to reopen elsewhere in the city. Nexus (now becoming 909 New Jersey Avenue), Edge/Wet and Club 55 (on the block being redeveloped with the Velocity project), Ziegfield's-Secrets, and Heat (taken by eminent domain to make way for the ballpark) are all still trying to either find new locations or get approvals for locations they've chosen. Follies and Club Washington will not be reopening elsewhere. Velvet Nation, a gay dance night that was held at Nation, is looking like it will be reconstituted at a new gay dance club called Town, in Shaw.
 

Having decided that overhead views of Near Southeast from the ballpark and the Southeast Freeway over the past few days weren't enough, I've also now added a bunch of updated overheads from a vantage point at the Courtyard by Marriott, focusing on the many construction projects west of New Jersey Avenue. You can browse these new photos, or see the ones displayed with previous shots from the same location (scroll down a bit) to watch the changes since March of last year. (Hint: old buildings, followed by empty lots where old buildings used to be, followed by holes in the ground, followed by new buildings going up.)

 

After a week of days that were either overcast and drizzly or ridiculously hot and humid, today's sunny-and-warm profile gave me no choice but to venture out for a reconaissance mission. My report:
The masses of workers and the well-positioned fences make it nearly impossible to take photos of the current state of South Capitol Street, but I have added a decent photo to my Douglass Bridge makeover page showing the new South Capitol and Potomac intersection, which appears very close to being ready for traffic. Streetlights are in place, curbs have been built, paving has begun, and the historic globe streetlamps are installed all along the length of the bridge.
I also snuck a peek into the huge hole where Monument Realty's Half Street project is underway, and from N Street you can see what appears to be vertical construction is already underway at the bottom of the hole. It's along the M Street portion of the site, which will be home to the 55 M Street office building, which itself will contain the expanded entrance to the Navy Yard Metro station. Because that Metro work must be completed by Opening Day 2008, I guess it shouldn't be surprising that they're already pouring concrete and working upward, eight months into construction. The office building itself and the rest of the Half Street Phase I won't be completed until 2009.
And I unexpectedly found Demolished Building entry #138, as the beige garage that has long sat on the northeast side of the Half and I Street intersection bit the dust today, which I'm sure JPI is happy to see, given that 70/100 I Street is growing like a weed right next door.
Speaking of 70/100 I, it got updated photos today, along with Onyx on First and 100 M Street. You can look at those project pages (and their accompanying expanded archives), or you can browse this page showing all photos I've posted from today, which includes a few new shots of Capper Building #2, which I believe is just minutes from opening. And I even finally added a photo of the "Starbucks Coming Soon" sign out in front of the DOT HQ, for the caffeine-deprived.
 

I've been posting over the past couple days all sorts of new photos: first off, there's the usual update to the exterior views in the Stadium Construction Gallery's main page and the more detailed north-south-east-west pages. The big change is the arrival of the scoreboard steel on the First Street side, which has also helped to give the stadium its more rounded feel when looking at it from the north. And, if you know what you're looking for, you can see the first real shots of progress on the west parking garage at Half and N, although it's still kind of hidden by trees and construction equipment. There's also my final shots from up on the South Capitol Street viaduct north of Potomac Ave. (waaaah!).
You can also see some new shots from inside the stadium, where you can get a better view of the scoreboard's progress and also of the seats being installed in right field. And the outfield restaurant is moving along as well.
I got a big surprise when I rounded First Street onto Potomac Avenue Saturday morning--all of the trees and growth on the south side of Potomac were removed this week, and the fence marking Florida Rock's property was moved back, in preparation for the widening of Potomac Avenue. I posted a bunch of new pictures showing the change on my Florida Rock page, but I'm not sure the photos do it justice. And of course it's about to change even more late this week when the Douglass Bridge Extreme Makeover starts.
And finally there's a lot of new shots from various locations north of M that I took on Thursday, catching things like a new "Capitol Yards" sign at 909 New Jersey, progress on the Velocity Condos sales center, and even the new sidewalks on the northern portion of New Jersey Avenue if you have x-ray vision. It's hard to see in the photos, but the vertical construction at both Onyx on First and 70 I Street is now right at street level, so in the coming weeks expect those buildings to burst on the scene. You can see all these non-stadium updated photos compiled here if you don't want to poke around on the project pages.
That ought to keep everyone busy during a slow vacation-tinged week....
 

The speed of events is leaving me breathless these days. Today JPI held a groundbreaking ceremony at 909 New Jersey Avenue, where digging is about to get underway for the 237-unit residential building to be built on that block (former home of the Nexus Gold Club). You can see the obligatory photos of Dignitaries-With-Shovels here. (Yes, I did get my invite after all. Thank you!)
But there was big news tucked into the press release touting what JPI is now calling its "Capitol Yards" neighborhood along I Street (with 70 and 100 I Street across the way from 909 New Jersey about to sprout out of their deep hole): the announcement of plans for 23 I Street, a fourth JPI residential project on I Street, slated to have 421 residential units and as much as 35,000 square feet of retail space. Its location would be on the south side of I Street between Half and South Capitol, from Half over to (and including) the current Wendy's lot. (The moribund Exxon station does not currently appear to be part of the plans.) Construction wouldn't start before 2008. I haven't added it to my main map yet, but I've put up a few boring shots of what the block looks like as of now.
With that, the number of not-spoken-for lots in Near Southeast has just about dwindled to zero. Pretty much there's the block on New Jersey across from Capitol Hill Tower (though Akridge now owns a portion of it), the Exxon at South Capitol and I if JPI doesn't grab it, and the Metro Chiller Plant on the southwest corner of Half and L, which might not be made available anytime soon. (And I'm assuming that the rumors of Monument Realty picking up the Sunoco site at 50 M are true.) Everything else west of 7th Street is now spoken for. So if you were hoping to make your millions in Near Southeast and you haven't already staked your claim, your time's just about up, unless you can wrest some parcels out of some other developer's hands.
UPDATE, 6/11: Five days later, here's the Post's blurb on Capitol Yards.
 

I'm not sure how often readers look at my DC Government Feeds box on the home page, but I wait with baited breath each day as they're released, hoping for some tidbit of news; and today there's a double reward in the Building Permits list.
First, at the Velocity Condos lot at 1001 First Street, a sheeting/shoring/excavation permit has now been approved, so that digging work can begin on the three-level underground parking garages that will serve the two condo buildings that are the first phases of this project on Square 699N, the block that used to be home to Wet/Edge and Club 55. (I'm trying to make the switch away from the 699N designation, so for a few weeks I'll be referring to both the old and new names.) The first condo building is scheduled for completion in 2009; we should see the official web site launching soon, and the sales center at Half and K opening this summer. If you can't bear to wait to see what the first building is going to look like, I've added a rendering to my Velocity page (scroll down a bit); there are others on ADC Builders web site, but you'll need to click on "Portfolio", then on "Planning", then on "L Street Project" to page through them. (Damn Flash sites!) These renderings have been there for a while, but I've only recently confirmed that they are indeed of Velocity; but I've also been told that far nicer ones will be available with the official web site comes online. Anyway, look for the digging to begin along the west side of First between K and L soon.
The other issued building permit is for 909 New Jersey Avenue, the site of the old Nexus Gold Club and where JPI is building its second residential project in Near Southeast, across the street from the soon-to-be-above-ground buildings at 70/100 I Street. Quoting directly from the permit, but with typos fixed: "INSTALL ONE 40X70 TENT: NO LIGHTING GENERATORS COOKING PROPANE OR HEATERS. TEMPORARY USE FOR GROUNDBREAKING CEREMONY EVENT ON JUNE 6TH 2007." Fun! So if you see a big party at New Jersey and I on Wednesday, that's what it is. Alas, I haven't been invited; but there's still time to contact me, JPI!
More posts: 909 New Jersey, jpi, Square 699n, Velocity Condos
 

What a beautiful day! And with that weather, what luck that I had arranged some trips high up into a few of the tall buildings around the neighborhood to get new shots of the latest demolished lots and holes in the ground. I've uploaded these new pictures From Above and matched them with "before" shots on a whole slew of pages (you might have to scroll a bit to see the new pictures): Nation/1015 Half, the old Edge/Wet block on Square 699N, the North of M overview page, the Monument Half Street page (that's a biiiiig hole in the ground), the 100 M/Onyx on First page (where the construction on the Onyx end of the block is getting close to street level), 70/100 I Street, 909 New Jersey (showing the A1 garage all alone) and even the Stadium Construction Gallery (waaaaaay at the bottom, with a view from just a bit to the side of Dead Center Field, albeit four blocks away). I also created a new Overhead Photos page, showing all the ones I've posted on the site, grouped together by location. And I also created a special view with larger-than-usual pictures from today (don't miss it!), because it was so beautiful and you really could see forever from those high-up locations, and I wanted people to be able to see more than just little specks of buildings.
 

Today I saw for the first time new signs hung on the fence surrounding the firewood lot on the southwest corner of 1st and I Streets, emblazoned with "DRI Development/Office and Retail" (or some such). I have absolutely no information on this--this lot has been owned for quite some time by the Potomac Development Corporation, but I don't see any records as of yet in the online public records to indicate a sale has taken place, so perhaps it's a joint venture. Or not. I don't know. Anyway, I'll try to see what I can find out (whispers in my ear always welcome!), and hopefully some light can be shed on perhaps ANOTHER project getting started in the North of M section of Near Southeast, to go along with JPI's two residential towers, ADC Builders' Square 699N, Faison's Onyx on First condos, and Opus East's 100 M office building (and maybe the Nation site, too?), and perhaps something on the Sunoco lot by Monument Realty.
 

In addition to the new photos I posted yesterday in the Stadium Construction Gallery, I also now have for your perusal and enjoyment updated photos of the demolitions at 909 New Jersey (Nexus), Square 699N (Edge/Wet), and 1015 Half (Nation, work which is still just in its early stages). And, there's also new photos from another fun location. Plus, I've added a lot of additional shots to in the Photo Archive, so check the North oif M and the ballpark area intersections for more shots if you can't get enough--you can also look at a single page with my all photos from yesterday, and then click on the name of the intersection if you want to see the comparison shots.
Last but not least, I attended the ceremony today where JBG (developers of the DOT HQ) donated $4 million to the city to help fund the creation of both Canal Park and Diamond Teague Park, and I posted on those pages a shot or two from the festivities. UPDATE: Here's the Examiner's story on the donations and the plans for the two parks.
And now, I'd like to go back on vacation....

More posts: 1015 Half, 909 New Jersey, Canal Park, Square 699n, Nationals Park, Teague Park
 
80 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8