Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: One Hill South
See JDLand's One Hill South Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


45 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5

According to GlobeSt.com (story free for seven days), JPI as expected has completed acquisition of the eastern two-thirds of the block bounded by I, K, Half, and South Capitol, comprising the Wendy's lot and the lot to its east, with plans to build what is being called "Jefferson at the Ballpark," a 416-unit residential building at 23 I Street. This will be JPI's fourth building on I Street, joining 70/100 I and 909 New Jersey, which are all already under construction. Construction on 23 I is expected to begin in August 2008, and will raise JPI's total number of units in Near Southeast to 1,350. According to the article, this building will be "green," and will have a dog run and large open courtyard. For what the block currently looks like, check my not-terribly-exciting 23 I page. When the DC Property Sales database ends its summer vacation (apparently even web sites get to take August off in Washington), I'll tell you how much JPI paid for the 43,313-sq-ft lot, last assessed at $21.7 million.
More posts: One Hill South, One Hill South, Restaurants/Nightlife, jpi, Square 697n
 

The speed of events is leaving me breathless these days. Today JPI held a groundbreaking ceremony at 909 New Jersey Avenue, where digging is about to get underway for the 237-unit residential building to be built on that block (former home of the Nexus Gold Club). You can see the obligatory photos of Dignitaries-With-Shovels here. (Yes, I did get my invite after all. Thank you!)
But there was big news tucked into the press release touting what JPI is now calling its "Capitol Yards" neighborhood along I Street (with 70 and 100 I Street across the way from 909 New Jersey about to sprout out of their deep hole): the announcement of plans for 23 I Street, a fourth JPI residential project on I Street, slated to have 421 residential units and as much as 35,000 square feet of retail space. Its location would be on the south side of I Street between Half and South Capitol, from Half over to (and including) the current Wendy's lot. (The moribund Exxon station does not currently appear to be part of the plans.) Construction wouldn't start before 2008. I haven't added it to my main map yet, but I've put up a few boring shots of what the block looks like as of now.
With that, the number of not-spoken-for lots in Near Southeast has just about dwindled to zero. Pretty much there's the block on New Jersey across from Capitol Hill Tower (though Akridge now owns a portion of it), the Exxon at South Capitol and I if JPI doesn't grab it, and the Metro Chiller Plant on the southwest corner of Half and L, which might not be made available anytime soon. (And I'm assuming that the rumors of Monument Realty picking up the Sunoco site at 50 M are true.) Everything else west of 7th Street is now spoken for. So if you were hoping to make your millions in Near Southeast and you haven't already staked your claim, your time's just about up, unless you can wrest some parcels out of some other developer's hands.
UPDATE, 6/11: Five days later, here's the Post's blurb on Capitol Yards.
 
45 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5