Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 70/100 I
See JDLand's 70/100 I Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


77 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

Word has just arrived that there's a "Preview Grand Opening" this weekend for JPI's first two "Capitol Yards" apartment buildings, the brick siblings at 70 and 100 I Street (officially known as Jefferson and Axiom at Capitol Yards). There's apparently now a leasing trailer on I between Half and South Capitol (next to Wendy's perhaps? I haven't been by in a few days), and tours of the new buildings will start there, with the preview running from 10 am to 6 pm on Saturday and Sunday (the 17th and 18th). The two buildings will have almost 700 rental units available, and should have some pretty amazing views of the neighborhood and the Capitol dome (and the freeway!). (The building permits for rooftop pools on both buildings just came through within the past few days.) The official web site is at capitolyardsdc.com; you can see the history of the project (which broke ground in fall 2006) on my 70/100 I project page. These are the first residential units to open in Near Southeast since Capitol Hill Tower was completed in spring 2006, and they are the first rentals. It's expected that Onyx on First (now apartments, at least last I heard) will be opening later this year as well, adding another 266 rental units to the neighborhood.
Comments (0)
More posts: 70/100 I, jpi
 

Since it's such a rotten day, I'll go back to when the sun was shining (Tuesday), and give you my first-ever photos from the roof of 20 M Street. (I've taken a few photos from inside the 10th floor going back to April of last year, but from the roof I don't have deal with the pesky glass reflections.) Here are these new photos matched with the oldest ones from the same angle, so you can compare 13 months' worth of changes easily; you can also look at all the photos if you want to watch the progression of changes. There's views to the north (above), showing the digging now underway at 1015 Half Street along with the construction progress at 70/100 I, 909 New Jersey, and Velocity (plus the site-clearing at 23 I). To the south is the increasingly-shiny 55 M, as well as the ballpark, of course. I also tossed in some photos toward the west, showing the skyline of Southwest.
 

The surprise appearance by the sun on Thursday gave me the chance to update some north-and-east photos on the way to the ballpark, mainly along Half Street, with a few from First, Cushing, and Van thrown in. You can see the entire batch of new photos, or you can check the 70/100 I, 909 New Jersey, Velocity, and Monument Half Street pages for a little bit of context as to what you're seeing, or you can look for the icon by intersection (Half and I, Half and K, Half and L, Half and M, First and I, Cushing and L, Cushing and M, Van and M). Make sure to check out the new photos I took last week along First Street if you missed them, to get a pretty complete view of what's happened in the neighborhood in the past two years. (Or just come down and see for yourself.) Hopefully soon I'll get some additional updated shots from along South Capitol Street and New Jersey Avenue (which will be changing thanks to 909 New Jersey now beginning the showy phase of its construction).
 

Caught a break with such beautiful weather today, and so I snagged a new batch of overhead photos from up high at the Courtyard by Marriott. I took the entire batch, both east and west, and have paired them with the first ones I took, in March 2006. It's quite a difference; these are the views that people should see when they're carping about "how the area around the ballpark is one big construction zone" -- yes, it is, but look what that construction has done in just two years. (And think of what the commentary would be if this construction *weren't* happening.) You can also toggle to include all the photos from here in 2007 as well, to watch the process step-by-step.
These photos show the progress of 100 M, Onyx, Velocity, 70/100 I, the changes with the Capper Seniors buildings and all the demolitions (and new parking lots!) at Capper. There's even the first views of 909 New Jersey coming up above ground level. I'm still adding some updated photos to those project pages, but you'll get the idea.
 

When setting out to photograph a changing neighborhood, it might initially seem like a good idea to create a scheme where you take photos of 16 different views at each intersection (from up to four different angles) so that you don't miss anything and so that you can easily match photos as time goes on--until you arrive at a time when there are more than 30 intersections where visible change is happening on a day-to-day basis. Then you end up taking nearly 500 photos in one 90-minute walkabout on a sunny Saturday afternoon (without even venturing near the shiny new ballpark that's only two weeks away from opening), making you almost embarrassed when it's time to post a selection of them on your obsessive-compulsive web site.
This is all just hypothetical, of course.
Yesterday was the first time I saw the striped and open-to-traffic First Street north of M, now widened to four lanes with a bike path, and it's kinda different from the First Street I've spent so much time on these past few years. (The four new buildings with one more about to pop up might be part of the feeling, too.) Here's a gallery of before-and-afters for First Street at I, K, L, and M so you can see the changes. This was the first time I've been able to take a complete set of pictures at First and I in nearly a year, so it was especially nice to get those updated.
I also took new photos along Half Street between I and M, Cushing at L and M, and a smattering along M at South Capitol, Van, and New Jersey. And the wide views from the freeway at South Capitol Street. (My previous entry has the links to the photos I took of the various parking lots under construction.) For all of these, don't forget that clicking on the icon will show you all photos in the archive of that location if you want to see the progression of the changes.
Of course, many of these new photos are also now on the project pages for the under-construction buildings: see 70/100 I, 909 New Jersey, Velocity, Onyx, 100 M, and 55 M for details.
(There sure were a lot of folks taking either a drive or a walk through the area yesterday--let the onslaught begin! And thanks to those who said hi while I was out and about ["Are you the one who does that web site?"]. As always I appreciate everyone who made the effort to not run me over when I was standing in the middle of the street taking pictures. My days of being able to do that may be at an end, though.)
 

With raze permits having been filed recently for the Wendy's on I Street and its little gray neighbor to the east along Half Street, we knew that their days were numbered. JPI informs me that Wendy's will be closed by May 1, and that demolition on the two sites will happen over the summer, to allow construction on the 421-unit 23 Eye at Capitol Yards to begin in September.
Also, JPI's Capitol Yards buildings at 70 and 100 I, which together will have nearly 700 rental units, are now scheduled to open in June and July, respectively. 70 I is known as "Jefferson at Capitol Yards", while 100 I has snuck in a name change and is now "Axiom at Capitol Yards" (after a brief interlude as "Mercury").
In the meantime, the fourth Capitol Yards sibling, 909 New Jersey, is just about at ground-level, meaning that Nats fans walking on New Jersey Avenue to get to and from Capitol South will soon see a new skeleton rising up. The 237-unit rental building is scheduled to open next year.
The official web site has animated computer renderings on Jefferson, Axiom, and 909, and a mailing list for those interested in more information.
 

Raze permits have now been filed for the Wendy's at 23 I Street and its little gray neighbor at 901 Half Street on the corner of Half and I. These two lots totaling about 47,300 square feet were purchased in late July for $28.625 million by JPI, and the company is planning "23 Eye at Capitol Yards," a 421-unit residential building with up to 35,000 square feet of retail space. Late last year JPI was saying that 23 I would start construction this August--I haven't seen anything lately on whether that's still the case. I haven't had a chance to swing by Wendy's to see if they have a closing date, so if anyone thinks to ask while they're at the drive-through window, let me know. This project would be the youngest of the four Capitol Yards siblings, joining 70/100 I arriving later this year just across the street and 909 New Jersey coming in 2009 one block to the east.
 

Yesterday I posted a whole batch of updated photos of the ballpark's exterior; today you can check out the project pages for the residential projects 70/100 I Street, Onyx (both opening later this year) and Velocity (2009) along with the office projects 100 M (2008) and 55 M (2009) for lots of new shots of those projects, or you can look at alllllll the photos from yesterday on a single page (ballpark shots, too). Don't forget the icon if you want to look at how an intersection has changed over the past few years.
Items of note from my wanderings:
* The south side of I Street is now paved between New Jersey Avenue and Half Street, and I've been told that I Street will be "driveable" by Opening Day;
* First Street is now paved south of K, and paving up to I doesn't look far off;
* The Merritt Cab garage at First and K now has a "Moving March 31, 2008" sign on it; and
* JPI's 909 New Jersey Avenue residential building (between I and K) is not far from reaching ground level, so be prepared for the arrival of another skeleton in the skyline before long.
If *I'm* finding it all hard to comprehend and harder to keep up with, I can only imagine how non-obsessive observers must feel. I'm kind of looking forward to the pace slowing back down a bit come May....
 

Let's take a breather from all this parking stuff (which I had my fill of about two years ago) and get back to the original JDLand modus operandi--posting lots of photos of the neighborhood. Yesterday's press conference on the-subject-I-just-said-I-wasn't-going-to-talk-about was held on the 10th floor of 20 M Street, giving me a chance to update my photos from that perch, with views of 70/100 I, Velocity (now working on floor #2), the 1015 Half Street site (where nothing seems to be happening just yet), 55 M, and the ballpark. You can see all photos I've taken from atop 20 M in the past 10 months, or just compare the oldest and newest ones (there's been a few changes!).
Switching to the opposite side of the neighborhood, I took a few shots from Poplar Point on Sunday of the ballpark and The Yards.
You can also see all the new photos (along with the ones taken inside the ballpark looking out at the surrounding neighborhood) on a single page.
I hope to get out this weekend and update the ground-level photos of all the latest happenings.
 

I wandered around on Sunday for a photo session, wishing that spring would hurry up and get here so that the sun will rise higher during the day and set farther west so that I can stop dealing with the damn glare whenever I face southward.
* I have new images along N Street just north of the ballpark between Half and First, which show the work at the entrance plaza at Half Street, including glass now being installed on the ground floor of the western parking garage, as well as the structures that will make up the entrance gates.
* In fact, I updated all 12 angles of the Half and N intersection, which now that it has its new wide sidewalks, curbs, streetlights, and an initial paving job, is really a stunning testament to 24 months of change, not only on the four corners of Half and N but the blocks to the north as well. It's definitely worth a look.
* I took a lot of photos of the now-demolished Willco stretch along First Street (and gave the project its own page as well), and of course I got all the usual angles of 55 M Street.
* On Half Street between I and K, where JPI's 23 I Street residential project is expected to start this year, a pile of red-and-black advertising banners have been hung on every available surface, and a "JPI Permit Parking only" sign has appeared on the entrance to the former towing company's parking lot on that block. I'm guessing JPI's purchase of the property just closed. I haven't heard anything about potential start dates for this project, or when the Wendy's might close.
* If you browse all the photos I took yesterday, you'll also see a smattering of 70/100 I and 100 M shots as well as images of the two blocks along Third Street where temporary surface parking lots are going in (so now my pictures of those blocks have changed from post-demolition views of nothing to pre-blacktop views of nothing). And the always popular shots from the SE Freeway at South Capitol are updated, too.
And don't forget to click on the icon wherever you see it to see all photos in the archive of a certain location.
 
77 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8




                  © Copyright 2024 JD.