Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 600 M/Square 882/Old Capper Seniors
See JDLand's 600 M/Square 882/Old Capper Seniors Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


54 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6

The final touches are starting to be put on Capper Building #2, the wraparound addition to the Carroll Apartments at 4th and M. It's expected that new residents will start arriving in July, with full occupancy by the end of the summer. While this was originally planned as a building for low-income senior citizens, there was a modification to its zoning back in March to allow younger residents with lower incomes as well. Seniors who have lived at Capper / Carrollsburg but chose not to move to the new Capper Seniors #1 when it opened in December get first dibs on units in this second building, followed by other former Capper residents who meet the requirements of having an earned income and having participated in their community supportive services program. Applications are also being accepted from non-Capper residents who have incomes between 50 and 60 percent of the area median income (just under $38,000 for a single person or $54,000 for a family of four). If you meet the income requirements and are interested in applying, you can visit the BallparkApts.com web site for more information, or call 202-546-1024.
As for the old Capper Seniors building at 601 L Street, it is scheduled to be demolished sometime this summer late this year. Temporary surface parking lots will be built on the site in time for the opening of the ballpark in spring 2008, but long-range plans call for office buildings to be eventually developed there.
UPDATED 6/19 with the revised timeline for demolition of the old Capper Seniors building; it's now scheduled to happen toward the end of 2007, thanks to hazmat abatement needing to take longer than originally planned.
More posts: 400m, 600 M/Square 882/Old Capper Seniors, The Bixby, Capper, Capper Senior Apt Bldgs, The Bixby, zoning
 

The agenda for May ANC 6D meeting has been sent out (though it's not yet available on their web site). In addition to a presentation and vote on the Waterside Mall plans, there's a bunch of Near Southeast-related items on the agenda, ones that I've been posting about here for a while:
* There will be a presentation and vote on 1325 South Capitol's resubmission to the Zoning Commission as a PUD (that hearing is now scheduled for May 31). This is the planned 276-unit residential building across the street from the Nationals ballpark, which because of some procedural muck had to resubmit its plans in a different format.
* Also scheduled is an update by the DC Housing Authority on the latest goings-on at Capper/Carrollsburg, including status reports on the Senior Buildings (which I imagine will include the change for Capper Building #2 [aka the "Ballpark Apartments"] to allow workforce-level residents in addition to low-income seniors), as well as on the planned demolition this summer of the old Capper Seniors building at 7th and M, and the latest with the townhomes at Capitol Quarter, as more market-rate houses go on the market and with infrastructure construction expected to begin soon (and "vertical construction" probably starting in early fall).
* And there's also a presentation and vote on the (gaaaaak) Supplemental Stadium Surface Parking plan that's having its zoning hearing on May 21. My Stadium Transportation and Parking page (and its News Items tab) can give you the gory details.
This meeting is scheduled for the same time as Monday's Zoning Commission meeting, which includes on its newly-posted agenda the final approval vote on the 250 M Street office building project (which has been delayed a bit over the past few months), so it's a tough call which one I'll be focusing on. (Especially since we know how much I love ANC meetings.)
 

On April 9, the DC Zoning Commission will be entertaining Case 07-08, an emergency request to allow for changes to the Capitol Gateway Zoning Overlay to allow for the construction of temporary surface parking lots--to last no more than five years--on certain squares within Near Southeast. There is also a companion case, 03-12E/03-13E, specifically requesting a minor modification to the Capper/Carrollsburg zoning orders to allow surface parking lots on four squares within Capper--the three blocks bounded by 2nd, I, M, and 3rd (next to Canal Park) and on Square 882, the current home of the old Capper Seniors building, which is expected to be demolished this summer.
I'm not going to go into great detail, because I need to pace myself on the subject of parking or else I will pop a vein before Opening Day. But here's the gist: the city and the Nationals want to be able to build temporary surface parking to handle the estimated 3,800 cars that will need parking beyond the 1,225 spaces on the stadium site. These lots will be available as public parking during non-event times (so you DOT workers who want to drive to work should be paying close attention). This zoning request covers certain squares directly around the stadium and at Capper; apparently there will be a subsequent submission requesting similar amendments to the Southeast Federal Center Overlay to allow surface parking there as well.
As to why the Office of Planning is supporting this request, here's a quote from their report to the Zoning Commission (emphasis mine): "Although much of the parking needed to serve the Ballpark's patrons will eventually be accommodated by parking within nearby future buildings, these buildings will not yet be constructed when the Ballpark opens in 2008. While OP strongly encourages the use of mass transit and encourages the Nationals to provide meaningful incentives for the use of mass transit and other alternatives to the private automobile, OP shares their concern that a short term shortage of parking available to patrons could lead to illegal parking on streets and private property in the surrounding area, and could have an impact on the short term success of this important District facility. This proposal would help to address the short term need for an interim parking solution."
And, another OP quote (again, emphasis mine): "Normally, OP is not supportive of surface parking lots. In addition to being a poor use of the District's valuable land base, extensive surface parking lots disrupt neighborhood fabric; can be a source of crime, noise, trash, and light-spill; encourage the use of the private automobile over other less environmentally damaging forms of transportation; and contribute significantly to storm water run-off water pollution problems facing our great river systems. OP would not support surface parking on these squares as a permanent use to address currently perceived parking need."
For more background and explanation of OP's stance, I strongly suggest reading the OP report (specifically the last four pages).
And, against my better judgment, I have created a new Planning for Stadium Transportation and Parking page, pulling together the various documents that have been released recently (mainly from last month's TOPP meeting). I've also thrown together a map that is nowhere near official marking what I understand to be various possible locations for stadium parking. It will change as time goes on, and do not take it as gospel, but it does show which sites come under this zoning request, along with other possible sites. Opening Day is still a year away, and there will be much jawboning on this subject over the coming weeks and months. So, everyone take a deep breath, keep an eye on updates as more information gets released, and try not to panic too far ahead of time.
UPDATE: And with fine timing, Near Southeast's councilman Tommy Wells has just announced the creation of a new transportation task force for Near Southeast and Southwest, bringing together representatives of the government, residents, and developers to address the concerns of neighborhoods facing not only baseball, but also the coming influx of thousands of new workers and residents.

Comments (0)
More posts: 600 M/Square 882/Old Capper Seniors, Capper, Capper New Apt Bldgs, Capper Senior Apt Bldgs, parking, staddis, Nationals Park, The Yards, zoning
 

The latest weekly permit report from the DC Historic Preservation Office shows that a raze permit application has been filed for 601 L Street, SE, which is the address of the old Capper Seniors apartment building. This is not a huge surprise, I've been hearing that the plans are for this building to be demolished by the end of this year (mainly so that the lot can be cleared in time for Opening Day 2008 so that it can be used for baseball parking). Some of its residents have already been moved to the newly opened Capper Seniors #1, and the rest should be moved by the end of spring into Capper Seniors #2. It will be quite something to watch that building come down.

More posts: 400m, 600 M/Square 882/Old Capper Seniors, The Bixby, Capper Senior Apt Bldgs, Capper Seniors/900 5th St., The Bixby
 
54 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6