Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 55 M St.
See JDLand's 55 M St. Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


63 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7

I took advantage of great weather and an unplanned opening in my schedule to make a photo run through the Hood on Monday. The pictures that will probably be of most interest are of the east and south sides of the stadium exterior, which I've been unable to get shots of since First Street and Potomac Avenue were closed to traffic and pedestrians a number of weeks back. While the stadium itself doesn't look incredibly different on those sides (lots more window glass being installed, including in the areas along First Street slotted for retail), I did get a nice surprise when I found a new sidewalk already in place on the south side of Potomac Avenue east of South Capitol. But don't be expecting to get to "drive the ballpark circuit" again much before Opening Day--the infrastructure work on Potomac and on First (and eventually on I) is scheduled to continue through February. (I also want to plead my case that I've now lost a lot of my "guideposts" around the stadium that I used to line up my before and afters, so if you determine that new photos aren't 100 percent in the same location as the old ones--just remember, as usual, you get what you pay for here at JDLand.)
I also made it to Poplar Point with camera in hand for the first time in two months, and posted a few of those shots, with more to come in the next few days. And there's a lot of photos of 70/100 I, Onyx, and 100 M, although not the complete lineup that I usually post--I hope to get the rest, along with the north and west sides of the ballpark, this weekend. Onyx and 70 I appear to be within seconds of completing their top floors, with their siblings 100 I and 100 M not too far behind. And believe me, I can't wait for those four buildings to get their exteriors finished, so I can rest a bit! Of course, it'll be a short breather, since Monument's 55 M is now at ground level, and the concrete is being poured at the bottom of the Velocity Condos hole.
You can also see all the photos I posted from today on a single page, though it might be too much to digest in a single sitting.
 

Hot on the heels of the uber-successful Stadium Construction Web Cam, there's now a new webcam available, showing the progress of Monument Realty's Half Street project, which includes the expansion of the Navy Yard Metro station. And it shows that the vertical construction of 55 M Street (the 275,000-sq-ft office building at the corner of Half and M that will house the subway entrance) is nearly to ground level. Also, I'm psyched that I can now keep an eye on the properties along First Street without taking off my fuzzy slippers, to watch for if and when those buildings get demolished. (It also shows that the GPO building at The Yards is still partially standing.) For baseball fans, it does show a smidgen of the ballpark, mainly from the restaurant eastward and southward, as well as all of the eastern parking garage. The images go back to Aug. 28, but I guess I kept overlooking the webcam link on the official Half Street web site.
UPDATE: Alas, the web cam has spent most of the day frozen at 12:51 pm. Hopefully someone will go to the top of 20 M Street and kick the tires.
UPDATE II: And now it's back.

 

Within the past few days Monument Realty has added a couple of new renderings to its Half Street web site (which it's now moved to halfstreet.com from halfstreetdc.com). The new featured view is looking south down Half Street from M Street, toward the ballpark, showing the east entrance to the Navy Yard Metro station at left, on the first floor of their 55 M Street office building. This image also gives the first hint of what they might have planned for the west side of the street, if they did indeed win the bidding for the Southeastern Bus Garage site on the southwest corner of Half and M--I don't see any indication of the garage being preserved. Also, under the "Work" icon, there's a new image of 55 M, which appears to indicate that they've dispensed with the large LED screens they had originally planned to use to shield the Metro entrance from the street, and are now planning a more standard glass-enclosed entrance. I've added both of these images to my Monument Half Street project page; I should also note (h/t to reader Tom) that banners advertising the project have now been hung on the fences along Half and M.

More posts: 55 M St., Monument Valley/Half St., staddis
 
63 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7