Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Homewood Suites
See JDLand's Homewood Suites Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


75 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

I'm just going to bullet-point all this stuff. Follow links for additional background. (See my entry from last night for news on the ANC's discussion about parking and traffic issues during the first games at the ballpark.)
* The commissioners voted to support Forest City Washington's plans for an office/residential/retail project (including a grocery store) at 401 M Street in The Yards. This support hinged on a Memorandum of Understanding on community benefits being offered by Forest City, including a lottery that could allow a 25 percent preference (or higher) for ANC 6D residents when it comes to the 30ish affordable housing rental units in the 194-unit project. (The final verbage of the MOU was hashed out at the meeting; talk about watching the sausage get made.) An audience member complained that LEED certification for the project should not be considered an amenity, but Forest City replied that the city's green building law does not go into effect until 2012, and these buildings are expected to be completed in 2011. Other components include preferences for ANC 6D certified business enterprises and a promise to report yearly to the ANC about the project. A lack of a community benefits package had tripped up this request for support at the ANC's April meeting. This project now goes to the Zoning Commission for a Southeast Federal Center Overlay Review on April 24.
* A request to support William C. Smith's modifications to its plans for 250 M Street (raising the height of the building to 130 feet) was postponed, as the commissioners expressed their unhappiness at the lack of any community benefits. The developer's representatives said that community benefits were part of the original approval of the project as part of the Capper/Carrollsburg PUD, and that this modification is not resulting in any increase in square footage from that original plan. Commissioners had no suggestions for what benefits they would be seeking, only that they want more. This project may be back in front of the ANC at its May meeting, since the Zoning Commission hearing on the PUD modification isn't until late May.
* A request to support a public space permit request by Five Guys to add an outdoor seating area at its Second Street location was turned down, not only because the commissioners said that Five Guys had not provided information on the request to all the commissioners in a timely manner but because there's no offer of, you guessed it, a community benefits package in return for the "public space" being taken.
* A representative of the Department of Consumer and Regulatory Affairs updated the commission on plans to add 40 vendors on the streets surrounding the ballpark, thanks to emergency legislation passed on April 1 by the council. The mayor is expected to sign the act today, at which point DCRA will have 21 days to identify sidewalk locations for the vendors to set up shop. It's not expected that any will be on South Capitol Street or on M Street (thanks to narrow sidewalks), and rules prohibit vendors on residential streets. However, in a few months a larger initiative will get underway, with the Capitol Riverfront BID's involvement, to create a "Development Zone" allowed for in the recent overhaul of city vending regulations, which will give the city and residents greater say in where vendors are placed, what they sell, and the appearance of their carts. And, in response to questions from commissioners and audience members: no cigarettes or alcohol will be sold at these carts, and there don't appear to be any concerns on the city's behalf about terrorism related to these carts or their operators. (I'm just reporting what was asked.)
* The commission voted to support the liquor license application of former O Street clubs Ziegfield's and Secrets to reopen at 1824 Half St., SW, at the site of the old "Lime" nightclub. A voluntary agreement with the clubs' owner was reached to address concerns about traffic, cooperation with police, and community input.
 

If you like photos of streetscapes taken under overcast skies, this has been the site for you lately. Yeesh. On Saturday, before the rains came, I updated my shots of the western side of New Jersey Ave., showing how projects like 909 New Jersey, 70/100 I, Onyx, and 100 M have changed the view in the past year. At least the sun was out for the brief time on Friday evening when I took new photos of the western side of the ballpark, along South Capitol Street. So, adding these to the photos I took earlier in the week of First and Half streets, the current state of construction in Near Southeast is pretty well documented. And now the sun shall come out, but I'll be waiting a few weeks until the next round of updates (probably early May).
Monday brings some meetings with Near Southeast items of interest. At 6:30 pm the Zoning Commission will have its monthly meeting, and is scheduled to vote on whether to open up additional blocks in Southwest to possible temporary surface parking lots (you can watch via live webcast). At 7 pm at St. Augustine's church at 601 M St., SW, ANC 6D will have its monthly meeting, and will be looking at Forest City's plans for office and residential buildings at 401 M Street/400 Tingey at The Yards, and the request by the developers of the proposed 250 M Street office building to increase its height to 130 feet. The project at The Yards has its hearing at the Zoning Commission on April 24, and 250 M's is scheduled for May 14.
And, for this week's visit from the Pope, the Post has a huge graphic of road closures and other information to help get through the festivities. Note that, in addition to the closure of South Capitol Street from 2 am to 2 pm Thursday, it shows that Van, Half, First, and Potomac in SE will be closed at some point, as will O, P, Q, and Potomac SW from Half Street to South Capitol. "Expect other road closures around the ballpark from 9 pm Wednesday until 2 pm Thursday," it says.
 

This afternoon's Anacostia Waterfront Community Fair appeared to be very well attended, at least during the 90 minutes or so I was there. (Even Marion Barry showed up.) There were three long tables of displays and information from city agencies, commercial developers, and non-profit organizations, and Near Southeast was well-represented--JPI, Velocity, Monument Half Street, Williams C. Smith (250 M Street), Forest City (Capper/Carrollsburg, The Yards), the Anacostia Community Boathouse Association, and the ballpark all had people on hand. (There was also plenty of swag--hope you didn't miss out on your DC WASA lanyard!)
Two news items I came across:
* First, confirmation that 250 M Street will start construction in either late spring or early summer, although they don't yet have any office or retail tenants to announce.
* Second, the Draft Environmental Impact Statement for South Capitol Street (including a new Frederick Douglass Bridge) is going to be released on February 8, with a public comment period to follow. There are two build alternatives that would reconstruct South Capitol Street and the Suitland Parkway (and its interchange with I-295), but neither has been identified yet as a "preferred" alternative. (No design from the four options for a new Douglass Bridge has been chosen yet, either.) There will be public meetings in late February about the Draft EIS, and the web site will be updated soon with information on the draft. I'll write more about this when the Draft EIS is officially released, but it's this study that will decide whether a big traffic oval is built at South Capitol and Potomac, and whether the South Capitol/M interchange could be reconfigured into an "at-grade" intersection (i.e., no more tunnel).
I should have asked about the status of the reconfiguration of the 11th Street Bridges now that that EIS is complete, but I could never get close enough to the table to talk to anyone. (See update below.)
Other developments such as the Southwest Waterfront and Hill East had displays as well, but since my brain can't process anything outside of my borders, you'll have to hunt down information on those projects elsewhere.
UPDATE: I'm finally looking through the pile of flyers I picked up, and here's a few timelines in the official brochure for the event (they're called "targeted schedules", so best not to pen them in just yet):
* Douglass Bridge Replacement: Begin construction Spring 2010, complete in Winter 2015.
* 11th Street Bridges Replacement: Begin construction Spring 2009, no completion date listed.
Also, the 500,000-sq-ft office building by Forest City at the site of the old Capper Seniors building at 600 M has a Spring 2009 start date in one of Forest City's flyers. The other Yards start/completion dates in the brochures are on target with what I've written about previously (see my Yards Phase I page for details).
 

On Monday night the Zoning Commission considered two Near Southeast cases on its consent calendar. I wasn't there (having chosen to go to the ANC meeting scheduled for the same time), and the ZC's web feed experienced technical difficulties, so I'm posting some bare bones info that folks at the meeting have been nice enough to pass along.
Monument Realty asked for 22 "minor modifications" to its previously approved design for the under-construction eastern side of Half Street. According to the Office of Planning report, the changes mostly centered on adjustments to the exterior architecture and the layout of the residential component. The most noteworthy change request is probably switching from a multicolored LED screen at the Metro entrance at Half and M (which WMATA turned down, apparently) to a backlit laminated glass panel. Also, nestled deep in the OP report is a request to modify the design for the hotel windows because the "hotel operator has pulled out" -- early on, the word had been that W Aloft would be running the midblock hotel on Half Street, but apparently this is no longer the case; I've heard nothing on any new operator. You can read the report to see the other requested changes. Though this was on the Zoning Commission's consent calendar, and the commission acknowledged that the changes are small, they still wanted to see some renderings showing the befores-and-afters of the proposed changes, and have scheduled a special public meeting for Jan. 28 at 6 pm to consider the request.
Now that the eastern side of Second Street (running along Canal Park) is considered "re-opened" (it's a long story), the developers of 250 M Street are requesting to base the office building's height on the width of Second Street, which is wider than M Street. This would allow 250 M to go up to 130 feet, which apparently is the same as the height of 1100 New Jersey on the west side of the park, although apparently the building's planned square footage would actually decrease slightly which would increase the total square footage to 233,405. Though this was on the consent calendar, the commission asked the Office of Planning to submit a report on this, and there will be a public hearing.
UPDATED to fix an error about 250 M's proposed new square footage.
 

Agendas are out for two public meetings on Monday night (Jan. 14) that have Near Southeast items of interest:
*ANC 6D's agenda includes presentations and requests for support on the following: a new request for an alley closing on the southern end of the block bounded by Half, M, N, and South Capitol (B17-0552, "Closing of a Public Alley in Square 700"); the Capitol Gateway Overlay Review for 1111 New Jersey Ave., which will be at the Zoning Commission on Jan. 31; and new design/modified second-stage PUD for RiverFront on the Anacostia (Florida Rock), which is expected to go to the Zoning Commission in the next few months. The meeting is at St. Augustine's Church, 6th and M Streets, SW, at 7 pm.
* The Zoning Commission will hear requests for "minor modifications" to William C. Smith's 250 M Street project and Monument's Half Street project; alas, I haven't been able to find out what these modifications are. That meeting is at 6:30 pm at 441 Fourth St., NW, and is also available via live webcast.
I should also mention here that last night the Zoning Commission voted preliminary approval of a series of text and map amendments at the Yards, most of which are far too dull for even me to get into; read the hearing announcement if you want more details.
 

Two bills of Near Southeast interest passed their first readings at today's city council meeting, on the consent agenda, no less. (Consent agenda = no discussion or bickering! Yay!) First was Bill 17-0448, which authorizes the closing of the public alley on Square 696 (bounded by Half, First, I, and K), and which had been interesting mainly for the affordable housing trust fund contribution discrepancy that came up during the bill's hearing a few weeks ago, when the developers noted that they expected their contribution to be in the neighborhood of $900,000 and the Office of Planning determined the required sum be closer to $8 million. Apparently the final bill calls for a $1.1 million contribution, which council chairman Vincent Gray said is the largest trust fund contribution ever as the result of an alley closing. The developers also have agreed to create a 20-foot-wide pedestrian right-of-way through the middle of the block to allow for easy access from I Street to the planned public plaza on K Street, though apparently DDOT requested that this right-of-way be upgradable for "motorized access" in the future if necessary. This alley closing will allow DRI Development to move forward with their plans for 800,000 square feet of office space in three buildings with 37,000 square feet of ground-floor retail. There've been noises that the first construction on the site could begin in the summer of 2008, but nothing official has been announced. (The last tenants on the block, in the cab garage at First and K, are expected to move out in February when their lease expires.)
Also passed today was Bill 17-0292, the Capper PILOT funding bill that I just wrote about in detail a couple days ago. This authorizes a bond issuance of up to $55 million that will yield close to $37 million to pay for infrastructure improvements at Capper/Carrollsburg. The bonds will then be repaid by landowners making payments in lieu of property taxes. I should mention that these PILOT funds won't only be repaid by residents of Capitol Quarter--there are two planned office developments totaling 750,000 square feet that are within the Capper PILOT area (600 M Street at the old Capper Seniors site and 250 M Street) that will generate PILOT payments.
Each bill will come before the council again in January for their final votes.
 

Because I'm not always so successful in getting people to tell me the current status of various projects, I spend a lot of time pouring through documents hoping to get hints here or there, and within the past few days I've uncovered a few new ones. I sent out some e-mails asking for additional information, but those have gone unanswered (waaaaah!), so I'll just post what I've seen, and wait for the various bureaucratic processes to move along to get more information.
The developers of the planned office building at 1111 New Jersey Avenue are having a Capitol Gateway Overlay Review in front of the Zoning Commission on Jan. 31. This review is now required because Donohoe is buying the land on top of the Navy Yard Metro station east entrance, which means that the project's property now "fronts" M Street and must get a review by the Zoning Commission to make sure it follows the design and usage requirements laid out by the CG Overlay. I haven't seen any new renderings yet to know whether the building has grown from its original 146,000-sq-ft design (note: see UPDATE below). No mentions yet of when construction might start. Presumably this design will be presented to ANC 6D, at perhaps its January meeting.
And, in the Questions and Responses posted along with the Capper PILOT underwriters RFP, there's the following statements:
* 250 M Street, the 200,000-sq-ft office building by William C. Smith, "will commence construction on or about May 2008";
* 600 M Street, the 500,000-sq-ft office building by Forest City on the old Capper Seniors site, "is expected to commence construction in late 2009 or early 2010 -- Stage II PUD process with the District Zoning Commission has already commenced"; and
* 800 New Jersey/120 Canal, the planned 1.1-million-sq-ft mixed use project by William C. Smith on the land north of I between Second and New Jersey (known as Square 737), "will commence Stage II PUD upon transfer of District land in early 2008."
1111 NJ UPDATE: Amazingly, just a few hours later, another document popped up with additional information on 1111 New Jersey: it's for the Dec. 13 WMATA board meeting, a request to execute the sale announced back in June of the 5,612-sq-ft WMATA land at New Jersey and M to "NJA Associates" (aka Donohoe). And it describes the "new" 1111 NJ thusly (emphases mine):
"The Developer proposes to combine the WMATA property with an adjacent 16,406 sf developer-owned site and develop an office building with ground floor retail. Its current proposal to the District of Columbia Zoning Commission is for an approximately 211,000 sf building, a portion of which cantilevers over the WMATA property. At ground level, the proposal includes a wide plaza surrounding the Metro entrance, consistent with the Anacostia Waterfront Initiative Framework Plan. The Developer will make modifications to Metro facilities at its own cost and subject to WMATA approval. At present the modifications are expected to be limited to adjustments to the vent shaft and new paving in the plaza area. The existing entrance canopy will remain. The entrance will be protected during construction. The Developer has stated that it does not currently anticipate any need to close the entrance during construction."
WMATA is selling the land for $2.3 million plus an unnamed additional payment if the approved project is larger 206,000 square feet.
 

Once again venturing reluctantly into the world of live human beings, I went to last night's Zoning Commission meeting. Here's a wrapup:
* After waiting a month to get input from the Office of Planning, the ZC gave some guidance on Florida Rock's revised plans for its 5.8-acre site on the Anacostia. The phrase uttered most often was "on the right track" -- each commissioner mentioned something in the new designs that they weren't completely crazy about (the glass "campanile" viewing tower on the east building seemed not to have wowed them), but they were mainly complimentary, making clear that the new design was an improvement over the last go-round and is closer to what the ZC wants to see on the site. (Read my entry from February for more background on the ZC's objections to the last design.)
This was not any sort of decision-making stage--the Florida Rock developers were wanting to make sure that they didn't expend vast amounts of energy pursuing a design that would end up again being nixed by the commission, and now with the sense that their latest idea has the ZC's support, they can work on their designs in more detail and apply for a modification to their second-stage PUD, which would then have a public hearing. I don't have any idea at this point what the time frame on this would be.
* Camden Development's planned 276-unit residential building at 1325 South Capitol Street was looking for a vote to approve its PUD, after a hearing a few weeks ago when Commissioner Turnbull complained that the western side of the building (facing Southwest) wasn't designed well enough given how "on display" it will be, and Commissioner Hood wanted more information on how the affordable units would be allocated throughout the building. So tonight, after some revised submittals, it came before the commission for a vote to approve its design--and Commissioner Turnbull complained that the western side of the building wasn't designed well enough given how "on display" it will be, and Commissioner Hood wanted more information on how the affordable units would be allocated throughout the building. In other words, neither felt that their concerns from last time had been addressed, and so have requested further filings before a scheduled vote on July 30.
* In an easier item, the commission voted 5-0 to give final approval to the design of the planned office building at 250 M Street. But, as reported a few weeks ago, developer William C. Smith has indicated that they are waiting for the building to be about one-third leased before starting construction.
* Finally (yay), the commissioned approved for setdown (meaning there can be a hearing) on Forest City's request for various amendments to the Southeast Federal Center Overlay as part of their plans to develop The Yards. These requests address some pretty darn technical issues in the overlay and are pretty baffling, even for obsessives like me, so I will just point you to the Office of Planning report if you really want to know what's happening. Please note that this is not the case requesting surface parking lots at The Yards--it's having its hearing on July 26.
 

With the calendar inching toward DC's annual August shutdown, there's a boatload of meetings and hearings on the agenda this week as everyone tries to get their work done before heading for the beach. Here's a not-very-detailed rundown, so follow the links if you want more detailed information:
* Monday starts bright and early with the "public hearing and preliminary finding" by the office of the Deputy Mayor for Planning and Economic Development on the Capitol Riverfront Business Improvement District application, in Room 301 of the Wilson Building, 10 am.
* The Zoning Commission's monthly public meeting on Monday night includes a final vote on the plans for the 250 M Street office building and a first vote on the 1325 South Capitol Street residential project. In addition, there's a new case looking for various amendments to the Southeast Federal Center overlay; here's the Office of Planning report spelling them out. The commission is also scheduled to address Florida Rock's request for guidance on its revised design, which has the support of the Office of Planning. The meeting is at 6:30 pm at One Judiciary Square (Suite 220 South), but also can be watched via live webcast.
* At about the same time, ANC 6D is having its monthly meeting, and will be having a presentation and vote on Forest City's July 26 zoning hearing to allow temporary surface parking lots at The Yards. This meeting is at 7 pm at St. Augustine's Episcopal Church, 6th and M Streets, SW. (Having to make a choice, I'm opting for the zoning meeting, so it might take a little while before I find out what happened at the ANC.)
* Tuesday's city council meeting at 10 am will include a final vote on the bill to create the Capitol Riverfront Business Improvement District.
* On Tuesday night WMATA is having a public hearing on the proposed move of the Southeastern Bus Garage from its current location at Half and M to a new facility at DC Village in Southwest. (It's probably geared more toward residents near the new location.) There's an open house at 5:30 pm, and the hearing itself starts at 6:30, at 2700 Martin Luther King Dr. SE.
* The Nationals ballpark is having its "Topping Out" party on Wednesday at noon.
* WMATA's Planning, Development and Real Estate Committee is meeting in executive session on Thursday morning to address something having to do with the Southeastern Bus Garage, but they're not saying what.
* Thursday also sees the National Capital Planning Commission meeting that Canal Park fans mobilized for, with the NCPC's agenda including the zoning commission case approving temporary surface parking lots on various blocks in Near Southeast that include Canal Park in their boundaries. There's also a presentation on the the first phase of The Yards. The meeting is at 12:30 pm at 401 9th St., NW, Suite 500.
* Wrapping up the week (pant pant pant) is a city council Subcommittee on Economic Development hearing on the transition plans for folding in the Anacostia Waterfront Corporation and the National Capital Revitalization Corporation into the office of the Deputy Mayor for Economic Development; it's in the council chamber at the Wilson Building at 10 am, and may also be broadcast on DC cable channel 13 and via streaming video.
And then I will spend the weekend alseep.
 

This week's Ballpark and Beyond column in the Post is on Tuesday's groundbreaking at Capper / Carrollsburg, and Monument's purchase of the Sunoco site. If you're visiting here for more information, you can check out my Capper / Carrollsburg overview page for more details and links on the project's redevelopment as well as photos from the groundbreaking, and my Capitol Quarter page has lots and lots (and lots!) of photos showing the area before, during, and after demolition. You can see what Monument Realty is up to at Half and M on my Monument Half Street page.
More posts: Homewood Suites, Capper, Capitol Quarter, Monument Valley/Half St., staddis
 
75 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8