Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Homewood Suites
See JDLand's Homewood Suites Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


75 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

Agendas are out for two public meetings on Monday night (Jan. 14) that have Near Southeast items of interest:
*ANC 6D's agenda includes presentations and requests for support on the following: a new request for an alley closing on the southern end of the block bounded by Half, M, N, and South Capitol (B17-0552, "Closing of a Public Alley in Square 700"); the Capitol Gateway Overlay Review for 1111 New Jersey Ave., which will be at the Zoning Commission on Jan. 31; and new design/modified second-stage PUD for RiverFront on the Anacostia (Florida Rock), which is expected to go to the Zoning Commission in the next few months. The meeting is at St. Augustine's Church, 6th and M Streets, SW, at 7 pm.
* The Zoning Commission will hear requests for "minor modifications" to William C. Smith's 250 M Street project and Monument's Half Street project; alas, I haven't been able to find out what these modifications are. That meeting is at 6:30 pm at 441 Fourth St., NW, and is also available via live webcast.
I should also mention here that last night the Zoning Commission voted preliminary approval of a series of text and map amendments at the Yards, most of which are far too dull for even me to get into; read the hearing announcement if you want more details.
 

Two bills of Near Southeast interest passed their first readings at today's city council meeting, on the consent agenda, no less. (Consent agenda = no discussion or bickering! Yay!) First was Bill 17-0448, which authorizes the closing of the public alley on Square 696 (bounded by Half, First, I, and K), and which had been interesting mainly for the affordable housing trust fund contribution discrepancy that came up during the bill's hearing a few weeks ago, when the developers noted that they expected their contribution to be in the neighborhood of $900,000 and the Office of Planning determined the required sum be closer to $8 million. Apparently the final bill calls for a $1.1 million contribution, which council chairman Vincent Gray said is the largest trust fund contribution ever as the result of an alley closing. The developers also have agreed to create a 20-foot-wide pedestrian right-of-way through the middle of the block to allow for easy access from I Street to the planned public plaza on K Street, though apparently DDOT requested that this right-of-way be upgradable for "motorized access" in the future if necessary. This alley closing will allow DRI Development to move forward with their plans for 800,000 square feet of office space in three buildings with 37,000 square feet of ground-floor retail. There've been noises that the first construction on the site could begin in the summer of 2008, but nothing official has been announced. (The last tenants on the block, in the cab garage at First and K, are expected to move out in February when their lease expires.)
Also passed today was Bill 17-0292, the Capper PILOT funding bill that I just wrote about in detail a couple days ago. This authorizes a bond issuance of up to $55 million that will yield close to $37 million to pay for infrastructure improvements at Capper/Carrollsburg. The bonds will then be repaid by landowners making payments in lieu of property taxes. I should mention that these PILOT funds won't only be repaid by residents of Capitol Quarter--there are two planned office developments totaling 750,000 square feet that are within the Capper PILOT area (600 M Street at the old Capper Seniors site and 250 M Street) that will generate PILOT payments.
Each bill will come before the council again in January for their final votes.
 

Because I'm not always so successful in getting people to tell me the current status of various projects, I spend a lot of time pouring through documents hoping to get hints here or there, and within the past few days I've uncovered a few new ones. I sent out some e-mails asking for additional information, but those have gone unanswered (waaaaah!), so I'll just post what I've seen, and wait for the various bureaucratic processes to move along to get more information.
The developers of the planned office building at 1111 New Jersey Avenue are having a Capitol Gateway Overlay Review in front of the Zoning Commission on Jan. 31. This review is now required because Donohoe is buying the land on top of the Navy Yard Metro station east entrance, which means that the project's property now "fronts" M Street and must get a review by the Zoning Commission to make sure it follows the design and usage requirements laid out by the CG Overlay. I haven't seen any new renderings yet to know whether the building has grown from its original 146,000-sq-ft design (note: see UPDATE below). No mentions yet of when construction might start. Presumably this design will be presented to ANC 6D, at perhaps its January meeting.
And, in the Questions and Responses posted along with the Capper PILOT underwriters RFP, there's the following statements:
* 250 M Street, the 200,000-sq-ft office building by William C. Smith, "will commence construction on or about May 2008";
* 600 M Street, the 500,000-sq-ft office building by Forest City on the old Capper Seniors site, "is expected to commence construction in late 2009 or early 2010 -- Stage II PUD process with the District Zoning Commission has already commenced"; and
* 800 New Jersey/120 Canal, the planned 1.1-million-sq-ft mixed use project by William C. Smith on the land north of I between Second and New Jersey (known as Square 737), "will commence Stage II PUD upon transfer of District land in early 2008."
1111 NJ UPDATE: Amazingly, just a few hours later, another document popped up with additional information on 1111 New Jersey: it's for the Dec. 13 WMATA board meeting, a request to execute the sale announced back in June of the 5,612-sq-ft WMATA land at New Jersey and M to "NJA Associates" (aka Donohoe). And it describes the "new" 1111 NJ thusly (emphases mine):
"The Developer proposes to combine the WMATA property with an adjacent 16,406 sf developer-owned site and develop an office building with ground floor retail. Its current proposal to the District of Columbia Zoning Commission is for an approximately 211,000 sf building, a portion of which cantilevers over the WMATA property. At ground level, the proposal includes a wide plaza surrounding the Metro entrance, consistent with the Anacostia Waterfront Initiative Framework Plan. The Developer will make modifications to Metro facilities at its own cost and subject to WMATA approval. At present the modifications are expected to be limited to adjustments to the vent shaft and new paving in the plaza area. The existing entrance canopy will remain. The entrance will be protected during construction. The Developer has stated that it does not currently anticipate any need to close the entrance during construction."
WMATA is selling the land for $2.3 million plus an unnamed additional payment if the approved project is larger 206,000 square feet.
 

Once again venturing reluctantly into the world of live human beings, I went to last night's Zoning Commission meeting. Here's a wrapup:
* After waiting a month to get input from the Office of Planning, the ZC gave some guidance on Florida Rock's revised plans for its 5.8-acre site on the Anacostia. The phrase uttered most often was "on the right track" -- each commissioner mentioned something in the new designs that they weren't completely crazy about (the glass "campanile" viewing tower on the east building seemed not to have wowed them), but they were mainly complimentary, making clear that the new design was an improvement over the last go-round and is closer to what the ZC wants to see on the site. (Read my entry from February for more background on the ZC's objections to the last design.)
This was not any sort of decision-making stage--the Florida Rock developers were wanting to make sure that they didn't expend vast amounts of energy pursuing a design that would end up again being nixed by the commission, and now with the sense that their latest idea has the ZC's support, they can work on their designs in more detail and apply for a modification to their second-stage PUD, which would then have a public hearing. I don't have any idea at this point what the time frame on this would be.
* Camden Development's planned 276-unit residential building at 1325 South Capitol Street was looking for a vote to approve its PUD, after a hearing a few weeks ago when Commissioner Turnbull complained that the western side of the building (facing Southwest) wasn't designed well enough given how "on display" it will be, and Commissioner Hood wanted more information on how the affordable units would be allocated throughout the building. So tonight, after some revised submittals, it came before the commission for a vote to approve its design--and Commissioner Turnbull complained that the western side of the building wasn't designed well enough given how "on display" it will be, and Commissioner Hood wanted more information on how the affordable units would be allocated throughout the building. In other words, neither felt that their concerns from last time had been addressed, and so have requested further filings before a scheduled vote on July 30.
* In an easier item, the commission voted 5-0 to give final approval to the design of the planned office building at 250 M Street. But, as reported a few weeks ago, developer William C. Smith has indicated that they are waiting for the building to be about one-third leased before starting construction.
* Finally (yay), the commissioned approved for setdown (meaning there can be a hearing) on Forest City's request for various amendments to the Southeast Federal Center Overlay as part of their plans to develop The Yards. These requests address some pretty darn technical issues in the overlay and are pretty baffling, even for obsessives like me, so I will just point you to the Office of Planning report if you really want to know what's happening. Please note that this is not the case requesting surface parking lots at The Yards--it's having its hearing on July 26.
 

With the calendar inching toward DC's annual August shutdown, there's a boatload of meetings and hearings on the agenda this week as everyone tries to get their work done before heading for the beach. Here's a not-very-detailed rundown, so follow the links if you want more detailed information:
* Monday starts bright and early with the "public hearing and preliminary finding" by the office of the Deputy Mayor for Planning and Economic Development on the Capitol Riverfront Business Improvement District application, in Room 301 of the Wilson Building, 10 am.
* The Zoning Commission's monthly public meeting on Monday night includes a final vote on the plans for the 250 M Street office building and a first vote on the 1325 South Capitol Street residential project. In addition, there's a new case looking for various amendments to the Southeast Federal Center overlay; here's the Office of Planning report spelling them out. The commission is also scheduled to address Florida Rock's request for guidance on its revised design, which has the support of the Office of Planning. The meeting is at 6:30 pm at One Judiciary Square (Suite 220 South), but also can be watched via live webcast.
* At about the same time, ANC 6D is having its monthly meeting, and will be having a presentation and vote on Forest City's July 26 zoning hearing to allow temporary surface parking lots at The Yards. This meeting is at 7 pm at St. Augustine's Episcopal Church, 6th and M Streets, SW. (Having to make a choice, I'm opting for the zoning meeting, so it might take a little while before I find out what happened at the ANC.)
* Tuesday's city council meeting at 10 am will include a final vote on the bill to create the Capitol Riverfront Business Improvement District.
* On Tuesday night WMATA is having a public hearing on the proposed move of the Southeastern Bus Garage from its current location at Half and M to a new facility at DC Village in Southwest. (It's probably geared more toward residents near the new location.) There's an open house at 5:30 pm, and the hearing itself starts at 6:30, at 2700 Martin Luther King Dr. SE.
* The Nationals ballpark is having its "Topping Out" party on Wednesday at noon.
* WMATA's Planning, Development and Real Estate Committee is meeting in executive session on Thursday morning to address something having to do with the Southeastern Bus Garage, but they're not saying what.
* Thursday also sees the National Capital Planning Commission meeting that Canal Park fans mobilized for, with the NCPC's agenda including the zoning commission case approving temporary surface parking lots on various blocks in Near Southeast that include Canal Park in their boundaries. There's also a presentation on the the first phase of The Yards. The meeting is at 12:30 pm at 401 9th St., NW, Suite 500.
* Wrapping up the week (pant pant pant) is a city council Subcommittee on Economic Development hearing on the transition plans for folding in the Anacostia Waterfront Corporation and the National Capital Revitalization Corporation into the office of the Deputy Mayor for Economic Development; it's in the council chamber at the Wilson Building at 10 am, and may also be broadcast on DC cable channel 13 and via streaming video.
And then I will spend the weekend alseep.
 

This week's Ballpark and Beyond column in the Post is on Tuesday's groundbreaking at Capper / Carrollsburg, and Monument's purchase of the Sunoco site. If you're visiting here for more information, you can check out my Capper / Carrollsburg overview page for more details and links on the project's redevelopment as well as photos from the groundbreaking, and my Capitol Quarter page has lots and lots (and lots!) of photos showing the area before, during, and after demolition. You can see what Monument Realty is up to at Half and M on my Monument Half Street page.
More posts: Homewood Suites, Capper, Capitol Quarter, Monument Valley/Half St., staddis
 

Thanks to the weekly update of the public version of the DC Property Sales database (which runs about five weeks behind), I can confirm what has been rumored for a little while now: on May 21, Monument Realty paid $14.26 million for the old Sunoco site at 50 M Street, on the northeast corner of Half and M. There's been no announcement as yet as to their plans for the 15,500-sq-ft site located between 20 M, 80 M, and a US government warehouse, and right across the street from the Navy Yard Metro west entrance and Monument's Half Street extravaganza. Just think--if Monument is the successful bidder later this year for WMATA's Southeastern Bus Garage, they'll control three of the four corners at Half and M. Monument Valley, indeed!

More posts: Homewood Suites, Metro/WMATA, Monument Valley/Half St., M Street
 

The DC Housing Authority is having a groundbreaking ceremony on Tuesday (June 26) at 11 am for the first phase of the Capper/Carrollsburg mixed-income townhouses (i.e., Capitol Quarter), at 4th and L by the EYA sales office. This isn't a signal for the actual start of "vertical" construction, though--that won't begin until later this year.
And maybe this makes for a good time to have a refresher on what exactly "Capper/Carrollsburg" is:
In 2001, DC received a $34.9 million Hope VI grant to redevelop the 23-acre 700-unit Capper/Carrollsburg public housing project as a mixed-income development, replacing every one of the low-income units and then adding to them another 700-plus market-rate and workforce-rate rental and ownership units. The redevelopment project is being handled as a joint venture by Forest City Washington, Mid-City Urban LLC, and the Housing Authority.
The townhouse portion of the redevelopment, being marketed by EYA as Capitol Quarter, will have approximately 121 market-rate and 91 "workforce"-rate ownership houses; an additional 65 townhouses will contain 111 subsidized rental units and Section 8 ownership units. The market-rate houses are already being made available for reservations in monthly blocks, with the attendant tent cities popping up at the sales center as hopeful homeowners stake their claims. There was a lottery back in 2006 for the first 20 workforce units; I imagine another will be coming before too long.
Three hundred low-income rental units have already been completed (or are about to be) as part of the new Capper Seniors #1 and Capper Building #2 projects. The rest of the public housing rental units will be included in four mixed-income apartment buildings planned along Canal Park, three on the eastern side of the park between 2nd and 3rd and I and M, and a fourth on the site of the DPW Trash Transfer lot at New Jersey and K. None of these are anticipated to start construction before 2010, so in the meantime, temporary surface parking lots will soon appear on those blocks to help ease the expected Nationals stadium parking crunch.
Additionally, 700,000 sq ft of office space will eventually be built within the Capper redevelopment area; 250 M Street is a 190,000-sq-ft joint venture between William C. Smith and the DC Housing Authority, and although it now has all of its zoning approvals, we just learned a few days ago that Smith is going to wait until the building is 30 percent leased before beginning construction. There will eventually be another 500,000 sq ft of office space developed at 7th and M on the site of the old Capper Seniors building (itself scheduled to be demolished late this year), but with no current timetable for that project a temporary surface parking lot is coming to that site as well. There will also be another 30-45 townhomes built along L Street behind these new office buildings, but those are a long ways off.
Topping it all off, a new 28,000-sq-ft community center is planned at 5th and K, replacing the one demolished earlier this year. It could start construction in 2008, but those plans might change if, say, a developer or the Housing Authority manages to snag from DCPS the Van Ness Elementary School site at 5th and M, which was closed in 2006 and is now administrative space. A new elementary school could be then constructed to serve families as they move into the rebuilt Capper neighborhood, and the community center could be part of the school rather than being a standalone project. But with the changes in the structure of the public schools' governance, who knows when any decision like this could happen, if at all. Just some Sunday morning speculation for you.
(This info has all been available on my Capper overview page, but it's good to get it out front once in a while.)
 

Today's print edition of the Washington Business Journal has an article summing up what's going on right now with various commercial projects around Near Southeast. (The online article is for subscribers only for the first 30 days; sorry.) Here are the new items:
* William C. Smith is planning to hold off breaking ground on its 200,000-sq-ft building at 250 M Street until it pre-leases at least 30% of the building.
* Opus East has leased 80,000 sq ft at 100 M Street (33% of the building) to government contractor Parsons Corp.
* Lerner's 20 M Street does not as yet have any office tenants.
* It also mentions that Opus East is planning to build the 440,000-sq-ft office building at 1015 Half Street (the old Nation site) on spec; but it should be noted that Opus hasn't yet officially announced its purchase of this property or its plans.
(The article also summarizes what's going on at Florida Rock, using some source materials that are hard to find anywhere other than here at JDLand. Note to reporters and other professionals using my site: yup, lots of stuff is posted here, and it's all free, but be a grownup and say where you found it.)
In addition, there's an ad in the print edition giving us our first peek at the Shalom Baranes design for 1100 South Capitol Street, Ruben Companies's planned 350,000 sq ft office building on the southeast corner of South Capitol and L. There's currently no timeline for development of this project.
The print edition also has a piece written by GSA about the US Department of Transportation completing its move to its new headquarters at New Jersey and M. It describes the HQ's interiors and exteriors, and mentions that this project is the largest lease ever executed in DC.

 

The speed of events is leaving me breathless these days. Today JPI held a groundbreaking ceremony at 909 New Jersey Avenue, where digging is about to get underway for the 237-unit residential building to be built on that block (former home of the Nexus Gold Club). You can see the obligatory photos of Dignitaries-With-Shovels here. (Yes, I did get my invite after all. Thank you!)
But there was big news tucked into the press release touting what JPI is now calling its "Capitol Yards" neighborhood along I Street (with 70 and 100 I Street across the way from 909 New Jersey about to sprout out of their deep hole): the announcement of plans for 23 I Street, a fourth JPI residential project on I Street, slated to have 421 residential units and as much as 35,000 square feet of retail space. Its location would be on the south side of I Street between Half and South Capitol, from Half over to (and including) the current Wendy's lot. (The moribund Exxon station does not currently appear to be part of the plans.) Construction wouldn't start before 2008. I haven't added it to my main map yet, but I've put up a few boring shots of what the block looks like as of now.
With that, the number of not-spoken-for lots in Near Southeast has just about dwindled to zero. Pretty much there's the block on New Jersey across from Capitol Hill Tower (though Akridge now owns a portion of it), the Exxon at South Capitol and I if JPI doesn't grab it, and the Metro Chiller Plant on the southwest corner of Half and L, which might not be made available anytime soon. (And I'm assuming that the rumors of Monument Realty picking up the Sunoco site at 50 M are true.) Everything else west of 7th Street is now spoken for. So if you were hoping to make your millions in Near Southeast and you haven't already staked your claim, your time's just about up, unless you can wrest some parcels out of some other developer's hands.
UPDATE, 6/11: Five days later, here's the Post's blurb on Capitol Yards.
 
75 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8