Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Homewood Suites
See JDLand's Homewood Suites Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


75 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

This week's Ballpark and Beyond column in the Post is on Tuesday's groundbreaking at Capper / Carrollsburg, and Monument's purchase of the Sunoco site. If you're visiting here for more information, you can check out my Capper / Carrollsburg overview page for more details and links on the project's redevelopment as well as photos from the groundbreaking, and my Capitol Quarter page has lots and lots (and lots!) of photos showing the area before, during, and after demolition. You can see what Monument Realty is up to at Half and M on my Monument Half Street page.
More posts: Homewood Suites, Capper, Capitol Quarter, Monument Valley/Half St., staddis
 

Thanks to the weekly update of the public version of the DC Property Sales database (which runs about five weeks behind), I can confirm what has been rumored for a little while now: on May 21, Monument Realty paid $14.26 million for the old Sunoco site at 50 M Street, on the northeast corner of Half and M. There's been no announcement as yet as to their plans for the 15,500-sq-ft site located between 20 M, 80 M, and a US government warehouse, and right across the street from the Navy Yard Metro west entrance and Monument's Half Street extravaganza. Just think--if Monument is the successful bidder later this year for WMATA's Southeastern Bus Garage, they'll control three of the four corners at Half and M. Monument Valley, indeed!

More posts: Homewood Suites, Metro/WMATA, Monument Valley/Half St., M Street
 

The DC Housing Authority is having a groundbreaking ceremony on Tuesday (June 26) at 11 am for the first phase of the Capper/Carrollsburg mixed-income townhouses (i.e., Capitol Quarter), at 4th and L by the EYA sales office. This isn't a signal for the actual start of "vertical" construction, though--that won't begin until later this year.
And maybe this makes for a good time to have a refresher on what exactly "Capper/Carrollsburg" is:
In 2001, DC received a $34.9 million Hope VI grant to redevelop the 23-acre 700-unit Capper/Carrollsburg public housing project as a mixed-income development, replacing every one of the low-income units and then adding to them another 700-plus market-rate and workforce-rate rental and ownership units. The redevelopment project is being handled as a joint venture by Forest City Washington, Mid-City Urban LLC, and the Housing Authority.
The townhouse portion of the redevelopment, being marketed by EYA as Capitol Quarter, will have approximately 121 market-rate and 91 "workforce"-rate ownership houses; an additional 65 townhouses will contain 111 subsidized rental units and Section 8 ownership units. The market-rate houses are already being made available for reservations in monthly blocks, with the attendant tent cities popping up at the sales center as hopeful homeowners stake their claims. There was a lottery back in 2006 for the first 20 workforce units; I imagine another will be coming before too long.
Three hundred low-income rental units have already been completed (or are about to be) as part of the new Capper Seniors #1 and Capper Building #2 projects. The rest of the public housing rental units will be included in four mixed-income apartment buildings planned along Canal Park, three on the eastern side of the park between 2nd and 3rd and I and M, and a fourth on the site of the DPW Trash Transfer lot at New Jersey and K. None of these are anticipated to start construction before 2010, so in the meantime, temporary surface parking lots will soon appear on those blocks to help ease the expected Nationals stadium parking crunch.
Additionally, 700,000 sq ft of office space will eventually be built within the Capper redevelopment area; 250 M Street is a 190,000-sq-ft joint venture between William C. Smith and the DC Housing Authority, and although it now has all of its zoning approvals, we just learned a few days ago that Smith is going to wait until the building is 30 percent leased before beginning construction. There will eventually be another 500,000 sq ft of office space developed at 7th and M on the site of the old Capper Seniors building (itself scheduled to be demolished late this year), but with no current timetable for that project a temporary surface parking lot is coming to that site as well. There will also be another 30-45 townhomes built along L Street behind these new office buildings, but those are a long ways off.
Topping it all off, a new 28,000-sq-ft community center is planned at 5th and K, replacing the one demolished earlier this year. It could start construction in 2008, but those plans might change if, say, a developer or the Housing Authority manages to snag from DCPS the Van Ness Elementary School site at 5th and M, which was closed in 2006 and is now administrative space. A new elementary school could be then constructed to serve families as they move into the rebuilt Capper neighborhood, and the community center could be part of the school rather than being a standalone project. But with the changes in the structure of the public schools' governance, who knows when any decision like this could happen, if at all. Just some Sunday morning speculation for you.
(This info has all been available on my Capper overview page, but it's good to get it out front once in a while.)
 

Today's print edition of the Washington Business Journal has an article summing up what's going on right now with various commercial projects around Near Southeast. (The online article is for subscribers only for the first 30 days; sorry.) Here are the new items:
* William C. Smith is planning to hold off breaking ground on its 200,000-sq-ft building at 250 M Street until it pre-leases at least 30% of the building.
* Opus East has leased 80,000 sq ft at 100 M Street (33% of the building) to government contractor Parsons Corp.
* Lerner's 20 M Street does not as yet have any office tenants.
* It also mentions that Opus East is planning to build the 440,000-sq-ft office building at 1015 Half Street (the old Nation site) on spec; but it should be noted that Opus hasn't yet officially announced its purchase of this property or its plans.
(The article also summarizes what's going on at Florida Rock, using some source materials that are hard to find anywhere other than here at JDLand. Note to reporters and other professionals using my site: yup, lots of stuff is posted here, and it's all free, but be a grownup and say where you found it.)
In addition, there's an ad in the print edition giving us our first peek at the Shalom Baranes design for 1100 South Capitol Street, Ruben Companies's planned 350,000 sq ft office building on the southeast corner of South Capitol and L. There's currently no timeline for development of this project.
The print edition also has a piece written by GSA about the US Department of Transportation completing its move to its new headquarters at New Jersey and M. It describes the HQ's interiors and exteriors, and mentions that this project is the largest lease ever executed in DC.

 

The speed of events is leaving me breathless these days. Today JPI held a groundbreaking ceremony at 909 New Jersey Avenue, where digging is about to get underway for the 237-unit residential building to be built on that block (former home of the Nexus Gold Club). You can see the obligatory photos of Dignitaries-With-Shovels here. (Yes, I did get my invite after all. Thank you!)
But there was big news tucked into the press release touting what JPI is now calling its "Capitol Yards" neighborhood along I Street (with 70 and 100 I Street across the way from 909 New Jersey about to sprout out of their deep hole): the announcement of plans for 23 I Street, a fourth JPI residential project on I Street, slated to have 421 residential units and as much as 35,000 square feet of retail space. Its location would be on the south side of I Street between Half and South Capitol, from Half over to (and including) the current Wendy's lot. (The moribund Exxon station does not currently appear to be part of the plans.) Construction wouldn't start before 2008. I haven't added it to my main map yet, but I've put up a few boring shots of what the block looks like as of now.
With that, the number of not-spoken-for lots in Near Southeast has just about dwindled to zero. Pretty much there's the block on New Jersey across from Capitol Hill Tower (though Akridge now owns a portion of it), the Exxon at South Capitol and I if JPI doesn't grab it, and the Metro Chiller Plant on the southwest corner of Half and L, which might not be made available anytime soon. (And I'm assuming that the rumors of Monument Realty picking up the Sunoco site at 50 M are true.) Everything else west of 7th Street is now spoken for. So if you were hoping to make your millions in Near Southeast and you haven't already staked your claim, your time's just about up, unless you can wrest some parcels out of some other developer's hands.
UPDATE, 6/11: Five days later, here's the Post's blurb on Capitol Yards.
 

Hot on the heels of the Zoning Commission's approval of William C. Smith's plan for its 190,000-sq-ft office building at 250 M Street, I've found an updated drawing of what the project will look like (designed by Hickok Cole Architects), and I've added it to my 250 M Street page. You can see how the building is designed to echo 1100 New Jersey Avenue, its neighbor across Canal Park.
More posts: 1100nj, 250 M/New DDOT HQ, Homewood Suites, M Street, zoning
 

Let's go around the horn and see what happened at last night's various meetings.
* The Zoning Commission voted to give final approval to the plans for 250 M Street, William C. Smith's planned 190,000-sq-ft office building on M Street just east of what will be Canal Park. The building, which is actually part of the Capper/Carrollsburg Planned Unit Development (and will help fund all the redevelopment at Capper), is expected to start construction at the end of 2007.
* ANC 6D had three Near Southeast items on the agenda--unfortunately, I wasn't able to attend, so I'm giving you the quick and dirty results, and will hopefully have links later for additional details. First, they gave their approval (again) to the 276-unit residential building planned by Camden Development at 1325 South Capitol Street, but this was pretty prefunctory since they approved it a few months back and nothing has really changed except a bureaucratic need to resubmit the plan to the Zoning Commission in a different manner; the ZC hearing is on May 31. Second, they voted not to support Zoning Commission Case 07-08, the request to amend the city's zoning laws to allow temporary (no longer than five years) surface parking lots on certain squares in Near Southeast to help provide parking for the new stadium. There was also a presentation by the DC Housing Authority on what's been happening with Capper/Carrollsburg and the Capper seniors buildings, but of course you've been reading this site religiously and so know it all already.
UPDATE: Apparently the feelings against the parking case ran pretty strong; and I understand that Andy Litsky of the ANC will be testifying in opposition at the Zoning Commission hearing next Monday (May 21).

 

The agenda for May ANC 6D meeting has been sent out (though it's not yet available on their web site). In addition to a presentation and vote on the Waterside Mall plans, there's a bunch of Near Southeast-related items on the agenda, ones that I've been posting about here for a while:
* There will be a presentation and vote on 1325 South Capitol's resubmission to the Zoning Commission as a PUD (that hearing is now scheduled for May 31). This is the planned 276-unit residential building across the street from the Nationals ballpark, which because of some procedural muck had to resubmit its plans in a different format.
* Also scheduled is an update by the DC Housing Authority on the latest goings-on at Capper/Carrollsburg, including status reports on the Senior Buildings (which I imagine will include the change for Capper Building #2 [aka the "Ballpark Apartments"] to allow workforce-level residents in addition to low-income seniors), as well as on the planned demolition this summer of the old Capper Seniors building at 7th and M, and the latest with the townhomes at Capitol Quarter, as more market-rate houses go on the market and with infrastructure construction expected to begin soon (and "vertical construction" probably starting in early fall).
* And there's also a presentation and vote on the (gaaaaak) Supplemental Stadium Surface Parking plan that's having its zoning hearing on May 21. My Stadium Transportation and Parking page (and its News Items tab) can give you the gory details.
This meeting is scheduled for the same time as Monday's Zoning Commission meeting, which includes on its newly-posted agenda the final approval vote on the 250 M Street office building project (which has been delayed a bit over the past few months), so it's a tough call which one I'll be focusing on. (Especially since we know how much I love ANC meetings.)
 

Today I saw for the first time new signs hung on the fence surrounding the firewood lot on the southwest corner of 1st and I Streets, emblazoned with "DRI Development/Office and Retail" (or some such). I have absolutely no information on this--this lot has been owned for quite some time by the Potomac Development Corporation, but I don't see any records as of yet in the online public records to indicate a sale has taken place, so perhaps it's a joint venture. Or not. I don't know. Anyway, I'll try to see what I can find out (whispers in my ear always welcome!), and hopefully some light can be shed on perhaps ANOTHER project getting started in the North of M section of Near Southeast, to go along with JPI's two residential towers, ADC Builders' Square 699N, Faison's Onyx on First condos, and Opus East's 100 M office building (and maybe the Nation site, too?), and perhaps something on the Sunoco lot by Monument Realty.
 

From today's print edition of the Washington Business Journal (subscribers only for now), word arrives of two big Near Southeast real estate transactions: Opus East, developer of 100 M Street, is on track to purchase the 1015 Half Street/Nation site from Potomac Investment Properties (the story says Republic Investment, but I don't think that's correct). And Monument Realty is reportedly adding to its vast Hood holdings by buying the old Sunoco lot at 50 M Street. (I have heard rumors of these two items for weeks/months, but it turns out what I was hearing wasn't 100% accurate--score one for waiting for confirmation) The article says that Opus plans to retain the plans for a 440,000-sq-ft office building with retail on the Nation site, and are rumored to be paying $100 a square foot; Monument has not disclosed what it might do with the Sunoco site or what it's paying. The article also has some vague mention of some other transaction on the "corner of Half and K", but doesn't say which corner (the northeast and northwest ones are the two possibilities), or who's buying it. More on these transactions (such as actual prices) as I get it. (And yes, I'll have photos of the Nation demolition as soon as the sun comes out.)
More posts: 1015 Half, Homewood Suites, mnorth, Monument Valley/Half St., M Street
 
75 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8