Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Homewood Suites
See JDLand's Homewood Suites Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


75 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

The agenda for May ANC 6D meeting has been sent out (though it's not yet available on their web site). In addition to a presentation and vote on the Waterside Mall plans, there's a bunch of Near Southeast-related items on the agenda, ones that I've been posting about here for a while:
* There will be a presentation and vote on 1325 South Capitol's resubmission to the Zoning Commission as a PUD (that hearing is now scheduled for May 31). This is the planned 276-unit residential building across the street from the Nationals ballpark, which because of some procedural muck had to resubmit its plans in a different format.
* Also scheduled is an update by the DC Housing Authority on the latest goings-on at Capper/Carrollsburg, including status reports on the Senior Buildings (which I imagine will include the change for Capper Building #2 [aka the "Ballpark Apartments"] to allow workforce-level residents in addition to low-income seniors), as well as on the planned demolition this summer of the old Capper Seniors building at 7th and M, and the latest with the townhomes at Capitol Quarter, as more market-rate houses go on the market and with infrastructure construction expected to begin soon (and "vertical construction" probably starting in early fall).
* And there's also a presentation and vote on the (gaaaaak) Supplemental Stadium Surface Parking plan that's having its zoning hearing on May 21. My Stadium Transportation and Parking page (and its News Items tab) can give you the gory details.
This meeting is scheduled for the same time as Monday's Zoning Commission meeting, which includes on its newly-posted agenda the final approval vote on the 250 M Street office building project (which has been delayed a bit over the past few months), so it's a tough call which one I'll be focusing on. (Especially since we know how much I love ANC meetings.)
 

Today I saw for the first time new signs hung on the fence surrounding the firewood lot on the southwest corner of 1st and I Streets, emblazoned with "DRI Development/Office and Retail" (or some such). I have absolutely no information on this--this lot has been owned for quite some time by the Potomac Development Corporation, but I don't see any records as of yet in the online public records to indicate a sale has taken place, so perhaps it's a joint venture. Or not. I don't know. Anyway, I'll try to see what I can find out (whispers in my ear always welcome!), and hopefully some light can be shed on perhaps ANOTHER project getting started in the North of M section of Near Southeast, to go along with JPI's two residential towers, ADC Builders' Square 699N, Faison's Onyx on First condos, and Opus East's 100 M office building (and maybe the Nation site, too?), and perhaps something on the Sunoco lot by Monument Realty.
 

From today's print edition of the Washington Business Journal (subscribers only for now), word arrives of two big Near Southeast real estate transactions: Opus East, developer of 100 M Street, is on track to purchase the 1015 Half Street/Nation site from Potomac Investment Properties (the story says Republic Investment, but I don't think that's correct). And Monument Realty is reportedly adding to its vast Hood holdings by buying the old Sunoco lot at 50 M Street. (I have heard rumors of these two items for weeks/months, but it turns out what I was hearing wasn't 100% accurate--score one for waiting for confirmation) The article says that Opus plans to retain the plans for a 440,000-sq-ft office building with retail on the Nation site, and are rumored to be paying $100 a square foot; Monument has not disclosed what it might do with the Sunoco site or what it's paying. The article also has some vague mention of some other transaction on the "corner of Half and K", but doesn't say which corner (the northeast and northwest ones are the two possibilities), or who's buying it. More on these transactions (such as actual prices) as I get it. (And yes, I'll have photos of the Nation demolition as soon as the sun comes out.)
More posts: 1015 Half, Homewood Suites, mnorth, Monument Valley/Half St., M Street
 

Tomorrow (Monday) night is a big Zoning Commission meeting, with votes expected on both the Florida Rock second-stage PUD and the Monument Realty/Half Street project (The 250 M Street vote has been put off again.) This is available on live webcast if you're so inclined. If the projects are approved, there's then a public comment period before a final approval vote a few weeks down the road.
Also, the Anacostia Waterfront Corporation has just announced a Tuesday meeting "to consider resolutions regarding development agreements with the JBG Companies and the Government of the District of Columbia related to the implementation of a PILOT agreement for the new US Department of Transportation Headquarters"--no, I can't really tell you what this means. The meeting can be listened to via teleconference (call 877-529-9893 and enter access code 800). See my Calendar of Events for times and locations.
 

I've now posted PDFs of some of the Monument Realty submissions to the Zoning Commission for the January 11 public hearing on their Half Street/Ballpark District mixed-use project: you can grab yourself a really large, strong cup of coffee and peruse the opening statement (1 MB), the traffic study (3.7 MB, which I linked to a few days ago) or the architectural drawings (13.7 MB). I've also snagged the best of the renderings and added them to my Monument Half Street page. It's expected that the Zoning Commission will vote on this project at its February 12 public meeting, when zoning approval votes are also expected on the 250 M Street and Florida Rock projects. UPDATE: For those who aren't well-versed in the zoning process, I should emphasize that these are the submittal documents--at the public hearings, zoning commissioners ask questions and request clarifications and sometimes modifications, and so what will be voted on isn't necessarily what's seen here. But it's better than nothing!
 

Just a small heads up to highlight some Near Southeast items on this week's calendar: on Monday (Nov. 8), ANC 6D is having its monthly meeting (now at St. Augustine's Episcopal Church at 8th 6th and M SW). The agenda has not yet been posted, but I do hear that the continuing fight over the Monument Realty request for support for its alley closings at Half and M is again on the schedule--which is kind of interesting, given that the alley closings became law back in December; there are mumblings I guess about holding up Monument's zoning application, but who knows what's actually going to happen. Also on Monday night is a Zoning Commission meeting, where the vote on the Florida Rock 2nd Stage PUD is scheduled to be held. (Note that the vote on the 250 M Street PUD/Overlay Review was originally scheduled for this meeting, but has been delayed to Feb. 12.) And then, rounding out the week's zoning festivities, Monument will present its Half Street office/hotel/residential project to the ZC on Thursday evening. Note that both the Monday and Thursday ZC meetings are available via live webcast; I may actually be watching Monday's ZC webcast on my PDA while attending the ANC meeting, which is just wrong on so many levels. And, to make it worse, these two meetings will no doubt require me to time-shift my watching of the Ohio State-Florida game, so no one spoil the result for me (Go Gators! UF '87). The sacrifices I make.... UPDATE: Oops, forgot to mention that tonight's (Jan. 8) Zoning meeting is also scheduled to include votes on proposed text amendments to the Capitol Gateway Overlay (cases 05-10 and 06-25).
 

Correspondent Erik reports that the Sunoco at Half and M, which closed over the summer and saw its underground storage tanks removed soon after, has now been completely demolished. Still no official word on what might be coming to that corner, the rumor of a hotel is all I've heard.... UPDATE: For passers-by wondering about the retro industrial brick building behind the Sunoco--now much more clearly visible from M Street--it's a US Government storage facility.

More posts: Homewood Suites, M Street
 

On Thursday night there was a zoning hearing for William C. Smith's planned 250 M Street office building (approval requests for both a second-stage PUD and a Capitol Gateway Overlay Review). There was a bit of concern from the commissioners about the ground-floor corner of the building that faces Canal Park and they've asked to see more renderings. Despite that, it's anticipated that the proposed requests will go up for approval at the ZC's January 8 meeting (the same day that the Florida Rock project may get a vote on its request for a second-stage PUD approval). In the meantime, the Public Hearing notice was published for a Jan. 11 CG Overlay Review for what we'll now call 55 M Street, Monument Realty's planned 750,000-sq-ft office, residential, hotel, and retail project that lines all of Half Street between M and N. They're looking for some relief in regards to setbacks, lot occupancy, private residential recreation space, and loading. See the hearing notice for information on how to participate in the process.
 

Just a reminder (in case you don't stay glued to my Calendar of Upcoming Events) that tomorrow (Monday Nov. 27) is the continuation of the Zoning Commission's hearing on Florida Rock's 2nd Stage PUD. It's available via live webcast starting at 6:30 pm. There are also three more Near Southeast ZC hearings in the next few weeks and months: on Dec. 7 is the zoning hearing for William C. Smith's 250 M Street office building, which could be interesting because the discussion at the July 10 ZC meeting about this project (starting on page 72 of this transcript) showed the ZC members to be, one could say, somewhat skeptical of the building's initial design. Then, on Jan. 11, Monument Realty will have its Half Street office / hotel / residential development zoning hearing. Finally, on Feb. 22, the Camden Development residential project at 1325 South Capitol Street will have its Capitol Gateway Overlay Review. Interested members of the public should note that there are mechanisms built into the zoning hearing process for public comment, and if you feel strongly one way or another about a project, this is a time when you should make yourself heard. Visit the Zoning Commission web site for additional details. (Of course, the time when I decide to highlight this public participation aspect of the zoning process is when only one of these four pending ZC hearings actually has a Public Hearing Notice--containing the instructions for participating--posted on the ZC calendar.)
 

It appears that the work being done at 1st and M (wrapping back toward L Street) is plumbing/pipe work of some sort under the street and sidewalks, not any-second-now demolition of On Luck and the other buildings (although I imagine that's not far behind, given that construction on 100 M Street is supposed to start "late summer 2006" according to Opus East). And the Sunoco station at 50 M Street is indeed now being dismantled. But still no announcement of any big deal for that lot.

More posts: 100 M, Homewood Suites, M Street, Square 743N
 
75 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8