Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Homewood Suites
See JDLand's Homewood Suites Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


75 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

Correspondent Erik reports that the Sunoco at Half and M, which closed over the summer and saw its underground storage tanks removed soon after, has now been completely demolished. Still no official word on what might be coming to that corner, the rumor of a hotel is all I've heard.... UPDATE: For passers-by wondering about the retro industrial brick building behind the Sunoco--now much more clearly visible from M Street--it's a US Government storage facility.

More posts: Homewood Suites, M Street
 

On Thursday night there was a zoning hearing for William C. Smith's planned 250 M Street office building (approval requests for both a second-stage PUD and a Capitol Gateway Overlay Review). There was a bit of concern from the commissioners about the ground-floor corner of the building that faces Canal Park and they've asked to see more renderings. Despite that, it's anticipated that the proposed requests will go up for approval at the ZC's January 8 meeting (the same day that the Florida Rock project may get a vote on its request for a second-stage PUD approval). In the meantime, the Public Hearing notice was published for a Jan. 11 CG Overlay Review for what we'll now call 55 M Street, Monument Realty's planned 750,000-sq-ft office, residential, hotel, and retail project that lines all of Half Street between M and N. They're looking for some relief in regards to setbacks, lot occupancy, private residential recreation space, and loading. See the hearing notice for information on how to participate in the process.
 

Just a reminder (in case you don't stay glued to my Calendar of Upcoming Events) that tomorrow (Monday Nov. 27) is the continuation of the Zoning Commission's hearing on Florida Rock's 2nd Stage PUD. It's available via live webcast starting at 6:30 pm. There are also three more Near Southeast ZC hearings in the next few weeks and months: on Dec. 7 is the zoning hearing for William C. Smith's 250 M Street office building, which could be interesting because the discussion at the July 10 ZC meeting about this project (starting on page 72 of this transcript) showed the ZC members to be, one could say, somewhat skeptical of the building's initial design. Then, on Jan. 11, Monument Realty will have its Half Street office / hotel / residential development zoning hearing. Finally, on Feb. 22, the Camden Development residential project at 1325 South Capitol Street will have its Capitol Gateway Overlay Review. Interested members of the public should note that there are mechanisms built into the zoning hearing process for public comment, and if you feel strongly one way or another about a project, this is a time when you should make yourself heard. Visit the Zoning Commission web site for additional details. (Of course, the time when I decide to highlight this public participation aspect of the zoning process is when only one of these four pending ZC hearings actually has a Public Hearing Notice--containing the instructions for participating--posted on the ZC calendar.)
 

It appears that the work being done at 1st and M (wrapping back toward L Street) is plumbing/pipe work of some sort under the street and sidewalks, not any-second-now demolition of On Luck and the other buildings (although I imagine that's not far behind, given that construction on 100 M Street is supposed to start "late summer 2006" according to Opus East). And the Sunoco station at 50 M Street is indeed now being dismantled. But still no announcement of any big deal for that lot.

More posts: 100 M, Homewood Suites, M Street, Square 743N
 

Eagle-eyed boots on the ground report seeing the appearance today of No Parking signs along M Street between New Jersey and 1st Street--in front of On Luck, Zohery Bus Tours, and the Metro entrance--marked as lasting from Aug. 12 to Aug. 30. Dovetailing with what I've heard elsewhere, this may well mean that demolition on that corner is about to start. (I would guess that it will happen the same time along the rest of that block of 1st Street, back to L Street.) This is to clear the way for the 100 M Street office building and the 1100 First Street residential tower, which will be built concurrently. Some folks have also mentioned the fence that has gone up today around the Sunoco station at 50 M--there's still been no word on the sale of that property, so I don't know if demolition is imminent there or not. UPDATE: I went and took a look myself, and there are also No Parking signs along the eastern side of 1st Street between L and M, marked as starting August 8 through December 8. Also, the Sunoco fences also have signs on them indicating that it is a Sunoco construction zone. Perhaps Sunoco is demolishing the station themselves--but to make way for what, we all want to know? Is it the rumored hotel? Will the hotel folks be buying the land, or is Sunoco keeping the land and handling the development themselves? We shall see....

More posts: 100 M, Homewood Suites, Onyx, Square 743N
 

Today's WashTimes has "Hotel Industry Gathers Momentum in Near Southeast", keyed to today's "opening" of the Courtyard by Marriott at New Jersey and L. (They're having a grand opening party tonight, but of course the hotel actually opened to customers in March.) The article mentions three other hotel projects on the boards, at Florida Rock (That's "FRP Development" in the story), Herb Miller's garage-wrapper plan just north of the stadium, Half and L (the Ron Cohen project, which I've heard nothing about for quite some time), and Maritime Plaza (east of 11th Street). The project it doesn't mention is the rumored sale at 50 M Street of the Sunoco station to a hotel developer of some sort--still no confirmation of that anywhere.
 

Big surprise this morning--a correspondent reported that the Sunoco at 50 M Street (Half and M) is being dismantled as we speak. (Waah, where will I track gas prices now?) There's been no record of a land sale in the DC Property Sales database (although that currently runs about 6 weeks behind and is only updated right now through late May). However, a call to the station's phone number revealed a change to a new number with a 703 area code, and the person who answered said that Sunoco had sold the land "to a hotel or something." So do we have yet another new development arriving on M Street? More as I get it.
More posts: Homewood Suites, M Street, Retail
 

Another item to add to your busy Zoning Commission calendar: The Zoning Commission has placed on its July 10 agenda the new office building project at 250 M Street--it is actually part of the Capper/Carrollsburg planned unit development, so this is coming before the Zoning Commission as a second-stage PUD. UPDATE, 7/11: The second-stage PUD was approved for setdown; a hearing date should be set before too long.
 

Two more buildings have come down in the ballpark footprint in the last 24 hours: the blue Follies building on O Street, and the AAMCO car repair shop on South Capitol between N and O. And the white garage at 1st and N continues to be demolished, the brick parts of the structure near N Place were torn down yesterday.
FRIDAY UPDATE: The trash garage at 1st and O is now completely gone; so is the third of the four buildings on the north side of O (leaving only the four-story building that was home to Heat). The buildings along Half between O and N remain, however--they're probably on next week's agenda. (No new pictures, I'm trying to pace myself a bit.) Even better news--during the 30 minutes I spent walking around the ballpark site, the prices at the Half and M Sunoco dropped from $3.19 to $3.11. (No, I'm not taking credit.)
More posts: Homewood Suites, Nationals Park
 

The new office building planned for 250 M Street ("Federal Gateway II") is, from a zoning standpoint, actually part of the Capper / Carrollsburg planned unit development (PUD), and last week an application was filed with the Zoning Commission for approval of the 250 M second-stage PUD. The application describes the project as a 110-ft-high, 9-story building with ground-floor retail and 194 spaces of underground parking. A hearing date has not yet been added to the DCOZ calendar. William C. Smith, the project's developer, is touting delivery of the building in late 2008.

 
75 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8