Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 400m
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


33 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4

A correspondent passed along an image from the paperwork filed with the Zoning Commission for the stadium hearing last month, which shows a concept rendering of the now-infamous condo- and hotel-wrapped parking garages on the north edge of the stadium site. I've put it at the top of my Stadium Renderings page, where you can scroll down to remind yourself of the plain parking garages originally planned for that location. Now I just have to figure out how I'm going to move all my discussions and photos of this land between N Street and N Place to my Ballpark District page without completely gutting my Stadium page :-). (I think I'll wait until the Ballpark District Master Plan is released.) In the meantime, I also added a couple of new photos to my M Street page, my Capper/Carrollsburg page (celebrating at long last the completion of above-ground demolition on the 3rd/4th/I/Virginia block), and the Capper Seniors #2 page (the 4th and M location is starting to look very different).
 

It's been a while (I've been out of town), so I'm now catching up and giving you updated construction photos of 20 M Street and Capper Seniors #2, which are both making good progress. I also added two new shots to my Stadium Construction Gallery, but I didn't visit my perch on the South Capitol Street Bridge today, and until the stadium skeleton actually starts to appear, I probably won't have too many new photos, and it might be just as interesting to visit the Clark/Hunt/Smoot Stadium Construction Cam every so often. Holes in the ground are tough to make exciting from street level :-). As always, let the icon be your guide. (I'd post updated photos of the continuing Capper demolition, but for crying out loud they're STILL not finished with the tiny block bounded by Virginia, I, 3rd, and 4th, which they started eight weeks ago. I think I could have done it faster with a hammer and shovel.)
 

A beautiful afternoon for a photo excursion, and you can see a smattering of new shots on my pages for 20 M Street, the Ballpark District (with shots of the new bright-yellow Monument Realty signs), Capper/Carrollsburg (where in one month they've managed to demolish just two of the two-story buildings at 3rd and Virginia), Capper Seniors #2 (which is showing good progress) and of course the baseball stadium. The icon is your guide for the latest offerings.
 

Both the office building at 20 M Street and the wraparound construction at Capper Seniors #2 are starting to become much more visible, so I've added new pictures to each of their pages.

More posts: 20 M, 400m, Capper Senior Apt Bldgs
 

With some demolition now underway (veeeeery slooooowly), I've freshened up my Capper/Carrollsburg page with some new photos. I've also updated the construction photos for the two Capper Seniors projects, and for good measure tossed in a couple of new shots on the Capitol Hill Tower page, to celebrate the opening of the Courtyard by Marriott, the first Near Southeast project I've tracked from its beginning to end....
 

Here today, I am righting a wrong that has left me filled with guilt for years--I'm finally adding a page on my site about the Earth Conservation Corps's Old Capitol Pumphouse location, tucked away between Florida Rock and WASA on the edge of the Anacostia River. See the ECC's own web site for more information about what this group does for local youngsters and also for the river. (They certainly will have a front-row seat to the stadium!) And while I was out, I snapped a couple of shots to add to the WASA page as well as the Capper Seniors page, with construction on both #1 and #2 proceeding along. I also updated the Capper Seniors #1 slideshow. Just because.
UPDATE: I got on a slideshow roll this afternoon, and updated and enlarged the three existing ones (DOT, Capper Seniors #1, and Capitol Hill Tower), and then added two more Capitol Hill Tower slide shows, including one of the project's southeast corner, so you can watch the Star Market go from stand-alone to oppressed neighbor. So go play with them.

 

Stop the presses! I have NON-STADIUM news! Hallelujah! Construction has begun on Capper Seniors #2, the wraparound addition to the Carroll Apartments for low-income seniors at 4th and M. This new construction will add four stories and 130+ units to the 64 units in the Carroll building. Scroll to the middle of my Capper Seniors page for a rendering of the new construction, and photos of the current site. As for Capper Seniors #1 at 5th and Virginia, construction is speeding along, and I promise once the Christmas rush is over to post new photos. For more detail than one would ever want on the entire Capper/Carrollsburg project (and Canal Park, too), read the Feb. 2004 Zoning Approval for the Capper PUD.
 

Some Capper/Carrollsburg items: I hear tell that the construction contract for Capper Seniors #2 will be awarded soon (once the money aspect of the project gets settled, also "soon"). Also, word is that the Capper Community Center is to be demolished, Any Minute Now (we have a lot of those type of items, don't we?). In zoning news, the October Voice of the Hill gives details on the Sept. 15 zoning commission Capper / Carrollsburg agenda items--in addition to a second-stage approval being sought for a three-acre section of the project (presumably the "ribbon" between 5th, 4th, I, and M, which was demolished nearly a year ago), the developers are submitting a new application with modifications to several aspects of the original plans: they are seeking to increase the residential density to 2.34 from 2.21, and at the same time are proposing to reduce the parking spaces per unit to 1.38 from 2.1--these changes are the result of efforts to preserve some of the existing private houses that had been slated for redevelopment, according to a DC Office of Planning staffer. No date is yet announced for the public hearing on this.
 

I've been away for more than a week, so I apologize if my news items have been slow--I'm still catching up on some things, hope to get back up to speed soon. In the meantime, I'll pass along that the DC Zoning Commission approved the Capper Seniors #2 building, approved for setdown the Capper/Carrollsburg 2nd stage PUD (which I believe means that basically they've agreed that they should have a hearing at a later date), and deferred the final vote on the stadium text amendment to the Capitol Gateway overlay, presumably until their October meeting. I'd be able to give you more details on all this, but I mistakenly believed the DCOZ web site when it said that Zoning Commission meetings are streamed live, and, well, this one most assuredly wasn't. Waaah!

 

The DC Office of Zoning has posted its agenda for the Sept. 15 meeting, and it includes the stadium text amendment for the Capitol Gateway overlay, as I expected. But they're taking up other Near Southeast items as well, both having to do with Capper/Carrollsburg. I'm not 100% versed in zoning minutiae (I might have made it to the 30% mark by now), so I'll just parrot what the site says, that the Capper/Carrollsburg 2nd Stage Planned Unit Development (PUD) and Modification is on the agenda. I believe that a second-stage PUD means a specific, fully engineered, plan for the site is being submitted for approval. So I hope that's something we can get a look at pretty soon. I would also think that this submittal means that the project may be kicking into a higher gear soon, as also evidenced by 15 building permit requests submitted at the end of August for addresses within the Capper/Carrollsburg boundaries.

There's also an additional agenda item for "Capper/Carrollsburg Venture LLC -- Senior Building," which I believe is a revision of the design of Capper Seniors #2, because the design submitted in 2003 included a blank wall along M Street, which is a zoning no-no in this area. The need for this vote was discussed at the Jan. 12, 2004 meeting, and is probably why the project's building permit application has the zoning section marked "Hold for Correction." (Yes, my head hurts, too.)

Speaking of second-stage PUDs, while wandering around on the web trying to educate myself on this topic, I found this 1999 National Capital Planning Commission document, showing the detailed plans for Florida Rock. However, that was then and this is now, and in December the Zoning Commission will be again taking up Florida Rock's second-stage PUD. So we'll have to wait and see what changes have been brought by six years (and a baseball stadium next door).

 
33 Posts:
Go to Page: 1 | 2 | 3 | 4