Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: One Hill South
See JDLand's One Hill South Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


25 Blog Posts Since 2003
Go to Page: 1 | 2 | 3

Not sure exactly when this happened, but sometime within the past few days the Wendy's on I Street between South Capitol and Half streets, SE, has finally closed down, after being rumored to be coming Any Minute Now since May. JPI has announced plans for its fourth Capitol Yards residential building on the site, a 420-unit "loft-style" building called 23 Eye that would also have ground-floor retail. Previous statements from JPI had pegged the start of 23 I's construction this fall--I haven't heard whether that's still the plan.
Comments (0)
More posts: One Hill South, One Hill South, Restaurants/Nightlife, jpi, Square 697n
 

The fine folks working the Wendy's drive-through window this evening at South Capitol and I tell me that their closing date is now the end of July. At this point (this is the third date I've now heard, starting with end-of-May, then end-of-June), I'm just going to not say anything more about it until I see locks on the doors. The property is part of the footprint for JPI's fourth Capitol Yards apartment building, 23 I at Capitol Yards, which JPI has said would be starting constuction this fall. We shall see....
Comments (0)
More posts: One Hill South, One Hill South, Restaurants/Nightlife, jpi, Square 697n
 

Since it's such a rotten day, I'll go back to when the sun was shining (Tuesday), and give you my first-ever photos from the roof of 20 M Street. (I've taken a few photos from inside the 10th floor going back to April of last year, but from the roof I don't have deal with the pesky glass reflections.) Here are these new photos matched with the oldest ones from the same angle, so you can compare 13 months' worth of changes easily; you can also look at all the photos if you want to watch the progression of changes. There's views to the north (above), showing the digging now underway at 1015 Half Street along with the construction progress at 70/100 I, 909 New Jersey, and Velocity (plus the site-clearing at 23 I). To the south is the increasingly-shiny 55 M, as well as the ballpark, of course. I also tossed in some photos toward the west, showing the skyline of Southwest.
 

When I went out yesterday to get photos of the demolition getting underway at 23 I, I also took a fair number of photos along the way on First, Half, New Jersey, I, and K, even though the weather was less than optimal. (Some day I'll get bright blue skies again.) The ones of 909 New Jersey show how it's now almost three stories above ground, and they hint at how much this 12-story building is going to change the northern end of New Jersey Avenue.
You can see all the shots paired with their befores at these links: New Jersey at I and K, First at I and K, and Half at I and K (where those with xray specs might be able to make out the excavation work underway at 1015 Half). The icon is a bit misleading on some of these, because it's still showing for pics taken in April that I didn't update this time around (but perhaps you missed them in the ballpark whirlwind, anyway). And use the See All Photos of This Angle icon to see the range of photos between the "before" and the "after." I hope to get some more photos this weekend, weather permitting.
Comments (0)
More posts: 1015 Half, One Hill South, One Hill South, 909 New Jersey, jpi, Square 697n
 

With the ballpark now humming along like it's been here forever (Tom Boswell has a litany of good things to say in today's Post) , interest is starting to turn toward what sort of retail/restaurant options are going to come to the neighborhood, and when. For your Friday time-killing pleasure, I've tossed together a quick a survey of what's either available now or will be coming within the next two years. (I'm not including already existing retail; I'm just looking at where new stuff could arrive.) As of now, I've seen no announcements of tenants for any of these spaces, but maybe if residents, workers, and ballpark fans clap their hands and wish real hard....
* 20 M - Completed in March of 2007, its 11,000 sq-ft of ground-floor retail space would seem to be an enticing location (just across the street from the Navy Yard subway station's ballpark exit), but so far there's been no takers. "Coming soon" signs that were in the windows last year for Wachovia and Kinko's are now gone.
* Capitol Hill Tower - A 7,000-sq-ft restaurant space in the ground floor of this co-op building has been advertised ever since the building opened in 2006, but no takers so far.
* 100 M - The 240,000-square-foot office building at First and M is scheduled to be completed later this year, and they're offering 8,500 sq ft of "corner restaurant/retail space" with "great ceiling heights, storefront and outdoor seating." (There's no ground-floor retail planned for Onyx on First in the same block.)
* 55 M - The first part of Monument's Half Street project is this 275,000-sq-ft office building now under construction at Half and M (it's the building on top of the subway station entrance). It has over 10,000 sq ft of retail spaces on Half, M, and Cushing, and should be completed by mid-2009. (See retail spaces 1 through 4 on this page at the official web site.)
* 909 New Jersey - For the folks who choose to walk from the Capitol South Metro station, the under-construction residential building at New Jersey and K is going to have 6,000 sq ft of ground-floor retail space when it's completed in summer 2009.
* Velocity - The ground floor of this 200-unit condo building at First and L will have retail (I can't find how much), and will be finished by late 2009.
* The Yards - By the end of 2009, the renovation of the old Boilermaker Shop at Third and Tingey into a 46,000-sq-ft retail space should be completed, and there is also 10,000 square feet of ground-floor retail space planned for the Pattern Shop Lofts building on the south side of Tingey, which should have its conversion into a rental building completed by the end of next year as well. Both of these are situated on the route that most Nats Express users walk along to get from the shuttle stop at 300 M to the ballpark. (But will the Nats Express run after this year?)
* Half Street Part 2 - The southern part of the east side of Half Street north of the ballpark is going to be a combination of a 200-room hotel and two residential buildings totaling 340 units, with about 40,000-sq-ft of ground floor retail to entice the throngs that walk along Half Street before and after games. (See retail spaces 5 through 8 on this page at the official web site.)
* 1015 Half - Opus East hasn't yet committed to whether there will be ground-floor retail in this 410,000-sq-ft office building at Half and L, though about 10,000 sq ft of space will be there.
* 23 I - If this 420-unit apartment building does indeed begin construction in September of this year, there could be 15,000 sq ft of retail available at Half and I by the end of 2010.
That's about 200,000 square feet of space to be filled within the next few years--and this doesn't include the retail spaces in the ground floor of the baseball stadium along First Street (who knows when those will be occupied). It's possible other buildings slated to have ground-floor retail could pop up between now and the end of 2010--1111 New Jersey and 250 M are the main candidates.
And there will also could be more offerings at the Yards by 2011 (including that grocery store planned for 401 M as well as the Lumber Storage Shed and other to-be-built pavilions at the Waterfront Park). And maybe the first building at Florida Rock, across from the ballpark's grand staircase, could be done by the end of 2011. But this is getting a little too far down the road....
 

Thanks to reader E. for the tip that demolition work is underway today along Half Street between I and K, where the little gray Alpha Towing building stands; as of earlier this morning, the brick wall was apparently down. This is the site of JPI's planned 23 I Street apartment building, which is expected to start construction by early fall. I don't yet know the fate of Wendy's next door, which is also part of the 23 I site and which was supposed to be closed down as of today. I will go check it out as soon as the rain stops. (This frickin' weather, I am so tired of it. And it scuttled plans I had today for something cool, which hopefully will happen next week--you'll have to wait to find out what it is. So do a sun dance!)
UPDATE: Yup, all gone. Building #152 demolished since 2003. Wendy's is still open, though, and one of the workers there told me they're open through the end of June. I've added a few new photos on my 23 I page to show the changed landscape as of this afternoon. (The sun appeared about 20 minutes later. Damn you, Old Sol!)
Comments (0)
More posts: One Hill South, One Hill South, Restaurants/Nightlife, jpi, Square 697n
 

With raze permits having been filed recently for the Wendy's on I Street and its little gray neighbor to the east along Half Street, we knew that their days were numbered. JPI informs me that Wendy's will be closed by May 1, and that demolition on the two sites will happen over the summer, to allow construction on the 421-unit 23 Eye at Capitol Yards to begin in September.
Also, JPI's Capitol Yards buildings at 70 and 100 I, which together will have nearly 700 rental units, are now scheduled to open in June and July, respectively. 70 I is known as "Jefferson at Capitol Yards", while 100 I has snuck in a name change and is now "Axiom at Capitol Yards" (after a brief interlude as "Mercury").
In the meantime, the fourth Capitol Yards sibling, 909 New Jersey, is just about at ground-level, meaning that Nats fans walking on New Jersey Avenue to get to and from Capitol South will soon see a new skeleton rising up. The 237-unit rental building is scheduled to open next year.
The official web site has animated computer renderings on Jefferson, Axiom, and 909, and a mailing list for those interested in more information.
Comments (0)
More posts: One Hill South, 70/100 I, One Hill South, 909 New Jersey, jpi
 

Raze permits have now been filed for the Wendy's at 23 I Street and its little gray neighbor at 901 Half Street on the corner of Half and I. These two lots totaling about 47,300 square feet were purchased in late July for $28.625 million by JPI, and the company is planning "23 Eye at Capitol Yards," a 421-unit residential building with up to 35,000 square feet of retail space. Late last year JPI was saying that 23 I would start construction this August--I haven't seen anything lately on whether that's still the case. I haven't had a chance to swing by Wendy's to see if they have a closing date, so if anyone thinks to ask while they're at the drive-through window, let me know. This project would be the youngest of the four Capitol Yards siblings, joining 70/100 I arriving later this year just across the street and 909 New Jersey coming in 2009 one block to the east.
 

I wandered around on Sunday for a photo session, wishing that spring would hurry up and get here so that the sun will rise higher during the day and set farther west so that I can stop dealing with the damn glare whenever I face southward.
* I have new images along N Street just north of the ballpark between Half and First, which show the work at the entrance plaza at Half Street, including glass now being installed on the ground floor of the western parking garage, as well as the structures that will make up the entrance gates.
* In fact, I updated all 12 angles of the Half and N intersection, which now that it has its new wide sidewalks, curbs, streetlights, and an initial paving job, is really a stunning testament to 24 months of change, not only on the four corners of Half and N but the blocks to the north as well. It's definitely worth a look.
* I took a lot of photos of the now-demolished Willco stretch along First Street (and gave the project its own page as well), and of course I got all the usual angles of 55 M Street.
* On Half Street between I and K, where JPI's 23 I Street residential project is expected to start this year, a pile of red-and-black advertising banners have been hung on every available surface, and a "JPI Permit Parking only" sign has appeared on the entrance to the former towing company's parking lot on that block. I'm guessing JPI's purchase of the property just closed. I haven't heard anything about potential start dates for this project, or when the Wendy's might close.
* If you browse all the photos I took yesterday, you'll also see a smattering of 70/100 I and 100 M shots as well as images of the two blocks along Third Street where temporary surface parking lots are going in (so now my pictures of those blocks have changed from post-demolition views of nothing to pre-blacktop views of nothing). And the always popular shots from the SE Freeway at South Capitol are updated, too.
And don't forget to click on the icon wherever you see it to see all photos in the archive of a certain location.
 

Time again to dig into the What's the Deal With....? mailbag. Reader BH has asked about the two boarded-up gas stations and the old KFC along South Capitol Street, wondering when they're going to be demolished.
I have no answer, alas, for the former Exxon station on the east side of the street at I, which has been closed since May 2006 after its owner pleaded guilty to double-billing government contractors for more than $120,000; JPI was apparently somewhat interested in acquiring it so that they could build 23 I on the entire block, but that doesn't seem to have happened.
The KFC/Taco Bell closed in June after being bought by Ruben Companies, which has long-term plans for an office building on the site, to match their SC1100 on the east side of the street and 21 L Street to the north. However, they are not planning to demolish the KFC anytime soon, and in fact are looking to rent the space to a food-related business in the near-to-medium term.
The second Exxon, on the west side of the street south of K, closed at the end of August. The rumor was that the lot was going to be sold, but so far no transactions have shown up in the DC property sales database. (Ruben owns the other two-thirds of that block, which is the 21 L Street site.)
(I went 1 for 3 on this. Yeeech. This is what I get for not anticipating that WTDW.... questions wouldn't necessarily be ones I know the answers to! But I'm willing to keep trying--if you have a WTDW.... question, pass it along. Be advised, though, that I'm posting these as I can get to them, so submissions may not get addressed right away.)
 
25 Posts:
Go to Page: 1 | 2 | 3




                  © Copyright 2024 JD.