Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 20 M
See JDLand's 20 M Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


52 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6

Anyone who's lived in DC for any amount of time will be stunned to read today's Post story, "As Stadium Clock Ticks, DC Officials Bicker," detailing the difficulties of getting a design for the new baseball stadium agreed upon. Much of the trouble revolves around the desire (pushed most vehemently by Jack Evans) to have views of the Capitol Dome from as many seats at the stadium as possible. More from the story: "Evans argued that a view beyond center field of one of the city's signature buildings would give fans a sense of place and provide grand shots for national television cameras. At Evans's urging, city planners recently stopped work by Lerner Enterprises on construction of a 130-foot office building on M Street SE, one block north of the stadium. People familiar with the matter said the move angered the company, founded and run by Theodore N. Lerner, who is among those bidding to buy the Nationals. City officials said late last week that they will allow the company to resume work because it has abided by city building regulations. Company officials declined to comment. Evans also has discussed limiting the heights of buildings being planned by Monument Realty, which owns land on N Street SE that abuts the stadium site. City planners worried that such a move would inadvertently harm the creation of an entertainment and shopping district around the ballpark, which has been promised by another powerful player, the Anacostia Waterfront Corp." The article also says that groups are bickering over who has final say on the design. The stadium is supposed to begin construction in March, 2006.

 

Fences have gone up, and construction equipment has begun to arrive at the 20 M Street lot. This building will be the 5th new office tower on M Street since 1999. With more to come, I'm sure.

More posts: 20 M
 

It's site update day! I've posted new photos on the following pages: DOT HQ, Capitol Hill Tower, Nationals Stadium, and M Street. And because I don't always put the latest photos at the top of these pages, I'm now including a   icon with the pictures to help you pick out the fresh content. Also, as I threatened a few days back, I've created a page for the 20 M Street SE office building project. Not exactly a barn-burner of a page at this point, since I can only post so many pictures of an empty lot without going crazy, but it's a start.

 

Lerner Enterprises announced today that construction will begin this summer on 20 M Street, a 10-story 190,000 sq ft office building, with completion scheduled for Summer, 2007. The property, designed to be "Green" and which will also have retail on its first floor, is on the northwest corner of the Half and M intersection (currently a parking lot), diagonally across from the Navy Yard Metro station and one block north of the new Nationals stadium site. No tenants have been announced. Whiting-Turner will be the general contractor. You can see a few photos on my M Street page, and I guess before long I'll be creating a 20 M page!

More posts: 20 M
 

News continues to pick up:
· Linda Cropp appears to be backpedaling, and now says she supports the Mayor's baseball stadium financing plan but wants to "explore" private financing options.
· Demolition continues at Capper/Carrollsburg between 4th and 5th Streets. The section south of L is about 70% demolished, and work began today on the section north of L Street. A worker told me that the demolition phase is expected to last about 90 days, and will also include demolishing the buildings on the southwest corner of 3rd and L. (I presume this is to help clear the way for construction of 250 M Street, but I don't know for sure.)
· A Lerner Enterprises new press release included a tidbit that construction of 20 M Street SE will start in Spring, 2005. There didn't seem to be any hint of it in a recent WBJ article on the area, so I'm a bit skeptical, but we'll see. Maybe the pending arrival of the baseball stadium has jump-started their market.
More posts: 20 M, Capper, Nationals Park
 
52 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6