Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 1325sc
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


29 Blog Posts Since 2003
Go to Page: 1 | 2 | 3

A few items of Near Southeast interest were on last night's Zoning Commission agenda. First, the commission unanimously approved the modification to the Capper/Carrollsburg PUD to change the makeup of Capper Seniors #2 (now nearly completed at 4th and M) from all units for low-income seniors to add some workforce-level (30-60% median income) units as well. Seniors will have first preference, followed by former Capper/Carrollsburg residents who meet the income requirements; because there are no one-bedroom units in the public housing portion of Capitol Quarter, making this switch at Capper Seniors #2 means that former residents in need of a one-bedroom have the chance to move back this year, instead of waiting for 2011 when the multifamily mixed-income buildings get built along 2nd Street. In return for this modification, the developers agreed to amendments recommended by the Office of Planning that additional shared parking spaces be created within three blocks of the building, and that two ride-sharing cars be located at Capper/Carrollsburg (also within three blocks of Seniors #2). So, look for more news in the coming weeks on the "Ballpark Apartments".
The commission also unanimously approved a modification to the office building at 100 M Street that needed to be undertaken because their sidewalk along 1st Street is being narrowed thanks to a decision by DDOT to widen 1st Street north of M to allow for two traffic lanes, two parking lanes, and a bike lane. The commissioners were not happy with DDOT's move, lamenting that the ZC's attempts to create walkable communities with vibrant ground-floor retail and outdoor seating space can get thwarted by a DDOT decision like this one. But the commissioners also agreed that the 100 M developers shouldn't be penalized for DDOT's mischief.
There was supposed to be a final vote on the Capitol Gateway Overlay Review for 1325 South Capitol, the new residential building across from the Nationals ballpark, but that has been deferred to the commission's April 9 public meeting.

 

While you ponder the upcoming Zoning Commission vote on the 1325 South Capitol Street residential project, you can gaze at a new drawing of the building, nicked from the WDG Architecture web site. It's certainly a much more detailed and spiffier rendering than what was previously released....

More posts: 1325sc, South Capitol St., zoning
 

The Zoning Commission has deferred until its March 26 Special Public Meeting any decision on whether to allow Capper Seniors #2 to be redesignated as a mutlifamily workforce (30%-60% annual median income) dwelling in addition to having its low-income senior citizens units. ZC chair Carol Mitten noted a bit of a disconnect between statements offered by the DC Housing Authority and the Office of Planning, and so both are to meet before March 26 to formulate a recommendation.
The March 26 special meeting will also have the ZC's final vote on the 1325 South Capitol Street residential project, and also the "minor modification" being requested at 100 M Street.
And, since I gave the Office of Zoning a bit of a hammering a few weeks back when they debuted their new online calendar, it's only fair that I now rave over the return of monthly at-a-glance lists for Zoning Commission and BZA meetings, which make finding out what's happening far far easier. Thanks, guys, not only is it great to see this functionality back, but you did a really nice job with it, too.
 

The draft agenda for the March 12 ANC 6D meeting has been sent out (although not posted on their web site as yet, alas), and there are a few Near Southeast items of interest: discussion and vote on an construction agreement (presumably between the developers and the neighborhood/ANC) for 1325 South Capitol Street (the 276-unit residential project across from the ballpark); a presentation on modifications being requested in front of the Zoning Commission to the plans for the office building at 100 M Street (I don't know any details, will post when I find out); and a presentation on streetscapes at the The Yards/Southeast Federal Center (ooooh, more hints of moving forward!). There's also a meeting on the planned Monument Realty project on the Randall School site at Half and I Streets SW (blissfully outside of my purview). The meeting is at St. Augustine's Church at 6th and M Streets, SW at 7 pm.
UPDATE: The 100 M Street change is quite minor, according to Opus East, a result of actual construction drawings evolving from the original design drawings. I also hear tell that First Street is going to be widened at some point by DDOT, which means that 100 M and Onyx on First won't have a wide/deep sidewalk along as originally thought. (I don't have any details on the First Street work.)
UPDATE II: The ANC 6D report in the new issue of the Hill Rag has more details on the 1325 South Cap construction agreement as discussed at the February meeting, though I don't know whether it's changed or not going into tonight's meeting. It also says the project has 276 units, not 244 as I've been reporting.
 

Last night was the public hearing and Capitol Gateway Overlay Review for 1325 South Capitol Street, a 244-unit residential building planned by Camden Development for the northwest corner of South Capitol and O streets, right across the street from the new baseball stadium. First, I will admit right off that I am only grudgingly following this project (I still optimally want my coverage area to end in the South Capitol Street median), but I'm not sure that excuses the sordid truth that, while watching the webcast of the hearing, I kind of, well, um, nodded off. Multiple times. So apologies that what follows does not rise to the normal level of JDLand OCD Detail.
In general, the ZC commissioners were favorable toward the project and were also cognizant that 1325 is a bit of a test case in terms of being the first structure going up on South Capitol Street under all the new rules; they were also quite happy to see a residential project on South Capitol, seemingly expecting that the street would only be drawing in office developments. There was some concern that the ground floor level of 1325 is not completely retail--there will be a two-story retail component on the O Street corner, but the rest of the first floor will include a gym and other areas for residents; but these areas will have the same sort of glassed-in look to make it appear "active." There was also discussion of the west side of the building, which abuts a number of townhouses and will be easily seen when looking eastward from the neighborhood, that because of this layout it can't really be considered the "back of the building", and so the commissioners want more "articulation" on that side. Also, the project will not being applying for LEED certification, but the commissioners want to hear more about what "green" steps the project will be taking. There was also some discussion about the Inclusionary Zoning (i.e., affordable housing) components, and whether the project can restrict those units to the lower floors.
If all requested additional submissions are made in time, a ZC Special Public Meeting will be scheduled for March 20 for an initial vote. (Perhaps I won't be as sleepy on that night.) It is expected that construction would begin sometime this summer, with delivery in summer 2009.
More posts: 1325sc, South Capitol St., zoning
 

Tomorrow night (Feb. 22), the DC Zoning Commission is having a public hearing on Case 06-41, a Capitol Gateway Overlay Review for 1325 South Capitol Street, the planned 244-unit residential building at South Capitol and O streets SW, right across from the ballpark. The ZC hearing is available via live webcast. Apparently this project was presented at the Feb. 12 ANC 6D meeting, but since the ANC for four of the last five months has been unable or unwilling to send out its agendas before the meetings or post them on their web site (check out those dates!), I wasn't able to post a heads up that this project was going to be discussed.
On the other hand, the agenda has already been released for the Feb. 28 Anacostia Waterfront Corporation Public Board Meeting, where one of the main items will be a presentation and public comments on the AWC's Draft Environmental Standards, and also a presentation on their new Workforce Intermediary Services. See the agenda for time and place and how to participate.

 

I've finally uncovered a roundabout way to find out about pending raze permits (right now, raze permit applications are not tracked or listed in any way on DC.gov--waaah!). The city's Historic Preservation Office sends out via e-mail weekly permit reports for the entire city (the HPO is contacted by the Department of Consumer and Regulatory Affairs to confirm that building/raze permits aren't for buildings with some landmark status or other hold). Recently mailings have indicated that raze permits are in process for 1015 Half Street (Nation) as well as most of the buildings on Monument Realty's properties along Half, N, and South Capitol Streets (26, 30, 32, and 68 N Street, 1241 and 1243 Cushing Place, and 1236 South Capitol). This reports from HPO don't mean that razing is imminent (for instance, the Monument Realty raze permit requests came through HPO in mid-October), but do show that plans for demolition are more than just theoretical. UPDATE: I knew I forgot something when I posted this; I meant to include that, while I haven't seen a raze permit, a correspondent has reported that tenants told him that the beige brick building at South Capitol and O SW is scheduled to be demolished just after the New Year, to make way for the 1325 South Capitol 244-unit residential building.

 

There are projects immediately adjacent to Near Southeast that I won't be tracking with my usual level of obsessive-compulsiveness (no photos, dedicated pages, etc.), but I will mention big milestones if I hear about them. And so first is the announcement of a pending public meeting by the AWC on October 10 on the Poplar Point Site Development Plan process--this is the 70-acre on the Anacostia on the east side of the South Capitol Street Bridge, just across the river from Florida Rock, where possibly a new DC United stadium may be built. (Note that the transfer of this land from Federal to District control is still pending in Congress.) The other project is 1325 South Capitol Street SW, on the western side of the street between N and O (in other words, directly across from the stadium). GlobeSt.com reports (hat tip to reader RR) that Camden Property Trust is planning a 244-unit 210,000-sq-ft building on the site, with construction to start in Q2 2007. (I know, it's just across the dang street from Near Southeast, and maybe by the time the project starts I'll cave and decide to track anything that actually fronts South Capitol. Because there aren't enough projects for me to track :-).)

 

Longtime readers know that I'm pretty militant about remaining within my Near Southeast boundaries--otherwise, folks would have me covering the entire city, and I don't get enough sleep as it is :-). But I do relent once in a while, especially when it comes to something that's all of about 30 feet outside my purview, and so I'll mention this Post item, "Development Buzz Crosses South Capitol Street," which says: "A Texas real estate investment trust, Camden Living, bought two lots totaling about 41,000 square feet in the 1300 block of South Capitol St. SW at the corner of O Street, just across from the baseball stadium site. [...] Camden Living, which specializes in residential rental properties, is expected to build apartments on the lots, which now house a taxicab company, a storage lot and a small office building." I won't continue to follow this project, but at least those of you who are interested can now do your own sleuthing....

More posts: 1325sc, South Capitol St., Nationals Park
 
29 Posts:
Go to Page: 1 | 2 | 3