Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 1221 Van
See JDLand's 1221 Van Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


29 Blog Posts Since 2003
Go to Page: 1 | 2 | 3

ANC 6D ventured across South Capitol Street into Southeast for its meeting on Monday night, with enough items of interest on this side of the street to draw even me to attend. The rundown:
BALLPARK SQUARE: Grosvenor and McCaffery Interests, developers of this hotel/residential/retail project along the west side of 1st Street north of N Street, say that they hope to start construction before the end of the year, though at this point the building permits are still pending. The 325-unit apartment building and 170-room hotel (operator not yet announced) are expected to take about two years to complete once construction gets underway. Their "intention" is to construct at the same time the separate two-story retail pavilion nestled between the arms of the Hampton Inn on the corner of 1st and N, with an eye toward completing it before the 2016 baseball season, though no tenants have been secured at this point.
Once construction begins, the existing sidewalk will be blocked, with pedestrian traffic expected to be moved to a covered structure in the 1st Street parking lane (and bike lane), though the final configuration is still under negotiation with DDOT, with the Nationals offering input as well, given the site's location just north of the ballpark.
Also, note that the 99 M Street office building planned for the north end of this block is being developed separately by Skanska and is on its own schedule, separate from these projects. (Building permits are filed, not yet approved.)
250 M: WC Smith is asking the Zoning Commission for a second third extension to the second-stage PUD for its long-planned 230,000 square foot office building, which was originally approved in 2007, then revised in 2008, and given its first extension in 2010 (and another in 2012). This would push the required date to file for a construction permit to Sept. 2016, with construction being required to commence by Sept. 2017. WC Smith's representatives noted the current state of office development basically requires a building to be 70 percent leased before financing can be procured, but that recent activity in the office leasing market "gives us hope" (especially with about 33 million square feet of GSA leased space turning over in the next few years.) Smith's Brad Fennell said that the company is "committed to the site," feels that office space "is the right use for this spot," and has been working hard to find potential tenants. (All of which is laid out in more detail in the zoning filing.)
The ANC supported the request for an extension 6-1, with Roger Moffatt voting against.
Fun fact for readers who haven't been around for this building's history: it is actually part of the Capper/Carrollsburg Planned Unit Development. It would only occupy about half of the block bounded by 2nd Place, 3rd, L, and M--the north end of the block is slated to someday be a Capper mixed-income apartment building.
(In other WC Smith-related news, I was told that the company hopes/expects to begin pouring the slab at the bottom of 800 New Jersey/Whole Foods in two months or so.)
1244 SOUTH CAPITOL: JBG came to the ANC looking for its support for this project's Capitol Gateway Overlay Review, which I wrote about in detail a few weeks back and which is scheduled for Nov. 13.
There have been some small tweaks to the design, along with now an additional variance request to have two 20-foot and two 30-foot loading bays, since original plans to have a 55-foot bay and two smaller bays has run afoul of the teensy width of the block's alley and of Van Street, where the bays will be located. Otherwise, this remains designed as an apartment building with 290ish units and about 26,000 square feet of retail.
The ANC voted to support the project 7-0.
 

Materials filed with the Zoning Commission earlier this month are giving a first glimpse at JBG's plans for 1244 South Capitol Street, on the northeast corner of South Capitol and N, just across from Nats Park's Parking Lot C.
It will be a residential building with 290ish units and about 26,000 square feet of retail, and the renderings indicate that the design by architect Eric Colbert and Hariri Pontarini isn't a "typical" Washington DC box-like building. Images show the building's west side, facing South Capitol Street, with only six floors of height at its middle, allowing the interior courtyard to be open to South Capitol from the 6th floor on up, breaking up the pure U-shape that is so often employed 'round these parts. A few more views (click to enlarge):
At left is a stylized version of the view that you'd see standing at Van Street one block west of the Center Field Gate, looking toward the big self-storage building and points to the northwest. At right is a closer view of the South Capitol Street facade and the courtyard, upper floors, and roof. (Note that in these three drawings you can see hints of Akridge's proposed Half Street residential building on the perimeter, though that's not appearing to be getting underway anytime soon.)
The 26,000 square feet of retail will of course warm the hearts of stadium-goers, and the filing indicates that the retail spaces will wrap around on three sides of the building. This rendering depicting the corner of South Capitol and N (with a certain dome in the distance) shows two stories of retail along both streets, with more ground-floor spaces designed along Van Street.
There would be 176 parking spaces on three levels below ground for vehicles and and 100 spaces for bikes. Residential units would range from studios to 2 BR/den. The courtyard and 6th-floor open space would have plantings and seating areas, while the roof would have a pool, lounge areas, and a bocce court (!). These plans also show "rooftop dining" at the far northwestern corner. (And will residents be able to sneak a peek at games while hanging out poolside? The image up top seems to show an angle for that to work, but it's hard to tell if the entire field would be visible.)
The design will get its Capitol Gateway Overlay District Review hearing on November 13, and it will be interesting to see how the Zoning Commission members react to the design.
Comments (5)
More posts: 1221 Van, Development News, zoning
 

Goodness, these piled up all of a sudden. Let's start with the food and drink-related items:
* Strolling by the long-in-the-works Willie's Brew and 'Que at the Boilermaker Shops over the weekend, I saw that flat screen TVs are now up on the walls. I imagine they are dreaming of being open by Opening Day.
* Ice Cream Jubilee at the Lumber Shed now has its tenant layout permit approved, so work should be underway there.
* PoPville reports that Hill Country's attempts to open a temporary location on Tingey Plaza behind USDOT haven't worked out.
And, on the non-digestible front:
* SWill reports on ANC 6D's newest commissioner, Stacy Cloyd, who is filling the 6D02 vacancy left by Ed Kaminski. A resident of Southwest, Stacy will also be representing areas east of South Capitol, including Velocity, Capitol Hill Tower, and Nats Park (and River Parc, before long).
* DDOT has released its draft Request for Proposals to the short-list finalists for the first two phases of the South Capitol Street project, which include building the new bridge and also rebuilding the interchange of I-295 and the Suitland Parkway.
* The new owners of the lot at South Capitol and N just north of Nats Park have withdrawn the pending zoning case for the site, which predated the property's recent sale. The previous ownership group had long been working on an office project, but in its withdrawal letter 1244 South Capitol Residential LLC says it is "studying development of the property for residential uses," and that it plans "to submit a new application for Capitol Gateway review in the near future."
* Outside the boundaries, but Near Southeast residents may still be interested in the looming start of the huge Wharf project on the Southwest Waterfront, with a ceremonial groundbreaking scheduled for March 19. Here's the Post's story on the new development, along with a photo gallery (which might seem to have a somewhat familiar style) of the current waterfront, before it's gone.
 

DC property records report that JBG has purchased the former Monument Realty parcels on the northeast corner of South Capitol and N, just north of Nats Parking Lot B.
The property records on this week's sale show the buyer as "1244 South Capitol Residential, LLC," which may be a hint at what JBG has in mind for the site. Bisnow, in quoting JBG's Matt Kelly, says "the firm is 'a probably a year or two from starting anything' at the newly purchased site, and that it could be developed for any number of uses." Bisnow also says JBG paid $17 million for the site.
The main parcel was once home to a BP/Amoco gas station, and five other parcels were undeveloped as well (except for the cutest little yellow building on South Capitol that disappeared about seven years ago).
Monument and its investment partners (including Lehman Brothers) paid about $10 million for the six lots in multiple transactions in 2005 and 2006, and in 2008 began some initial bureaucratic moves on plans for a residential building that went nowhere. In late 2010, they went to the Zoning Commission with a request to review new plans for a 12-story office building, but that review didn't move forward until mid-2013, and is in fact scheduled to have its final vote in early January. In the meantime, about a year ago Lehman Brothers took full ownership of the site (since it had been the lender on the original loan).
JBG has just one other property in Near Southeast, but it's a big one: the 1.1 million-square-foot US Department of Transportation headquarters at New Jersey and M, which began construction in 2004 and opened in 2007.
Thanks to many purchases in the Great Ballpark District Land Rush of 2004-06, Monument at one time controlled quite a few properties in the blocks just north of the ballpark. And while the company still owns the old Domino's site on the southeast corner of South Capitol and M, as well as the infamous Half Street hole in the ground, the other properties have since fallen off their inventory, including the recently sold 55 M office building. The company's 50 M site, on the northwest corner of Half and M, was also returned to Lehman Brothers a year ago, and then sold this past May for $13 million to a team mulling a hotel. And at one point Monument had owned the land along N where the southern end of the Fairgrounds now stands, but sold it to Akridge in 2008 during all the fallout of the sale of the Southeastern Bus Garage.
 

Today is the city council's monthly legislative meeting, and since they don't have one in August, this one--like all July ones--has an agenda a mile long, with a few items related to Near Southeast:
There's an emergency bill to correct a problem with the 2005 bill that transferred Tingey Street to the city--a drafting error apparently drew the road through part of the Pattern Shop Lofts.
And the "Taxation Without Representation Federal Tax Pay-Out Message Board Installation Act of 2007" (Bill 17-0028) is finally getting a vote--this is the bill that would put electronic tote boards on the Wilson Building and the ballpark showing the federal taxes that District residents pay while still having no votiing representation in Congress. You can read more about it here and here--I don't know if the bill being voted on today has the same language as the original one introduced in 2007, since the council was told pretty clearly by the Sports and Entertainment Commission that the stadium's lease agreement states that the Nationals control the signage on the stadium's interior, exterior, and perimeter, and the DCSEC's outside counsel feels that this tote-board bill "could conflict" with the lease.
But first up, on the consent agenda, is the bill to close the alley between South Capitol and Van just north of the old BP Amoco station on N Street across from the ballpark. This request is coming from Monument Realty, so they can combine the Amoco lot with the parking lot to the north of the alley and develop the site as a residential building with somewhere between 180 and 210 rental units, with 15 or 16 of them being affordable units priced at between 50 and 80 percent of the area median income. There would also be about 14,000 square feet of ground-floor retail.
I failed my fiduciary duty to ever post a summary of the hearing on this bill held back in May, but most of what was said at the council hearing wasn't too different from the presentation about the closing to ANC 6D in January. Monument's representatives told the council that they would expect to start the project approximately 18 months after receiving the alley closing (depending on market conditions, of course), meaning it wouldn't deliver before 2011. Monument is not so far committing to any sort of LEED certification for the building (though I imagine that changes if they don't build it before the city's new green building laws go into effect). The project would also need a Capitol Gateway Overlay Review by the Zoning Commission.
The hearing starts at 10 am, and can be seen on DC Cable 13 or via streaming video. I'll update this entry later today with the various outcomes.
UPDATE: I haven't started watching the proceedings yet (I'll be spending my evening fast-forwarding through them), but the Post's DC Wire blog has an entry on another bill of interest being brought up today, to improve upon the locations carved out for street vendors near the ballpark (here's the map). Some council members want the vendors much closer (presumably, along Half and N streets), which the Nationals and MLB are not much in favor of. Other council members say that bringing the vendors closer should wait until the construction near the ballpark is completed. We'll see what happens with the bill today.
FAST-FORWARDING UPDATE: What more could I want to do with my evening than to sit here speeding through 8-plus hours of city council proceedings? Here's what I'm finding:
* The Square 700 alley closing passed its first reading on the consent agenda.
* The Tax Pay-Out Message Board bill passed its first reading--Chairman Gray said that the second message board would be built "on public space near the Washington Nationals baseball stadium," which gets around the problems I described above with the original bill. Apparently Chairman Gray had discussions with the Nationals earlier this year about putting the sign at the ballpark, and the Nationals did not indicate any sort of desire to have the sign, so the compromise was hatched to put it on public land near the ballpark (I'm trying to find out where). Marion Barry pronounced himself "appalled" at the Nationals' refusal to put up the sign at the city-funded ballpark, calling the team "not good citizens." The sign at the Wilson Building is to be erected in time for the 2009 presidential inauguration, so that the entire parade can march right past it.
* The "Tingey Street, SE Right of Way Amendment Emergency Act of 2008" passed its first reading, so the street will no longer run through Building 160. Whew!
* I'm going to address the vending expansion bill in a new entry. Check back later for that.
 

It's nowhere near as exciting as zoning hearings (then again, what is?), but I see that the City Council hearing on the bill to close a 2,400-sq-ft alley on Square 700 is happening tomorrow (May 29), after having been canceled back in February. The alley is just north of what used to be the BP Amoco station on South Capitol Street at N (which is now Nats Parking Lot N). Monument Realty is requesting this closure to allow for the combining of both the Amoco site and the parking lot to its north, with plans to build what was described in January as a residential building with 150-200 units and 14,000 sq ft of ground-floor retail space, as part of Monument's Half Street projects. Additional details are in my January report on Monument's request for ANC 6D's support (which they didn't get, thanks to a 2-2-1 vote). The bill is B017-0552, if you'd like some light afternoon reading. The hearing is scheduled be televised/streamed on DC Cable 13, starting at 10 am.
Comments (0)
More posts: 1221 Van, Monument/South Capitol St., zoning
 

* The Post says that 14,000 tickets to the April 17 Mass at Nationals Park will be distributed to 120 Catholic diocese outside of the Archdiocese of Washington, with the Diocese of Arlington getting 6,000 and the Archdiocese of Baltimore getting 2,500. And on Friday, parishes that are part of the Archdiocese of Washington will find out how many tickets they're getting--parish priests will then decide how to distribute tickets within the parish.
* The Examiner has a story about the Southeastern Bus Garage site and that the Nationals and Metro are in talks to provide 350 gameday parking spaces at the garage (plus three nearby WMATA-owned parking lots, though that's not specified in the article). The only real news in the article is that a judge is expected to rule this week on Monument Realty's lawsuit over the sale of the garage site to Akridge. For more background, read all my posts on the bus garage saga.
* Yesterday's scheduled council hearing on Monument's request to close the alley on Square 700 just north of the closed BP Amoco station was cancelled. No new session has been posted on the calendar.
* And the agenda for Thursday's WMATA Planning, Development and Real Estate Committee does not include anything on the joint development of the chiller plant site at Half and L, as had been anticipated back in January. Maybe next month?
* If you think you're excited about the local food vendors at the ballpark announced yesterday, you should read Marc Fisher.
* UPDATE: I've gotten word that the long article in the March Washingtonian on the ballpark is now online. The other related article, about residential developments planned around the stadium, won't be posted for a couple of weeks. So you'll just have to go buy it, I guess. And perhaps you too can then be like the poor soul at Safeway on Sunday reading that article, who got accosted by a pesky blogger in line in front of him pointing to a name on the page, saying, "That's me." Thankfully he didn't call security.
 

At Monday night's ANC 6D meeting, Monument Realty presented its request for the ANC's support in closing a 2,417-square-foot alley that runs between South Capitol and Van streets not far north of N Street. This alley is north of the now-closed BP Amoco and south of what is now a WMATA employee parking lot on land owned by Monument (there used to be a neon yellow bungalow there, until late 2006). Christy Shiker of Holland & Knight told the commissioners that the Amoco property--which faces the ballpark's western parking garage--is too small to develop on its own, but with the alley closed and the lots combined, Monument would build a 130-foot-high residential building with approximately 150 to 200 units plus 14,000 square feet of ground-floor (or perhaps two-story) retail. Monument is not committing at this time to pursuing LEED certification for this building.
Shiker then described the community benefits package that Monument was offering to the ANC in return for the loss of this public space, including a $50,000 contribution to the community fund, the retail, First Source employment preferences, and an affordable housing component that would match whatever is called for whenever the city's Inclusionary Zoning mandates are finally hammered out. Monument would also work toward agreements on ANC6D resident preferences, to be determined with the ANC at a later date.
This became a sticking point, with Commissioner David Sobelsohn concerned about giving the ANC's support for this project merely on promises to make agreements later. Shiker pointed out that Monument has made these agreements before for their other Ballpark District projects, and also that the ANC will have another crack at the project when down the road it undergoes its mandatory Capitol Gateway Overlay Review. But Sobelsohn still felt that the ANC was being handed a "take it or leave it" proposition.
An audience member asked if Monument would be planning to build a temporary parking lot if the alley closing is approved, but Shiker said that Monument's goal is to develop the land, that they "want a building, not a parking lot." (Though one must admit that that is some pretty plum stadium-parking territory.) There were also questions about the Public Space Storage building just to the north (echoing my WTDW entry from last week), but Monument's representatives said that they didn't think the storage company would be moving.
Commissioner Bob Siegel moved to support the alley closing with further negotiations on the proposed benefits package as the project proceeds, but the ANC voted 2-2-1 and so the resolution did not pass.
The alley closing bill is B17-0552, and Shiker told the ANC that she expected a public hearing in late February, with perhaps council action in March or April. No date for actual construction of the project was mentioned.
Coming tomorrow--a recap of the Florida Rock portion of the ANC meeting, though you don't have to wait until then to see the latest project renderings that were presented. But my long-winded summary of what was said during the meeting will have to wait a bit longer.
 

In the past few days I've mentioned the start of construction on the first of the temporary surface parking lots at Capper and the transformation of an existing lot at 1100 South Capitol into a monthly lot managed by Colonial Parking. Today I see that the dirt is being dug up at 1000 South Capitol, which had a public space permit approved a few weeks ago for the construction of a parking lot. This property is owned by Lerner Enterprises (yes, the same Lerners that own the Nationals) and they have eventual plans for an office building on the site, but it shouldn't be a surprise that they would give this land over at least temporarily to the Ballpark Parking Cause.
Additional dispatches from today's drive-around:
* Equipment has arrived on site at 1345 South Capitol, presumably for the start of excavation for this 276-unit residential project across the street from the ballpark.
* The DC Foreign Car Shop at 31 K Street and the buildings along First Street and N north of the ballpark are still standing;
* A very affable-looking "Hospitality Ambassador" from the Capitol Riverfront BID was answering questions with a smile at the Navy Yard Metro entrance;
* The amount of construction and roadwork from New Jersey Avenue west to South Capitol really is unbelievable. (I rarely drive through the neighborhood during the day on weekdays, so most of you long-suffering residents and commuters are already well aware of this.) But seeing it in full swing just reinforces my New Year's resolution to restrict my photo treks to Sundays, when the commotion is taking its Day of Rest.
UPDATE: One more tidbit: a permit has been approved to remove the underground storage tanks at the BP Amoco at South Capitol and N. I had thought that maybe it was only temporarily closed because of the construction on N Street, but this probably means it's gone for good. As for what might appear in its place--the land is part of Monument Realty's vast holdings north of the ballpark, but no development plans for the site have been announced. In the meantime, I bet it would be a handy spot for a parking lot!
 

In case you've already grown tired of the ballpark photos I posted on Monday showing the eastern and southern sides of Nationals Park, I've now updated the South Capitol Street images, too. (The northern views will have to wait until the reconstruction of N Street eases.) The main Ballpark Exterior Photo Gallery is now in pretty good shape after a short span of neglect (but as I said the other day, I think I needed the break).
I also took some new photos to capture the progress at 55 M Street, plus the completion of demolition at 1345 South Capitol.
If you don't feel like clicking around on all those links, here's all the photos I've posted in the past week. Try not to be blinded by those blue skies!
A few other items of note: The BP Amoco station on the northeast corner of South Capitol and N has fences up around it--I can't believe no one let me know! It's owned by Monument Realty, and I haven't heard about any near-term plans for the site. This leaves only one gas station in Near Southeast--the Exxon way over at 11th and M. There used to be three gas stations on South Capitol, now there aren't any. (And I've lost yet another source for my Gas Prices page. Waah!)
Also, new fences have gone up around the 1015 Half Street site, taking up one lane on K Street and on Half Street. Some exterior work was done to the DC Foreign Car building, but the little building is still there. For now.
I hope to get updated photos of 70/100 I and the pile of rubble that used to be old Capper Seniors within the next week. There's just too much activity to document these days--I've got to break it up into manageable pieces....
 
29 Posts:
Go to Page: 1 | 2 | 3




                  © Copyright 2024 JD.