Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 11th Street Bridges
See JDLand's 11th Street Bridges Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


159 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 16
Search JDLand Blog Posts by Date or Category

Couldn't leave all these morsels until the normal Tuesday Tidbits slot:
* More Demolitions Coming: Raze permits have now been approved for the Miles Glass building at 8th and Virginia and its next-door neighbor, the closed auto repair shop at 7th and K. National Community Church, which owns the lots and others on the same block, said back in January that a temporary parking lot and "community green space" will be coming to the site while the church continues to work on its final plans for the site, which in the past have been described as being a combination of coffee house, performance space, and church offices.
* Yup, Navy Yard-Ballpark. The new Metro subway map is out, and confirms that Navy Yard-Ballpark is official.
* Bike to Work: May 18 is DC's Bike to Work Day. One of the pit stops is the Yards Park, from 7 to 9 am, and you get a t-shirt if you register and then stop at your designated pit stop.
* Bridge Recreation: If the notion of the "11th Street Recreation Bridge" captured your fancy, you can see some additional stories on the idea by Lydia DePillis, BeyondDC, and WJLA. DePillis notes that the city isn't intending on paying for this entire thing itself, and a decision needs to be made by May whether or not the new 11th Street Local bridge will have the bulb-out viewpoints built (they'd be unnecessary if the current downstream bridge was being kept). WJLA, on the other hand, mentions that "some" are concerned it "could become a hotbed for crime"--which led to a fun Twitter back-and-forth that devolved into using the new bridge for a Jason Bourne/James Bond-type chase sequence.
* Mobile 'Hood: The Capitol Riverfront BID has launched a mobile version of its web site, which uses your phone's GPS to give you information on food, developments, and events near your location.
And, of course, if you want to know what your current location looked like before all the changes started happening, you can go to my mobile site (m.jdland.com) or jdland.com/here on your phone and you'll get my oldest photos looking in each direction from the corner nearest to where you're standing. (Read more about how that works.)
* Fairgrounds: DCMud looks at the plans for the Half Street Fairgrounds (which I broke the news of back in February), with a few neat new renderings. And then the piece drops a mention at the very end that "DCRE Real Estate" is handling the retail leasing for the project--that's DCMud's company, and the writer of the blog post is also the agent handling the leasing. (Just in case you like to be aware of those sorts of things when getting your news.) In the meantime, a few shipping containers were spotted on the site last week.
* Across the Way: A 5,000-seat concert hall is being designed for the Southwest Waterfront. (If you haven't been keeping up with the plans for The Wharf, SWill can help.) And the de-skinning of the old EPA buildings, visible from parts of Near Southeast, is part of their rehabilitation into the Sky House apartments.
 

Via TheWashCycle, the city is apparently looking at the concept of transforming the downstream, soon-to-be-abandoned outbound 11th Street Bridge into an "11th Street Recreation Bridge," calling it an "opportunity for a destination linking river trails and recreation amenities."
This PDF from the Office of Planning (interestingly, it has the file name "Constituent Request.pdf") has a couple of concept drawings, some graphs about development in the surrounding areas, and keeps mentioning a "proposed design competition" to generate ideas for how the span could be used after the new 11th Street Local Bridge opens this summer.
There's been back-room chatter for a while that Office of Planning director Harriet Tregoning has been interested in preserving one of the existing bridge spans as a potential "High Line" for Washington, DC, and there have also been calls from various residents (including Near Southeast's own Man About Town David Garber) to build some sort of pedestrian bridge linking the two shores of the Anacostia River.
WashCycle says that DPW (? maybe OP?) is holding a meeting on March 28 at 6:30 pm on the concept, though I can't find any press releases or anything about it on dc.gov.
I'll be interested to see how it's proposed to get people up to it from the western shore, given that the approach to the old bridge is supposed to be demolished in order to complete the new 11th Street Local bridge's "arrival" at street level near 11th and O, and then allowing two-way traffic to run on 11th Street by the Navy Yard.
I'm guessing there will be plenty of chatter about this to come!
Comments (5)
More posts: 11th Street Bridges, bridgepark, meetings, riverwalk
 

Take a gorgeous Sunday, add an obsessive-compulsive need to document all the change underway, and what do you get? Nearly eight miles of walking and a shameful number of new photos.
The Foundry Lofts building is all but done, with only the retail spaces left to be built out, so I took a bunch of "after" photos that will probably last for a while. But that new Potbelly sign sure stands out! I also pressed my nose against the glass to peek inside the sandwich shop's space--it sure doesn't look far from opening.
Embarrassingly, I haven't had a camera in hand on the Navy Yard's portion of the Anacostia Riverwalk since 2004. (I'm always worried they're going to toss me in the brig as a security threat, especially after a run-in a few years back where I was chased down by both a gate sentry and the DC police after taking photos of the Hull Street gate from across M Street.) But I pushed forward yesterday and got a bunch of new shots that I've added to my Navy Yard page, taking care to demonstrate to the many security cameras that I was photographing the river and not the installation. (Don't miss the especially cool before-and-after of the gate to the Yards Park.)
I will probably be creating a separate Riverwalk page before too long, but not today.
Along 11th Street at N and M, photos are more notable for what's not there anymore, as the demolition of the embankment for the old outbound RFK ramp is done, and the path of the new ramp from M Street for traffic headed to the outbound 11th Street Bridges freeway traffic becomes more obvious. Also see this picture of the work on the 11th Street Local bridge, showing the demolition of part of the old outbound bridge approach, which has to be done before the new local bridge can hook up with 11th Street. (You can see it as well in my O Street before-and-afters, if you figure out what to look for.) Check my 11th Street Bridges photo page for more images.
Then there's Canal Park, where I mainly took some new photos of the pavilion under construction near M Street, since photos of digging and ground work don't quite rise to the level of "interesting." I also hit most of the angles for the Boilermaker Shops, as well as for Capitol Quarter Phase II, where the security guard expressed concern about my actions (I need a laminated Photography Approved card or something). And I wandered the 225 Virginia/200 I perimeter.
If you're a glutton for punishment, you can browse the 267 pictures from this trek that are now in my Photo Archive, using the links to see before-and-afters.
 

I'm a bit under the weather these days, so I'll go with a minimalist approach of mostly Tweeted items:
* Lost in the digital piles on my digital desktop was the CapBiz tidbit about a Bang Salon being housed in the new Vida Fitness gym that is supposed to be coming to the neighborhood as part of the Yards' Teeter/Residential project on 4th Street. (As for the "at the Navy Yard" description, I'm pretty sure that this project isn't happening inside the walls of the Washington Navy Yard.) Note that Forest City has yet to officially announce Vida as a tenant for the project, though they sure came close a few weeks back.
* If the neighborhood seems locked down on Wednesday, it's probably because of this little get-together at Nats Park.
* Speaking of the stadium, the Nats have launched "Take Back the Park" to try to head off the Philly Fan Invasion for the May 4-6 games.
* The agenda for ANC 6D's next meeting is out, with the only Near Southeast item being "Half Street Shipping Container Fairgrounds Concept," which according to David Garber will be on the Das Bullpen site at Half and M and is something along the lines of this. Looks hipster-riffic! The meeting is Feb. 13 at 7 pm.
* Outside the boundaries updates from SWill: Z-Burger is supposed to be opening over yonder today, and a juvenile facility will be moving into that long low gray building on the west side of South Capitol between M and N.
* DDOT tweeted that the 11th Street Local Bridge "is expected to open in late spring." This is the bridge with the pedestrian/cycling path that will run from 11th Street south of N by the Navy Yard into downtown Anacostia.
 

The news of the two freeway spans of the 11th Street Bridges opening over the past few weeks is of course the most interesting part of the current state of the project's construction, but there's plenty of work still happening on the Near Southeast side of the Anacostia River, from the new "11th Street Local" bridge that will open this summer (seen at right) to various other new ramps and flyovers.
So on Sunday I did a lot of hoofing and driving to bring you this new 11th Street Bridges Project Photo Gallery, showing the most interesting views I came across. I walked up onto the old outbound bridge (totally legal! sidewalk and everything!), I ventured down to N and then O streets, and I went north to where the new girders have been installed above 11th Street to connect the inbound freeway traffic to the Southeast Freeway and where the new ramp up to 11th Street from the old Pennsylvania Avenue/Barney Circle connector is under construction.
I also updated a lot of intersection shots in my official Photo Archive, so if you're wanting to see before-and-afters from the streets surrounding the bridges project, check out 11th & M, 12th & M, 11th & N, 12th & N, 11th & L, and 11th & the freeway (the shots above are a teaser) for all your change-is-a-comin' images. (Though not every photo was updated, so look for the icon.)
And, because I'm a goofball, I also tossed together this quick montage of the photos I took on my first trip across the new outbound freeway bridge. (Yes, that's on a JDLand Google+ page. I haven't done anything with it, but if you want to show me there's interest in my getting more active there, you can follow the page and we'll go from there.)
Plus I freshened up the photo portion of my 11th Street Bridges project page, which is the place to go if you're not up to speed on exactly what all this construction is going to accomplish. (DDOT's recent video will help you with that too.) But really, start with the photo gallery.
Comments (0)
More posts: 11th Street Bridges, photos
 

UPDATE: The new span will indeed open on Saturday, Jan. 7, as confirmed Thursday evening by a DDOT tweet. Watch for detours during the day as they make the switch.
On Tuesday, DDOT tweeted thusly: "Traffic alert: if the weather holds, we expect the new outbound 11th Street Freeway Bridge to open this Saturday."
They also sent out a handy YouTube video explaining the phases of construction that the entire project has seen so far and will see before all is finished, which I urge you to watch so that I don't have to try to summarize it all for the 7,000th time.
One item in the video that I hadn't seen mentioned before (it's at about the 45-second mark): with the opening of the new outbound freeway bridge, commuters from the Southeast Freeway/I-695 who want to get into the neighborhoods just east of the river will need to exit at 6th Street SE and get themselves to the existing ramp at 11th and O SE to go across the old outbound bridge. This will be until the new 11th Street Local bridge opens this summer. So watch for some traffic tieups at the 6th Street ramp and along Virginia Avenue, 8th Street, and M Street.
Dr. Gridlock has more on the changes, and my 11th Street Bridges project page has overviews of the entire reconstruction.
Comments (0)
More posts: 11th Street Bridges
 

On Wednesday and Thursday (Dec. 28 and 29), watch for closures on 11th Street SE between M and K between 5 am and 4 pm as workers install girders above the street as part of the new flyover connecting the 11th Street Bridges and the Southeast Freeway (or, as we probably need to start calling all of it, I-695). Here's the details, including where the detours will run.
If you've been by that stretch of 11th Street lately, you've seen the girders making their big bend westward, stopping just above 11th Street. (This is the pier that the girders are now being placed on, as seen back in October.) It will certainly change the vista on that stretch. I'll get photos after the girders are in place, and when the sun comes out.
In other 11th Street Bridges news, you probably noticed that the new outbound freeway span didn't open this past weekend, as had been hoped. DDOT tells Dr. Gridlock it will probably now be "early January." "The earlier opening had been a long shot anyway," DDOT spokesman John Lisle is quoted as saying.
Comments (1)
More posts: 11th Street Bridges
 

The District Department of Transportation will be hitting a big milestone in the $300 million, four-year project to build three new 11th Street Bridge spans, as the new inbound "freeway" span will be opening by Monday morning, Dec. 19.
Mayor Gray will be participating in a ribbon cutting ceremony on the new span Friday morning, then there will be a weekend's worth of lane closures on I-295 and associated roads as the switch takes place, but DDOT expects to have traffic running on this new span by Monday's morning rush hour.
The new outbound freeway span is "tentatively" scheduled to open next week (Merry Christmas, commuters!).
There are still numerous flyovers and ramps that will need to be completed in order to add the highly anticipated new movements between the bridges and the Southeast Freeway and I-295, but that work can't be completed until traffic is moved to these two new spans.
The separate "11th Street Local Bridge" that will connect downtown Anacostia with 11th Street by the Navy Yard (and will include pedestrian/bicycling pathways) will open probably next summer. The entire project is expected to be completed by the end of 2013.
For far more information, check my 11th Street Bridges page and DDOT's official project page. You can also see the photos I took back on Nov. 1 of the progress on all three spans.
And here's the information on this weekend's road closures and detours in advance of the lane switches, which hopefully will also be posted on DDOT's web site soon:
· A single lane will be closed on northbound I-295 between Howard Road, SE and 11th Street from 12 am to 10 pm on Saturday, December 17.
· All I-295 northbound lanes between Howard Road, SE and 11th Street, SE will be closed at 10 pm on Saturday, December 17 through 9 am the following morning.
· The ramps from northbound I-295 (Exit 4) and 13th Street, SE to the existing 11th Street inbound bridge (Exit 4) will be closed from 9 am to 5 pm on Sunday, December 18.
· The ramp from the existing 11th Street inbound bridge to the westbound Southeast/Southwest Freeway will be closed at 10 pm on Saturday, December 17 through 5 pm the following day.
· Starting at 9:00 am on Sunday, December 18 one northbound lane on I-295 will be reopened to traffic and starting at 11 am a second northbound lane will also be reopened to traffic.
During the lane and ramp closures, signed detours will be posted.
Detours:
· During the closure of the northbound lanes of I-295, motorists traveling on northbound I-295 will be detoured via the ramp from northbound I-295 (Exit 4) to the existing 11th Street inbound bridge and M Street, SE to access the eastbound Southeast/Southwest Freeway using the 9th Street, SE entrance ramp. From eastbound Southeast/Southwest Freeway, motorists will access northbound DC 295 via eastbound Pennsylvania Avenue, SE.
· During the closure of the ramps from northbound I-295 and 13th Street, SE to the existing 11th Street inbound bridge (Exit 4), motorists will be detoured onto South Capitol Street to access the westbound Southeast/Southwest Freeway, Interstate 395, and destinations located via M Street, SE.
UPDATE, 12/19: At 11:38 am on Sunday, Dec. 18, the inbound span opened. Here's coverage from NBC4, and DDOT's own blog. And in all of this I should have mentioned that this opening included the new ramp down to M Street, bypassing the old 12th Street ramp/approach to M. There's now a new light at M for the two lanes of freeway-exiting traffic to turn left.
Comments (8)
More posts: 11th Street Bridges
 

* There was a "Wait, what?" moment on Tuesday when DCist reported that a velodrome would be coming in 2012 "in the shadow of Nationals Park in Southeast DC." I did some quick sleuthing, looking at the organization's web site and seeing Akridge as a partner, but I just couldn't place the design as being along Half Street. Then, thinking about how people so often can't get Southeast and Southwest straight when it comes to anything near the ballpark, I took a look at the Google Maps view of Akridge's Buzzard Point land at 1st and V SW, and Ta-Da! A pretty clear match.
But this morning, Akridge is no longer listed as a partner on the web site, and the site rendering is gone, too. Perhaps this is all just because final leases and paperwork hadn't quite yet been signed. (A not uncommon tale, young upstarts getting all excited about a pending deal and blabbing just a little too much info for the comfort of the big company they're dealing with. Though it doesn't necessarily mean the deal is dead.) Of course, this is all actually outside my territory, so you'll want to go to SWill for updates.
UPDATE: Jonathan O'Connell has tweeted this out: "Akridge spokeswoman on velodrome: 'We don't have an agreement.' And: 'I would say that putting Akridge on the site was probably premature'."
* Last Wednesday, DDOT installed the new Bikeshare station at 3rd & G, SE, on the north side of the Results parking lot. This is technically outside of Near Southeast, but it's probably now the closest station for Capitol Quarter folks (and me!). It has 19 docks.
* DDOT is shooting for the weekend of Dec. 16 to open the new inbound/outbound freeway spans of the 11th Street Bridges, and they tormented me with some helicopter shots of the current progress. (Though remember that it's just the spans opening--they still have work to do on the ramps and flyovers to add the new movements to and from DC-295.) They also tweeted that the 11th Street Local bridge is ahead of schedule and will open spring/summer of next year. My construction progress photos from Nov. 1 are a smidge out of date by now, but still worth looking at.
(Of course, you already know much of this if you follow me on Twitter or Facebook.)
 

The 11th Street Bridges folks have put out the word that this week they will be installing girders across M Street SE between 11th and 12th Streets as part of the new freeway flyover. They'll be doing the work from 9 pm to 5 am Nov. 7 through Nov. 10, and it will require closure of the inbound 11th Street Bridge exit ramp to M Street as well as eastbound M Street between 11th and 12th. (Westbound M will have "limited access.")
This flyover is what will be connecting the new freeway bridge to the westbound Southeast Freeway. You can see recent photos showing the progress of the entire 11th Street Bridges project in this October 7 photo gallery. It's expected that the new freeway bridge will open by the end of this year. (Which isn't far off!)
Comments (0)
More posts: 11th Street Bridges
 
159 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 16
Search JDLand Blog Posts by Date or Category