Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 11th Street Bridges
See JDLand's 11th Street Bridges Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


159 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 16
Search JDLand Blog Posts by Date or Category

At Monday's ANC 6D meeting, Bryon Johnston of the 11th Street Bridges Project gave a presentation on the rebuilding of the bridges, including an overview of the design and its main features as well as an update on the construction progress. He was nice enough to pass along the slides, which may not mean quite as much without his narration but are still helpful for people who haven't been following along through the process.
A few parts of the new design on the Near Southeast side of the project are worth (re-)pointing out, if you can make it through my torrent of descriptions:
* The "freeway" traffic and the "local" traffic will now be separated, with four lanes inbound and four lanes outbound on the freeway/upriver bridge and two lanes inbound/outbound on the "local"/downriver bridge (which Johnston was referring to as "Local 11th Street" because 11th will now feel like a street that crosses a river), as shown on slide 10.
* The local bridge will allow easier access between Near Southeast and Anacostia, for not only cars but pedestrians and bicycles, as well as streetcars when the routes are expanded. As part of this, 11th Street south of M is going to become two-way, and there will be bike lanes in both directions on 11th north of the bridge. (Slide 9)
* Another feature that appears to be coming together for pedestrians and bicyclists is creating two overlooks that jut out above the river on the south side of the local bridge--these would use two of the in-water piers from the current downriver bridge, and you can see them at left and on slide 11.
* One of the big changes for traffic flow for both Near Southeast and Capitol Hill is that there is going to be a new two-lane on-ramp to go westward on the Southeast Freeway toward Virginia at 11th Street, underneath where the current flyover ramps are. (See slide 7.) Folks who have easier access to 11th Street will no longer have to drive along Virginia Avenue and/or 3rd Street to go westbound on the freeway.
But part of this new 11th Street intersection is that traffic coming from Pennsylvania Avenue along the sunken road that currently feeds directly into the freeway will instead be brought up to street level at this new signalized 11th Street intersection and will then drive straight onto the new on-ramp. So there will be some consternation from drivers using this route. (This is also shown on slide 7.)
* To go across the river from Near Southeast on the freeway bridge, for access to DC-295 northbound and I-295 southbound, drivers will have a new ramp on the southeast corner of 11th and M (slide 4). The existing ramp at 8th and Virginia will still be available, too.
* There will still be an exit ramp from the inbound freeway bridge to I Street, just as there is now (slide 4).
* If you look at slide 4 very closely (and/or click on the bird's-eye view at right) and follow the paths off of each bridge, you can see how the freeway bridges coming across the river will have an exit for M Street similar to the current exit, but it deposits drivers at M just west of 12th instead of using 12th itself. It also no longer has the neat little N Street cut-through directly from the ramp that some Navy Yard workers cherish. To get to the Navy Yard, drivers will turn left on M, then left at 11th, and then go to whichever gate they need.
Other information in the slides includes: a graphic showing of the new ramps and accesses on the east side of the bridges at 295 and MLK (slide 12), of which the biggest addition is that you'll now be able to get to and from 295 and the bridges in all directions. There's also recent construction photos (including the first structural steel being laid on the freeway bridge), and information on stormwater management areas, and upcoming traffic impacts (slide 19).
It's expected that the freeway bridge will open about a year from now, with the new local bridge being finished in the winter of 2012/2013. (Dr. Gridlock wrote about recent milestones and upcoming work a few weeks ago.)
If you want to know more, there's my 11th Street Bridges project page, and you can also spend a couple months reading the Environmental Impact Statement to see all the studying they did of potential, um, impacts. There's also this Fact Sheet that they handed out.
Comments (0)
More posts: 11th Street Bridges, Traffic Issues
 

From the world of ANC 6D:
* The commission voted 7-0 to support the historic designation application of St. Paul's AUMP Church at 401 I St., SE, thanks in no small part to Pastor Karen Mills, who charmed the pants off the assembled commissioners and audience with a display of good humor sorely needed after some earlier rancorous exchanges discussing Southwest Waterfront issues.
The church was built in 1924, and apparently the years of having a congregation that didn't have a lot of money ended up being a good thing: because there have been few renovations, the church's facade and bricks are still from the original construction, making it a far better candidate for a historic designation than other churches which have had work done. The church is also notable for being the first church designed by R.C. Archer Jr., who was only the second licensed African American architect in DC. Once the church receives its historic designation, it will then be eligible for some grants to allow for historically accurate and preservation-approved renovations. (The photo above shows the church in 2007, when it stood alone after the demolition of the Cappers and before the start of Capitol Quarter construction.)
The church was approached for this application by the DC Preservation League, and the hearing before the city's Historic Preservation Review Board is scheduled for Nov. 18 at 9 am. You can see the information forwarded to the ANC about the application here (shot with my phone's camera, so not of particularly high quality, but it made me feel like a secret agent!). One other educational tidbit: "AUMP" stands for "African Union Methodist Protestant."
Pastor Mills also said that anyone who wants to come see St. Paul's is more than welcome to visit. And so it is with great shame that I admit that I have never been inside of the little church I've photographed so many times --I've always been worried that I would burst into the flames of eternal hellfire the second I stepped inside the doors, and I didn't want the poor little church to get singed as a result of my sins. But I'm now determined to give it a shot anyway.
* CSX/Virginia Avenue Tunnel: Stephen Flippin of CSX gave a(nother) update on the status of the Virginia Avenue Tunnel project. While CSX had applied for a $3 million grant under USDOT's TIGER II program to help pay for the NEPA process for the project, they didn't get that funding, so the process got delayed by a couple of months. They are now looking to have the first "public scoping meeting" in January, which would include information booths, audience comments and questions, etc. There would then be a 30-day comment period, followed by an "alternatives" meeting probably in March, then another comment period followed by probably five or six months of work with their design/build team before coming back to another public meeting for a full update on the project. After that, they would need a few months with their designers before construction could begin, which puts the earliest possible starting time for the project somewhere around the spring of 2012. (Definitely not a date written in stone.)
There's also the issue that funding for the tunnel project itself hasn't been secured, and so CSX is looking at various public financing possibilities (transportation reauthorization act, funding from other states in the National Gateway) as well as -- gasp! -- using some of their own money, or at least money they received for other parts of the Gateway that they haven't spent.
Beyond this update on the process, there's no new information on the construction itself, and there pretty much won't be until after the NEPA process is done.
* 11th Street Bridges: There was also an overview and status report on the 11th Street Bridges project; I'm hoping to get the slides that were shown, so I'll hold off on writing about that. If in the meantime you have 9 or 10 free hours and want to delve into all the environmental impact studies that were done for the bridge project (which include traffic estimations among many other things), here's the Environmental Impact Statement and other associated documents. UPDATE: Here's my writeup of the slides.
* Near SE/SW Combined Traffic Study: During a discussion about pedestrian safety issues at 4th and M, SW, commissioner Andy Litsky reiterated his long-standing complaint that no traffic study has been undertaken to look at Near SE and SW together, and that it continues to be sorely needed. Naomi Mitchell of Tommy Wells's office then spoke up that Tommy is ready to help the ANC finally get this study done. (And there was much rejoicing.)
* Half Street Closures: Apparently the city is planning to move legislation that would allow for the closing of Half Street, SE, between M and N during all events at Nationals Park with more than 5,000 attendees, instead of the current set-up where it's only closed during Nationals games. This would include recent events like the Susan G. Komen Race for the Cure opening ceremonies and last Saturday's Greater Washington Region Start! Heart Walk.
 

In case you don't have the date circled in red on your calendar, on Monday (Nov. 8), ANC 6D will be having its regular monthly meeting, and will be making the arduous trek across South Capitol Street to meet in Near Southeast, at the Courtyard by Marriott at New Jersey and L, SE. The agenda has just been sent out, and there are some Near Southeast items:
* The St. Paul AUMP church at 4th and I, which has remained standing while Capper came down and Capitol Quarter rose up around it, is the subject of a Historic Landmark application, which will be heard at the Historic Preservation Review Board's meeting on Thursday, Nov. 18. I hope to have more information about it when the HPRB's full agenda and materials are available on Nov. 12, but at Monday's ANC meeting there will be a discussion of the application and presumably a vote as to whether or not to support it.
* Updates are scheduled for both the CSX Virginia Avenue Tunnel project and for the 11th Street Bridges.
There are also a number of Southwest-specific items, some zoning rewrites, alcohol/beverage issues, and whatnot. But it's totally not true that the agenda also includes a knife fight between all outgoing and incoming commissioners.
The meeting starts at 7 pm.
 

I'm now back after a week wandering the Midwest again, this time spending a few days in Chicago and then going up to Milwaukee, where touring time was cut short thanks to that epic windstorm (but at least I got to see the Historic Third Ward and the Milwaukee Public Market). Lots of photos of streetscapes and buildings are here, if you feel like looking at some non-Near Southeast images for a change.
To catch up....
* Dr. Gridlock gave an update on the progress of the 11th Street Bridges project, which is now more than 25 percent complete. A pretty showy part of the construction will be starting soon, "when steel girders arrive for the new bridge spans. They will be trucked out onto the old bridges and lowered onto barges in the river below." The story gives this timeline: in spring 2011, the new alignment of southbound 295 opens; in fall '11, the freeway bridges (the upstream ones) will open; in winter 2012/13 the local (downstream) bridge between Anacostia and Near Southeast will open, with the entire project expected to be completed in summer 2013. (If the alignments and uses of the new bridges aren't clear to you, check my 11th Street Bridges project page for more detail.)
There's also some new lane restrictions that started last week and will run through Nov. 23: the left lane of 11th Street SE from M to N is closed, and N Street SE between 11th and 12th is closed overnight Tuesdays through Fridays. There are other restrictions and closures as well on 295 and the SE Freeway.
* The Post's Capital Business weekly has more information today on the foreclosure sale of 100 M, including this part that is probably of most interest to residents: "Although thousands of fans pour out of the Metro station nearby for baseball games, the Opus bankruptcy has prevented retailers -- other than a SunTrust bank branch -- from occupying ground-level storefronts. Michael Stevens, executive director of the Capitol Riverfront Business Improvement District, said he hoped that with new ownership, that would change. The retail broker for 100 M St., he said, 'has had some tenants that were interested in that property, but he couldn't sign any leases because it was in bankruptcy.' "
* It wasn't exactly a shocker that Greater Greater Washington endorsed David Garber for ANC 6D07 commissioner. Along the same lines, there's a good piece by Housing Complex this morning on the dysfunctional aspects of the ANCs, with some ideas on how to fix them. Having been tortured by sitting through many ANC meetings for more than five years now, I can certainly vouch for a lot of the issues mentioned. Perhaps there needs to be a Rally to Restore ANC Sanity.
* If you've wanted to know about Ann of Ann's Beauty Supply and Wigs Co. at 125 L St., SE, People's District recently profiled her. (Except I think they either mistranscribed the date of her shop opening, or this interview was done when her store was still in the old Waterside Mall in Southwest, because her store opened on L Street SE in 2005, not 1995.)
* American River Taxi, which is working to begin boat service between Georgetown, the Southwest Waterfront, and Diamond Teague Park, is hiring deckhands and captains. No word on when they'll get underway.
* Work has started in the ground floor of 909 New Jersey for the new Harry's Wine and Spirits. Alas, their timeline for opening has slipped (as all construction timelines do), and the owners now have their fingers crossed that they will be open by Christmas.
 

A few items from tonight's ANC 6D meeting, which is still going on (I bailed after the last Near Southeast agenda item).
* The commission voted 7-0 to support Forest City's zoning requests for its Parcel D project, the combination residential and retail (and grocery store) development on the southeast corner of 4th and M, SE. I wrote about it in detail a few weeks back, and you can see my Parcel D project page for renderings and additional information, but the short of it is it's a 220ish-unit residential building (with 20 percent affordable housing), a 50,000-square-foot grocery store, and an expected 24,000-square-foot fitness/spa company.
The Zoning Commission hearing will be on December 2, and Forest City is asking for two special exceptions (having to do with roof structures and the proposed 110-foot building height, which will be above the 90 feet that's allowed) and two variances (for a curb cut on M east of 4th for a new private service drive east of the new building and also for some balconies overlooking 4th). Forest City's Alex Nyhan also told the commission that, while the entire Yards project is designed to be LEED Gold, they are going to shoot for LEED Silver on this particular portion.
ANC 6D07 commissioner Bob Siegel commended Forest City on the plans, though he made very clear that he and his constituents want a sit-down restaurant more than anything. Nyhan replied that the Boilermaker Shop project one block to the west on Tingey will have four or five restaurants including at least one sit-down one when it opens next fall. Siegel then made the motion to the support the project, Commissioner Sobelsohn seconded, and the vote was unanimous. The National Capital Planning Commission and the US Commission on Fine Arts have both recently voted to support the plans and designs.
* During the public safety report, Capt. Gottert of MPD mentioned that while there were a rash of car thefts in PSA 105 (and 106 and 107) during the past few months, the police had a suspect in mind, and now that he's been apprehended, the thefts have stopped. Gottert had no additional information on Saturday's carjacking at 1st and L, SE.
* The agenda had as one of its items a request by the Nationals to add the stadium to the Navy Yard Metro station name (coming on the heels of the Capitol Riverfront BID's request last month to add their name to the station). However, ANC chair Ron McBee said that the Nationals hadn't yet been able to get their request completely lined up yet, and so the item was postponed.
* Next month's meeting will be on Nov. 8, and will be held at the Courtyard by Marriott at New Jersey and L, SE. Expected agenda items include an update from CSX about the Virginia Avenue Tunnel project, a plan to give historic landmark status to St. Paul's church on the southeast corner of 4th and I, SE, and an update on the 11th Street Bridges construction.
Comments (0)
More posts: 11th Street Bridges, ANC News, crime, meetings, Nationals Park, The Yards, Twelve12/Teeter/Yards
 

It's a busy next few days, so here's a reminder of what's on tap. (Of course, you could just look at my Events Calendar, but....)
* Today (Thursday) is the "Transportation Day" events that are part of the Anacostia Waterfront Initiative's 10th anniversary celebration. Get thee down to 1301 M Street, SE (site of the offices for the 11th Street Bridges project) for the kick-off at 10 am with DDOT director Gabe Klein, and/or attend the open house until 2 pm, which includes bus tours of current AWI transportation projects (like, say, the 11th Street Bridges). Circulator buses will be shuttling to and from the Navy Yard Metro station.
If you're wanting to know more about the Anacostia Waterfront Initiative and what's been accomplished up to this point, here's a spiffy "10 Years of Progress" booklet with all sorts of details.
* Friday brings the start of the Yards Park Grand Opening Weekend, starting at 3:30 pm, along with a full slate of events all day Saturday and a few more on Sunday as well--here's the specifics on all the activities for all three days. (UPDATED with a new more detailed flyer showing all the events.)
* The Nats are at home against the Marlins, playing at the usual 7:05 pm Friday and 1:35 pm Sunday times, along with a somewhat rare 1:05 pm Saturday start. It's Fan Appreciation Month, with all sorts of promotions and offerings.
* Sunday, Sept. 12 is the Fourth Annual Youth River Sports Day put on by the Anacostia Community Boathouse, now at their new home just up river from the Sousa Bridge. It runs from 11 am to 3 pm, and is free and open to the public.
* ANC 6D returns from its summer recess on Monday, Sept. 13. The agenda hasn't been released yet, but rumored items include the grant the BID is applying for to beautify the New Jersey Avenue "entrance" to the neighborhood, along with what I hear might be a presentation on a possible renaming of the Navy Yard Metro station. While I haven't heard what the new name might be, I imagine that some variant of "Navy Yard / Nationals Park / Capitol Riverfront" will be on the table. Which means that my last chance to convince people to rename the neighborhood Near Capitol Ballpark River Yards is probably passing by.
* And on Tuesday there's some sort of election. Perhaps you've heard about it. But good heavens, get yourself to the polls and vote. You don't even have to wait until Tuesday to do it.
 

The Anacostia Waterfront Initiative, the wide-ranging approach via city and federal investments to revitalize the Anacostia River and its environs, is celebrating its 10th birthday, with a series of events next week tied to the riverfront. Some of them you're already aware of, like the dedication ceremony at the Yards Park on Sept. 7 followed by the "grand opening weekend" of events Sept. 10-12. But there's also some other happenings, including an "Anacostia Conservation Service Event" at Diamond Teague Park at 9 am on Sept. 8, a "transportation open house and tour" at the 11th Street Bridges project office on Sept. 9 from 10 am to 2 pm, along with other events at Kingman Island, Marvin Gaye Park, and the Southwest Waterfront.
[And, should my feelings be hurt that the postcard advertising the celebration that came to our house was addressed to my husband and not me? What, I haven't demonstrated enough interest in the river? :-) ]
UPDATE: Just received a flyer about the Sept. 9 Transportation Day--it will start with a kick-off at 10 am with DDOT director Gabe Klein, then the open house until 2 pm, which includes bus tours of AWI transportation projects. Parking is limited at the open house site (over at 13th and M, SE), so they'll be running Circulator buses to there from the New Jersey Avenue Navy Yard Metro station entrance.
Comments (0)
More posts: 11th Street Bridges, Anacostia Waterfront Initiative, Teague Park, Yards Park
 

The Little Red Building at Second and L, SE passed into history on Wednesday, but at least it will live on in my Demolished Buildings Gallery, as building #160 to meet its maker since I started taking photos in Near Southeast. Also added to the gallery today are the Anacostia Community Boathouse and its sister building, demolished earlier this month to make way for the 11th Street Bridges. If you haven't wandered through the gallery in a while, take a moment to watch the neighborhood's old life pass in front of your eyes.
Comments (0)
More posts: 11th Street Bridges, Boathouse Row, Little Red Bldg/Lot 38 Espresso
 

I'm still eyeing a couple more days of (mostly) blog-free living, but a few items should probably be mentioned before the weekend, and so that you don't think I'm never coming back. First, the calendar:
* On Monday at 6:30 pm, the Zoning Commission will take up the Housing Authority's new request for another time extension to the zoning order that requires construction of the Capper Community Center. DCHA had asked for a two-year extension last year, but was only granted one year, and made clear at that time that they didn't foresee having the money to start the center in that shorter time frame, and that they'd be back to ask for another extension. And now they are.
* Speaking of the community center, there's now a big sign on its footprint (at Fifth and L) touting that the second phase of Capitol Quarter's townhouses is being funded by the American Recovery and Reinvestment Act. But you knew that already.
* Monday at 7 pm is the monthly ANC 6D meeting. I was hoping the agenda would be out before I posted this, but alas, no. Check back here or on their web site to see what scintillating topics will be up for discussion. (UPDATE: the agenda is now out, and there's nothing really major on it, other than a public space permit for the street work for Phase 2 of Capitol Quarter.)
* On Tuesday, July 13, the Capitol Hill Group Ministry is having its "All-Star Party Night" at Nationals Park, offering the chance to take batting practice, throw pitches in the bullpen, tour the locker room, meet Teddy, and more. Tickets are $55 per person and $15 for children under 12, with proceeds going to CHGM's programs for homeless and low-income families.
And a few other items:
* Today's WBJ reports that a third piece of "public" art is coming to Nationals Park; this time it will be 30 "stainless steel-domed forms which will accurately follow the theoretical model of the trajectory of a curving fast-ball pitch," which will be hung early next year on the exterior of the eastern garage. The steel spheres with cutout "laces," each seven feet in diameter, will feature programmable LED lights; the piece will cost about $950,000. As for the other two pieces of public art already at the stadium (the bronze statues in the Center Field Plaza and the "Take Me Out to the Ballgame" mobile near the First Base Gate), I'll quote WBJ's Michael Neibauer: "The first two pieces of public art at the stadium were, to be kind, not well-received at their unveiling in April 2009. The works were selected by arts professionals and D.C. residents, according to the arts commission, but some wonder: Did anyone ask the fans?"
* A reader reports that the Anacostia Boathouse at 11th and O, in between the 11th Street Bridges spans, has been demolished, which was expected because of the footprint of the new bridges. Haven't seen for myself yet to confirm.
* And I haven't felt the earth shift on its axis yet, so I assume the Little Red Building's exterior is still standing, although interior demolition has been going on all week.
 

From DDOT, an announcement of a slew of weekday lane closures starting Monday (June 21) through July 23 as part of the ongoing 11th Street Bridges reconstruction. The closures can happen between 9:30 am and 3:30 pm Monday through Friday, and may include locations such as the 11th Street Bridges (including the ramps to and from the Southeast Freeway), DC-295, 11th Street between G and O, M Street, the SE Freeway near the 8th Street ramp, and other locations. See the entire list for specifics; the closures are taking place so that contractors can "conduct drainage inspection work, utility locating, barrier installation, equipment relocation, striping, sign work and various other construction activities."
Comments (0)
More posts: 11th Street Bridges
 
159 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 16
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.