Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 11th Street Bridges
See JDLand's 11th Street Bridges Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


159 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 16
Search JDLand Blog Posts by Date or Category

January's Hill Rag is now online, with a number of articles on Near Southeast-related issues (most of which I've covered here in recent weeks). There's a big piece on Tommy Wells' Performance Parking Pilot Plan, though it was written before yesterday's official introduction of the legislation. Their Loose Lips-type anonymous columnist "The Nose" also talks about the parking plan, dubbing Tommy Wells "The Pimp of Parking." (Lovely.) There's also a piece spelling out the Capitol Hill Restoration Society's objections to DDOT's plans to renovate the 11th Street Bridges. And there's a wrapup of the December ANC 6D meeting, where representatives of the Nationals pledged much cooperation with the neighborhood and the ANC voted to support the ballpark's liquor license (I wrote about this meeting here).
Comments (0)
More posts: 11th Street Bridges, Alcohol/Liquor Licenses, ANC News, parking, Nationals Park
 

This morning's quick hits:
* The Voice of the Hill has posted a piece on its web site surveying the community reaction to the 11th Street Bridges EIS, while the December issue of the Hill Rag looks at the project from the perspective of Hill East.
* The Hill Rag also has a recap of the November ANC 6D meeting, which focused mainly on Southwest issues, though there is a small blurb about the ballpark liquor license (it sounds like there were some concerns about the 8 am to 3 am time frame listed on the application).
* Meanwhile, the December Southwester reports on the Oct. 3 groundbreaking at The Yards by reprinting much of the Forest City press release on the project.
* Out of my realm, but I'll still pass along that the four short-listed development teams will be presenting their proposals for Poplar Point at Dec. 12 at 6:30 pm at Birney Elementary School, 2501 Martin Luther King, Jr., Ave., SE.
* I'm watching with interest a public space permit application this week by Cofeld LLC for 1271 First Street, which is the lot on the northwest corner of First and N, which had a raze permit filed for it in June. Hints of demolition? We'll see if the permit data, when approved, tell us anything further.
* UPDATE: One more quickie to add. The Garfield Park-Canal Park Connector Project has posted notes and summaries of discussions at their Oct. 24 workshop. Topic areas discussed included Biking and Walking, Under the Freeway, Public Art, Urban landscape, and History & Neighborhood Heritage.
 

A few quick items not earth-shattering enough for their own entries:
* The Post reports that there is a group trying to launch a "Congressional Bowl" college football bowl game, where one of the teams would be a service academy, and which would be played at either RFK or Nationals Park. The NCAA should give its answer in May of 2008.
* In a story mentioning the problems being encountered by cities trying to sell municipal bonds because of the "credit crunch" mentions that DC's "A" rating means it is probably going to have to pay a higher interest rate on a $350 million bond issuance next month that will fund, among other things, the rebuilding of the 11th Street Bridges, though the city locked into a low interest rate on the $355 million bond issued last year for the ballpark.
* None of the 24 DC schools proposed for closure in the mayor's plan are in Near Southeast (Van Ness Elementary School closed in 2006), but I'll note that Southwest's Bowen Elementary is on the list, which brings to mind the continued wrangling over the fate of the move of the MPD First District police station off its current location in Southwest to allow for the construction of the new consolidated crime lab. At various times this fall, there has been discussion about 1D moving to a school building in Southwest (after plans to move them to the Post Plant at 225 Virginia Ave. SE fell through) and perhaps Bowen's closure clears the way for this. UPDATE: Oops, I missed that Phil Mendelson is quoted about the Bowen closing in today's Washington Times, wondering whether Bowen was picked to be closed because it needs to be, or because the city wants to put MPD there. (Though I remember hearing talk of either Bowen or Amidon as possible closures long before the MPD question.)
* My Ballpark and Beyond column this week talks about the opening of 400 M (Capper Building #2), the rash of stolen cars, and the ballpark liquor license application.
* One more addition: The DC Sports and Entertainment Commission is asking the city council for more money, says the Post, because its budget will suffer thanks to the move of the Nats from RFK to South Capitol Street, thanks to the loss of the $2 million a year that the Nats were paying to the DCSEC for renting RFK. The team will pay $5.5 million in rent at the new ballpark, but that money will go toward paying off the construction bonds.
 

I just can't bear to go completely dark for too many days in a row, so here's some light reading for your post-turkey haze:
* These are almost a month old now (oops), but the Hill Rag has an opinion piece on the plans for the 11th Street Bridges, plus an article on the community concern on Capitol Hill and in Southwest over the planning for ballpark parking.
* Today's Washington Business Journal looks at the plans for the return of streetcars to DC, a very long-term project that could eventually have light rail running down M Street SE and across both the 11th Street and Douglass bridges. But that's a loooong ways off--first they have to finally get a long-delayed test line in Anacostia off the ground, and then the H Street NE corridor would be next. There used to be a good web site on the project at DCTransitFuture.com, but that site is now hijacked with a fake blog, so the best I can give you is this DDOT page with a few links.
* There's also a WBJ article on PNC Bank securing the naming rights to the Diamond-level seats (the second priciest) and the club lounge at the ballpark. Still no word on naming rights for the stadium itself, though a few weeks ago we heard that there might not be a sponsor during the inaugural season.
 

If you're wanting to comment either positively or negatively on the Final Environmental Impact Statement for the 11th Street Bridges (which has identified a "preferred alternative" for a new design for the bridges and their interchanges) tomorrow (Nov. 20) is the deadline to do so, though you'd better use fax or e-mail at this point.
More posts: 11th Street Bridges
 

Here's my in-depth learned summary of today's city council hearing on proposed bridge projects in the city, about 98 percent of which focused on the future plans for the 11th Street Bridges:
* Some people are against it.
* Some people are for it.
The three-hour hearing should be posted soon on the Channel 13 On Demand lineup for this week, if you want to see for yourself the specifics. But really, it all boils down to arguments over capacity, over whether local streets will see a reduction in cut-through commuter traffic, and differences between Capitol Hill residents and advocacy groups and east-of-the-river residents and advocacy groups, none of whom spoke with any sort of uniform voice.
And since no one spoke about any of the preferred design's impacts on Near Southeast specifically (of which there are a few, mainly the revamped interchanges at 11th and M), I'll just leave it to others to go into more detail.
UPDATE: The Capitol Hill Restoration Society was concerned enough about the plans for the 11th Street Bridges that it hired its own traffic consultant--that report is now posted on the CHRS web site. Plus, DG-rad of And Now, Anacostia attended the hearing and has posted some notes, along with this link to slides DDOT presented about the project at this week's ANC 6B meeting, showing lots of graphics and numbers that were the source of much contention at the hearing.
More posts: 11th Street Bridges, ANC News, Traffic Issues
 

Apologies for the late notice, but tonight ANC 6D is having an "presentation meeting", to break out the issues that people and organizations want to bring in front of the ANC but which don't require an official vote. This is an attempt to shorten the monthly business meetings, which can run for hours and kill numerous brain cells of all in attendance. The meeting will be at 25 N Street, SW, at either 7:00 or 7:30 pm (now confirmed). Items on tonight's agenda include WASA talking about lead pipe replacement in the neighborhood and an update on Arena Stage construction and schedule.
There's also going to be a presentation by a group called the Coalition of Concerned Citizens of Eastern Washington, who are raising questions about the various road and bridge projects planned along the Anacostia and who have been contacting city officials over the past few months requesting that a new "traffic mobility study" be undertaken. (Here's their flyer and a copy of a letter to Mayor Fenty they sent back in August.) I imagine this group will also be interested in the Nov. 16 hearing before the City Council's Committee on Public Works and the Environment on "Major Bridge Construction Projects in the District".
More posts: 11th Street Bridges, ANC News, Traffic Issues
 

I don't normally do this, but I've got a bunch of pretty small items, so I'll just run them together:
* There's finally a small piece in the big media about the plans to redo the 11th Street Bridges, from WTOP. Nothing new, except that DDOT hopes to begin the construction in 2009, contingent on that pesky little thing called federal funding.
* Monday's kick-off ceremony for the Capitol Riverfront BID is making its debut on DC Cable 16 tomorrow (Saturday), at 3 pm, with additional showings on Monday, Wednesday, and Friday also at 3 pm. If you don't have cable, you can watch its feed via streaming video.
* I've now posted Monument's 90-second animation of what the east side of Half Street will look like when finished. If it goes by too fast (or if you can't get it to work), you can see the stills I took from it on my Monument Half Street page. There's no sound, and in order to make it small enough to download in less than 12 hours, the quality is lower than the crystal clear original. But you'll get the idea.
* You may notice that the map at right on my homepage has acquired a bunch of new stars. Showing that razor-like sharpness I'm known for, I took just under five years to figure out that I could display projects on the map even if I didn't have enough room for them under the "selected projects" lists at left. But at least the stars are color-coded! Just hover your mouse over them, and you'll get the descriptions. And don't forget that you can also click on the tabs above the map to get to the directory of all completed, under construction, and in-the-pipeline projects. Now I just need to work on freshening up some of the neglected interior pages of the site; I'll do it during all that spare time I have.
More posts: 11th Street Bridges, Capitol Riverfront BID, Monument Valley/Half St.
 

I need to correct an error I made in my Oct. 5 post (which carried over to my Post column on Oct. 11) about the 11th Street Bridges Final Environmental Impact Statement. I incorrectly said that the total number of lanes in the preferred alternative design chosen for the bridges (12) would be unchanged from the current configuration, having misread the EIS wording that referred to the number of freeway lanes being unchanged. The two spans currently have eight freeway lanes; the new configuration, quoting from the EIS (page 5-13), will be "a new eightlane freeway bridge along the alignment of the existing 11th Street Bridge as well as a new, local four-lane bridge crossing on the current alignment of the Officer Welsh bridge." (The "Officer Welsh Bridge" is the official name of the downstream span and "11th Street Bridge" the official name of the upstream span of what is commonly referred to together as the "11th Street Bridges.")
I regret the error, and have docked my pay and put a warning in my file. If I do it again, I will fire myself and look to replace myself with a new me that I can trust.
More posts: 11th Street Bridges
 

With DDOT having put out a press release in the past few hours alerting the media to the release of the Final Environmental Impact Statement for the 11th Street Bridges, I can breathe a sigh of relief that I didn't screw up by having it be the focal point of my Ballpark and Beyond column in today's District Extra. (It's easy to worry that you've done something wrong when news of a $465 million reconfiguration of one of the region's most important commuter routes hasn't been picked up by anyone else. Nice scoop for me, though!) No graphic went along with the column, though, so look at the images I posted here on Monday to understand the design alternative that's been chosen. Next steps would apparently be the actual design, although the EIS process took care of a lot of that, followed by construction.
My column also included the quick blurb about the bids being solicited to build the three temporary surface parking lots at Capper/Carrollsburg.
UPDATED to include link to press release.
More posts: 11th Street Bridges, Capper
 
159 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 16
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.