peek >>
Near Southeast DC Past News Items: 11th Street Bridges
See JDLand's 11th Street Bridges Project Page
for Photos, History, and Details
In the Pipeline
1244 South Capitol
Virginia Ave. Tunnel
New Douglass Bridge
Yards/Parcel O
JBG/Akridge/Half St.
Ex-Monument/Half St.
Chiller Site Condos
Yards/Parcel A
Yards/Icon Theater
DC Water HQ
1333 M St.
Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
Congressional Square
1000 South Capitol
SC1100
Completed
Southeast Blvd. ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
Posts on Food/Fun
Retail News
Restaurants/Nightlife
 
Go to Full Blog Archive


158 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 16
Search JDLand Blog Posts by Date or Category

Monday's DC Examiner reports: "The Transportation Planning Board added more than $1 billion in projects for the District to the region's long-range transportation plan, according to officials. The stratagem, called the Constrained Long Range Plan, estimates about $4.5 billion will be available each year for the next 24 years to complete projects in Maryland, Virginia and the District. Projects can only be added to the board's long range plan if there is a solid funding mechanism in place. " Three of the DC projects will impact Near Southeast: the rehabilitation of South Capitol Street including transformation of the street into an at-grade boulvard from I Street to N Street and the construction of a new Frederick Douglass Bridge (costing $625 million and completed in 2015); the reconfiguration and reconstruction of the 11th Street Bridges (costing $377 million and completed in 2011); and $3 million for the Anacostia Streetcar Study, which would run light rail across the 11th Street Bridges from Anacostia down M Street SE to South Capitol Street. (The first phase of actual construction of the Streetcar Project has been added to the CLRP as well.) Here's an explanation of the CLRP as well as the Transportation Improvement Plan, which describes the schedule for federal funds obligated to state and local projects.
More posts: 11th Street Bridges, South Capitol St., Douglass Bridge, streetcars, Traffic Issues
 

Public comment has now closed on the 11th Street Bridges Draft Environmental Impact Statement; the Sierra Club has posted it's comments submitted to DDOT about the project (hat tip to Richard Layman). And the September Hill Rag has an article about the Anacostia Community Boathouse Association's attempt to save the boathouse buildings nestled between the two bridge spans. (See also my August 10 entry on this issue.)

More posts: 11th Street Bridges, Boathouse Row
 

The hot-off-the-presses Aug. 10 Voice of the Hill (PDF) has a front-page report about the efforts to save the 106-year-old Anacostia Community Boathouse, under threat because of the pending changes to the 11th Street Bridges. The boathouse is one of the two red-brick buildings that are on the Anacostia River shore, right in between the two bridge spans (the second building, which is not in danger of being demolished, was recently the recipient of a $300,000 grant from DDOT to help its renovation). The 11th Street Bridges Environmental Impact Study, currently underway, has ID'ed four different build options for the bridges (to better link them to the Anacostia Freeway), and three of those options impact the boathouse. Public comment on the EIS is being accepted until Aug. 28. UPDATE: Oops, should have included this link to the Anacostia Community Boathouse Association "Save the Boathouse" page.
More posts: 11th Street Bridges, Boathouse Row
 

Don't forget, the two public hearings on the 11th Street Bridges Draft Environmental Impact Statement are Wednesday and Thursday night--Wednesday's is at 1105 New Jersey Ave., SE (St. Matthew's Baptist Church), and Thursday's is at 2041 Martin Luther King Jr. Ave. (Anacostia Professional Building). Both are from 6:30 to 8:30 pm. UPDATE: Here are the meeting packet, opening presentation, and display posters for the two meetings. And the entire Draft EIS is available, too. UPDATE II: Having just now really been able to take a look at these materials, I highly suggest taking a few minutes to look at the display posters. They do a great job of showing the four different build alternatives currently under consideration for the bridges, how they would impact both sides of the river, and more. Whichever one they choose, being able to have access to northbound I-295 from the SE Freeway (and vice versa), without having to go across Pennsylvania Avenue and make that left turn, has to be considered a vast improvement.
More posts: 11th Street Bridges
 

Voice of the Hill reports that ANC 6B "voted unanimously July 11 to support preliminary plans for a project that would connect the Southeast Freeway with the Anacostia Freeway." This is the 11th Street Bridges project, which "would allow southbound motorists on the Anacostia Freeway to access the 11th Street Bridges and motorists on the bridges to go north on the freeway, thereby creating a link between the Anacostia and Southeast freeways." There are public hearings on July 26 and 27 on the project's draft environmental impact statement, and public comment is being accepted until August 28.
More posts: 11th Street Bridges, ANC News, Traffic Issues
 

The 11th Street Bridges Draft Environmental Impact Statement (EIS) has been released. Two public meetings have been scheduled, on July 26 and 27; the comment period extends until August 28, 2006.
More posts: 11th Street Bridges
 

It hasn't been posted on their web site yet, but the agenda for Tuesday's ANC 6D meeting has a couple Near Southeast-related items: recommendations by Development Committee on Closing Of Public Alleys In Square 743N, a presentation by the DC Preservation League on a possible Historic Designation of Navy Yard Car Barn, i.e., the "Blue Castle" (the case is coming before the DC Historic Preservation Review Board on March 23); and a presentation of the 11th Street Bridges study. It's at 7 pm Tuesday, at 65 I Street SW. UPDATE: I've been told that additional items have been added, both of which are Near Southeast-related: a request for support by the Van Ness Elementary principal to keep the school open (I've heard in the past that it would be closing, but that it would be temporary, maybe things have changed?), and an update from the DC Sports and Entertainment Commission about the new baseball stadium. Also, here are the minutes from the February meeting.
More posts: 11th Street Bridges, ANC News, Blue Castle, Square 743N
 

The South Capitol Street Environmental Impact Statement project has posted its Winter 2006 newsletter with the latest updates on the study. Two build alternatives have been identified and are briefly described--the less costly one would keep the South Capitol and M intersection in two levels, and would create a "traditional" intersection at Potomac Avenue. The second and more wide-ranging alternative would reconstruct South Capitol and M to be "at-grade", and would create a traffic circle interchange at Potomac Avenue (there are differences in the two plans for east side of the bridge as well). The various plans (the two build alternatives, plus a "Transportation System Management" alternative and a No-Build alternative) will be presented at public meetings later this winter, then there will be ANC meetings, environmental analyses, and finally the preparation of the draft EIS. In the meantime, DDOT will be discussing this project as part of its Feb. 25 Open House. Also, both the South Capitol Street EIS and the 11th Street Bridges EIS teams will present their pedestrian and bicycle concepts to a meeting of the Bicycle Advisory Council on March 8. See my South Capitol Street and South Capitol Street Bridge pages for more details, photos, links, etc.
More posts: 11th Street Bridges, South Capitol St., Douglass Bridge, Traffic Issues
 

DDOT and the Anacostia Coordinating Council are holding an "Anacostia Transportation and Development Projects Information Fair," on Saturday Feb. 25 from 9 am to 2 pm, at 2616 MLK Ave., SE. It will be providing details on the plans for the Anacostia area, which include 11th Street and South Capitol Street Bridges, the Anacostia Waterfront projects and Poplar Point, as well as other projects that aren't in my Near Southeast purview. There will be bus tours of the sites, and food will be provided. Pre-registration encouraged but not required.
More posts: 11th Street Bridges, South Capitol St., Douglass Bridge
 

The 11th Street Bridges Environmental Impact Statement project has released its January 2006 newsletter, with a summary of the issues raised during the December public meetings. Another public meeting is expected in spring, with the EIS scheduled to be delivered in summer 2006.
More posts: 11th Street Bridges
 
158 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 16
Search JDLand Blog Posts by Date or Category