Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 1111 New Jersey/Insignia on M
See JDLand's 1111 New Jersey/Insignia on M Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


70 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7

Having gotten out of the way the vertical construction going on behind neighborhood fences, we can now move on to the "clearing" portion of this fence survey.
The roof of Nats Parking Garage C gives a great view of Yards Parcel A, and how far the site clearing has come along since the final days of Spooky Building 213.
Next up will be the creation of a park on the far end of the site, a parking lot in the corner closest to this intersection, and the new home for Trapeze School New York at far right. (Here's a map if that's too many words.)

Meanwhile, along New Jersey Avenue....
(Left) This isn't my best work, but you can compare the rubble in this photo to the lush grass-covered hill that used to run along New Jersey Avenue between L and M. All this dirt is being moved to build the 324-unit Gallery at Capitol Riverfront residential building, aka 1111 New Jersey Avenue.
(Right) Up in Whole Foods land at 800 New Jersey Avenue, the hole is still being dug. But the new block of H Street between New Jersey and 2nd is looking like a real street, though no doubt it will continue to taunt us by remaining closed throughout the construction of 800 NJ, like its sibling I Street a block to the south has sat unopened, waiting for the Park Chelsea construction to finish.

Next, do you like construction trailers? How about construction trailers on sites where work isn't yet underway?
(Left) Here's the Capper Community Center site at 5th and K, where a ceremonial groundbreaking a few weeks back was not quite enough to jolt the project into action.
(Right) Looking down upon the vast Florida Rock footprint from the ballpark, and noting the new construction trailer visible at the far end. As I mentioned a few days ago, there's not as yet been an announcement of construction financing for the planned first-phase 350-unit apartment building, nor are the initial necessary building permits approved.
Comments (2)
More posts: 1111 New Jersey/Insignia on M, Agora/Whole Foods, Community Center, Florida Rock, photos, Parcel A/Yards
 

Some additional progress updates, in convenient illustrated form. (click to enlarge)
First, a before and after of St. Matthew's, may it rest in peace. (More before-and-after photos here.)
Next, the progress on the Whole Foods at 800 New Jersey. At this point, it's just progress on the big hole in the ground, but still worth seeing. Note that the near part of this hole is actually not part of the 800 NJ footprint, but WC Smith is digging the garage that will be beneath the as-yet-not-unveiled third building on the block. (Whole Foods visitors will park in a two-story garage above the store, not in the basement with residents.)
And then I'll give you a peek inside the red brick Building 170 behind USDOT (left), where the 5x5 art project has one of its installations. And at right is the not-yet-open expansion of the parking lot at Half and I on Square 696. Good timing for the playoffs!
Comments (2)
More posts: 1111 New Jersey/Insignia on M, Agora/Whole Foods, photos
 

I have not yet seen it with my own eyes, but photographic evidence points to demolition now being underway on St. Matthew's church on the southwest corner of New Jersey and L.
When finished (and it doesn't look like it's going to take long), the church will be the neighborhood's Demolished Building #172 since I started watching back in 2003.
This is a step on the path to construction of Donohoe's 1111 New Jersey apartment building, which should truly commence Any Minute Now.
Comments (2)
More posts: 1111 New Jersey/Insignia on M, stmatthews
 

These are all items I had hoped to write about more fully, but at this point I'd better just pass them along.
* FLORIDA ROCK: MRP Realty is now in control of the land at the Florida Rock site that will become the 350-unit apartment building that is the first phase of RiverFront on the Anacostia. A $65 million loan is expected to be finalized soon, and the developers say that the project will "commence construction by late summer 2014." (WBJ)
* BEVY OF PERMITS: If you browse the teeny type in the right margin of the JDLand home page, you'll already know that building permits have been approved in the past few weeks for the apartment projects at 1111 New Jersey and 1331 4th Street (aka Parcel N at the Yards, aka Arris). A tenant layout permit has also been approved for CBS Radio's first-floor performance studio at 1015 Half Street. Also, fresh off its zoning approvals, developers of the Homewood Suites at 50 M have filed for shoring/sheeting/excavation permits.
* LATEST ON 1333 M: Late last year plans were filed with the Zoning Commission for a three-building, 673-unit residential project on M Street east of the 11th Street Bridges. After some delay, a Dec. 1 hearing date has been set, and WBJ takes a look at recent filings, including some new renderings.
* THE YARDS, ONE PIECE AT A TIME: "Rather than purchase all 42 acres up front, Forest City buys each parcel from the General Services Administration as it is ready to build. The latest: The $28.37 million acquisition of 1331 Fourth St. SE, site of the 327-unit Arris apartment project." Total land costs so far across the Yards? $46 million. (WBJ)
* TUNNEL LATEST: With a council hearing about the project coming on Aug. 26, the Federal Highway Administration has postponed its final decision on the Virginia Avenue Tunnel until at least Sept. 15. But the delay is affecting residents and businesses. (WaPo)
* SCHOOL BOUNDARIES: The planned reopening of Van Ness Elementary next year passes another milestone, as its boundaries get included in the city's revamped map, released earlier this week. The final boundaries cross into Southwest south of M Street, shifting some students over to Van Ness from Amidon-Bowen, "to better align school building capacity with population and with boundary participation rates, and to support racial/ethnic and socioeconomic diversity, where possible." (WaPo)
 

Today's batch of approved building permits includes a raze permit for St. Matthew's Church at 1105 New Jersey Ave.
It closed a few months ago, and was bought earlier this year by Donohoe, and will be torn down so that its footprint can be part of the new 1111 New Jersey Avenue residential building expected to get underway soon. (It's this project that is the reason for the scaffolding around the east entrance to the Navy Yard-Ballpark Metro station.)
The project's shoring/sheeting/excavation permit was also issued last week, so the bureaucratic wheels are definitely turning.
(I will eventually start calling it the Gallery at Capitol Riverfront, but give me a little while on that.)
LATE-DAY UPDATE: Look for the razing of the church to begin in the next couple of weeks.
Also, after getting enough questions about it, I'll post confirmation that Ann's Beauty and Wigs is not part of the 1111 footprint, and so will continue to provide for the neighborhood's cosmetic needs.
Comments (2)
More posts: 1111 New Jersey/Insignia on M, stmatthews
 

Readers have reported--and Donohoe has confirmed--that the company is beginning to put up scaffolding to erect "overhead protection" around the canopy on top of the Metro entrance at New Jersey and M. And within the next couple of weeks, demolition is expected to begin at St. Matthew's Church on the north end of the block, at L Street.
This is in preparation for what the company "hopes" is a start date later this summer for its 324-unit residential building at 1111 New Jersey (I'm not quite ready to call it "The Gallery at Capitol Riverfront" just yet).
Note that the building will not be directly on top of the Metro station, as 55 M is over at the west entrance. But the big concrete retaining walls and small hill of grass will go away, and the new building will be right at street level.
If 1111 does in fact get underway (my caution is well earned!), it will join the now-lengthy lineup of under-construction residential projects in the few years: Twelve12, Park Chelsea, River Parc, Parcel N, the Lofts at Capitol Quarter, and 800 New Jersey (which should be getting started Any Minute Now, and did in fact get its excavation permit last week). Including 1111 NJ and 800 NJ, that makes about 2,100 new units in the active pipeline. (And maybe 320 more if Grosvenor gets the residential and hotel part of Ballpark Square off the ground this year like it seems to be planning.)
That's a lot of new neighbors....
Comments (17)
More posts: 1111 New Jersey/Insignia on M, Development News
 

Finally, the weather and the calendar cooperated, and I spent Saturday taking a slew of photos around the neighborhood. To whit:
* HAMPTON INN: I can report that dirt is indeed being moved (if not necessary removed) from the site of the Hampton Inn on the northwest corner of 1st and N. This is the L-shaped hotel that will wrap around a planned two-story retail building right on the corner (which is not yet under construction). But, in case you weren't around pre-2008 and want to know what this hotel is "displacing," I give to you a peek at the hotel's N Street and 1st Street frontages in their previous lives:
* YARDS/PARCEL N: Men in hard hats operating heavy equipment are now found on most of the block where Forest City's next residential project is planned, south of Tingey and west of 4th. The new photos aren't really all that interesting other than as another tick on the historical timeline, so how about a shot of what the Parcel N lot looked like in 2004 (right), before any of the work on The Yards began.
* PARC/PARK: Toll Brothers's River Parc apartment building at 1st and K is almost topped out (below left). A couple blocks away, WC Smith's Park Chelsea has reached the halfway point of its vertical construction (below right).
* ST. MATTHEWS: While all sorts of newness is erupting around the neighborhood, there is one farewell worth noting, as St. Matthew's Baptist Church as New Jersey and L has left the neighborhood that had been its home since 1905 and the building that had been its home since 1972. Compare how it looked in 2006 (left) to today (right):
This site is part of the footprint for Donohoe's 1111 New Jersey apartment building, and with a raze permit application filed, this corner will probably be emptied before too many months go by. The church has found temporary quarters in Ft. Washington as it looks for a new permanent home.
 

A looming snowstorm will always divert my attention, but before the flakes fly, here's a few tidbits:
* I was not there, but the developers of the Florida Rock site apparently told Monday's ANC 6D meeting that they are looking at a June start of construction for the project's first phase, a 350-unit residential building. However, no building permit applications have been filed yet, with one reason being the need for some curb cut approvals, which the ANC voted to support. So, We Shall See.
* SWill reports that a developer is in the planning stages for a 260-unit apartment building on South Capitol Street across from Nationals Park, just north of the Camden building that opened last year. There are older rowhomes on the north end of the block, some or all of which could be incorporated into the project in some way. However, this is technically outside of my boundaries, so other than snapping photos of what will come, I'll be leaving this to Will to cover.
* I feel like I've already mentioned this, but in case I haven't, a raze permit has been filed for St. Matthew's Baptist Church on the southwest corner of New Jersey and L, to make way for Donohoe's 1111 New Jersey residential project. UPDATE: And commenter Alan below adds the tidbit that the church's message board out front now says "Looking for our perfect home."
* Washingtonian had very good things to say about Osteria Morini, while the Post's Tom Sietsema waxes saltily on Agua 301.
Comments (7)
More posts: 1111 New Jersey/Insignia on M, agua301, Development News, Florida Rock, morini, South Capitol St., Square 743N
 

WBJ reported on Thursday that Donohoe has made its decision to switch the long-planned 1111 New Jersey office development to a 13-story, 324-unit residential building with 11,000 square feet of ground-floor retail and 213 underground parking spaces. It will be called the "Gallery at Capitol Riverfront."
Further, the construction contract has already been "awarded" (to, ahem, Donohoe Construction), and WBJ quotes a company official as saying the project will begin in the first quarter of 2014, with delivery in 2016.
The site, which is above the New Jersey Avenue portion of the Navy Yard-Ballpark subway station, also includes the land upon which sits the St. Matthews Baptist Church at New Jersey and L (seen at right), which Donohoe has apparently acquired. As you can see in the rendering, the building will sit right next to but will not contain the Metro station entrance (the way 55 M Street contains the west entrance at Half Street).
Donohoe bought most of the project's property back in 2005, then purchased the rest from WMATA.
If they do intend to get underway next year, that brings the total of new residential units expected in the neighborhood over the next two years to nearly 1,900, with Twelve12, River Parc, and the Park Chelsea already out of the ground and Yards/Parcel N, 800 New Jersey and now this Donohoe project in the lineup to start in 2014.
I think I might have to buy a new camera.
Comments (4)
More posts: 1111 New Jersey/Insignia on M, Development News, Square 743N
 

A press release from Donohoe posted on the Capitol Riverfront BID web site says that the development company is designing a 13-story, 310-unit apartment building on its 1111 New Jersey site, on top of the east entrance to the Navy Yard Metro station, and will be acquiring the St. Matthew's Baptist Church next door (seen in the photo at right).
An additional zoning approval is being sought in lieu of an outright change to the existing approvals for the long-planned 200,000-square-foot office building on the site, "to maintain flexibility as we evaluate options . . . for both office and residential uses."
The building, designed by WDG Architecture, would have a mix of studio, one-, and two-bedroom units, and approximately 9,000 square feet of retail, "almost" the same amount as the office building. There's an early rendering of what the new building could look like on the BID page. UPDATE: Donohoe passed along the image at left.
Donohoe bought the most of the site's land back in 2005, then purchased the remaining portion from WMATA. St. Matthew's has been close to being sold before, when Ruben Companies had a deal back in 2007 that never materialized. And Donohoe had been in discussions about acquiring the site before Ruben. What the acquisition of the church would mean if the office building is built is not clear (would the office building grow in size?).
If the apartment building does happen, it will be in line with other developers seeing the neighborhood as much more of a residential opportunity than when plans to revitalize the area first started being formulated. That and the fact that office leases are not very easy to come by these days.
Needless to say, no timeline at the present, beyond a trip through Zoning Land.
Comments (55)
More posts: 1111 New Jersey/Insignia on M, Development News, Square 743N
 
70 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7