Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 1111 New Jersey/Insignia on M
See JDLand's 1111 New Jersey/Insignia on M Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


70 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7

Last night the Zoning Commission heard the Capitol Gateway Overlay Review case for 1111 New Jersey, Donohoe's now 220,000-square-foot office building on the northwest corner of New Jersey and M. The Office of Planning report laid out how the project properly adheres to the requirements of the CG Overlay, and there was actually very little discussion by the commissioners of the building's design or landscape (save for a few questions about the width of the sidewalk on M Street, which is wider than what the CG Overlay calls for, because of various hardware for the Navy Yard Metro station below).
What took up the bulk of the discussion was whether the building's parking garage should be accessed via New Jersey Avenue or via the block's alley that runs north-south between L and M (which is shared with 100 M, Onyx, and whatever gets built on the St. Matthew's site). The original design had the garage driveway on New Jersey, but DDOT is asking that it be moved to the alley because of both a desire to not have curb cuts on a major state street like New Jersey and because the alley is an existing curb cut where pedestrians expect vehicular flow. But the commissioners were uniformly unhappy with the alley solution, given the narrowness of the alley (14 feet), the heavy amount of traffic there will be, and the very awkward garage entrance/exit that Donohoe has had to come up with in order to make the alley entry work. Donohoe didn't appear to be especially happy with the alley solution, either, but DDOT was pretty firm in their desire to have it there.
The record was left open, and DDOT and Donohoe said they would continue to work on the garage issue. A ruling on the overlay review could come at the March 11 Zoning Commission meeting.
Chairman Anthony Hood also briefly touched on ANC 6D's opposition to the project because of a lack of a community benefits package--Hood said that this project is not a PUD, and any desires to have amenities packages be part of CG Overlay reviews should have been dealt with when the Overlay was created, so the ANC's opposition was viewed as not germaine.
Comments (0)
More posts: 1111 New Jersey/Insignia on M, ANC News, Square 743N, zoning
 

On Thursday (Jan. 31) at 6:30 pm the Zoning Commission is having its Capitol Gateway Overlay review hearing for 1111 New Jersey Avenue, Donohoe's office building at the corner of New Jersey and M. As I've written before, this project has been expanded to include 220,000 square feet of office space with 5,700 square feet of ground-floor retail in a 130-foot-tall glass-facade building, and is now subject to a CG review because of acquiring some land from WMATA that fronts M Street. This was presented to the ANC two weeks ago, which did not support the project because of the lack of a community benefits package.
The Office of Planning is recommending that this project be approved by the Zoning Commission; you can see the OP report here, which lays out point-by-point how the project stands up against the various CG requirements. There's also a request for a zoning special exception to waive a rear yard requirement; the Board of Zoning Adjustment approved a similar waiver request back in May, but they're having to apply for the exception again because the building has grown in size since the BZA ruling, so there's now more building inside the rear yard area.
Comments (0)
More posts: 1111 New Jersey/Insignia on M, Metro/WMATA, Square 743N, zoning
 

This week's Ballpark and Beyond column is a shortened summary of last week's ANC 6D meeting; but here's the links to my more detailed reports on the what transpired at that meeting with 1111 New Jersey, an alley closing request by Monument Realty, and Florida Rock.
And, since it's been a busy week, you might have missed my 2008 State of the Hood, which rises above all the daily minutaie to look at what's happened in Near Southeast in the last 12 months and what's coming in 2008; if you're coming late to the party and are looking for an overview, take a few moments to browse it.
Comments (0)
More posts: 1111 New Jersey/Insignia on M, ANC News, Florida Rock, Monument Valley/Half St., Square 743N
 

(This is the first of three dispatches I'll be posting over the next few days from Monday's ANC 6D meeting. Can you feel the excitement building?)
The developers of the planned office building at 1111 New Jersey came looking for the ANC's support in advance of their Jan. 31 Capitol Gateway Overlay Review at the Zoning Commission. This project has been revised over the past few months after Donohoe was chosen by WMATA to acquire the 5,000-square-foot lot on top of the Navy Yard Metro's east entrance at New Jersey and M--by expanding 1111 New Jersey's footprint to this lot, which fronts M Street, the project became subject to a CG Overlay Review (boring tutorial here). While the WMATA land is being sold to Donohoe, this is in fact a joint development project with WMATA, who I imagine will receive a dollar or two over the coming years once the building is built and leased.
The new design was described by WDG Architecture as 220,000 square feet of office space with 5,700 square feet of ground-floor retail in a glass-facade building. While it uses a smidge of the WMATA land, the project will not be built on top of the station entrance as is happening with 55 M--the station canopy will remain, and a there will be a large public plaza at this "important corner", along with a 60-foot setback with a double line of trees stretching up New Jersey. (Non-obsessive observers might not remember that 1111 NJ's footprint does not include the site of St. Matthew's Church immediately to the north--that lot is being acquired by Ruben Companies for a rumored residential project, where no plans have yet been made, a Ruben rep tells me.)
Donohoe indicated that it plans to go for LEED certification for 1111, and mentioned that some of the ground-floor space would be designed with restaurant uses in mind, though the presenters said they remain aware of the requirements for community-oriented retail and preferred uses in the overlay area.
Beyond the LEED certification, retail, and public spaces, the developer offered no community benefits package to the ANC. Donohoe considers this project a matter of right that requires no additional benefits offerings, a stand which reopened the wounds from back in April when the earlier iteration of this project came before the ANC looking for support for a zoning special exception (and was voted down, though the BZA approved the waiver anyway).
The feelings of the commissioners hadn't changed in the intervening months, and they voted 5-0 not to support the project because of the lack of community benefits. (There was some procedural wrangling about the wording of the motion, but since the church where the ANC meetings are held is absolutely impossible to hear in, I didn't get the specifics--something about voting "not to support" versus voting "to oppose", I believe.)
No timeline for the start of construction was mentioned. Perhaps more information will be forthcoming at the Jan. 31 zoning hearing.
More ANC reports coming tomorrow--I'll have news of Monument Realty's plans for the BP Amoco site at South Capitol and N, followed by the latest in the Florida Rock saga. Stay tuned!
UPDATE: Donohoe was nice enough to pass along the rendering of the new design, which I've added to the top of my 1111 New Jersey page.
UPDATE II: Correcting a smidge of misinformation on the St. Matthew's site.
Comments (0)
More posts: 1111 New Jersey/Insignia on M, ANC News, St. Matthew's Church, Metro/WMATA, Square 743N, zoning
 

Having pledged to pace myself a bit better over the next three months so that I don't have to cover Opening Day from a padded room, I'll be posting the results of Monday night's ANC 6D and Zoning Commission meetings in drips and drabs over the next few days. So stay tuned, especially if you're interested in Florida Rock, or Diamond Teague Park, or Monument Realty's projects north of the ballpark, or 1111 New Jersey, or 250 M Street.
This of course means that all the local media outlets checking in at JDLand looking for leads and tips will have to wait too. (The information is all free, of course, but some small hat tip some day would be nice. Although I do enjoy being an assignment editor of sorts....)
Comments (0)
More posts: 1111 New Jersey/Insignia on M, ANC News, Florida Rock, Monument Valley/Half St., Square 743N, staddis, Teague Park
 

Agendas are out for two public meetings on Monday night (Jan. 14) that have Near Southeast items of interest:
*ANC 6D's agenda includes presentations and requests for support on the following: a new request for an alley closing on the southern end of the block bounded by Half, M, N, and South Capitol (B17-0552, "Closing of a Public Alley in Square 700"); the Capitol Gateway Overlay Review for 1111 New Jersey Ave., which will be at the Zoning Commission on Jan. 31; and new design/modified second-stage PUD for RiverFront on the Anacostia (Florida Rock), which is expected to go to the Zoning Commission in the next few months. The meeting is at St. Augustine's Church, 6th and M Streets, SW, at 7 pm.
* The Zoning Commission will hear requests for "minor modifications" to William C. Smith's 250 M Street project and Monument's Half Street project; alas, I haven't been able to find out what these modifications are. That meeting is at 6:30 pm at 441 Fourth St., NW, and is also available via live webcast.
I should also mention here that last night the Zoning Commission voted preliminary approval of a series of text and map amendments at the Yards, most of which are far too dull for even me to get into; read the hearing announcement if you want more details.
Comments (0)
 

While the main stories in the media coming out of today's WMATA board meetings will no doubt be the approval of fare increases, my focus was on other action items:
* Without discussion, the board voted to execute the sale announced back in June of the 5,612-sq-ft WMATA land at New Jersey and M to "NJA Associates" (aka Donohoe). For more detail, you can read my entry from last week about how this land fits in with Donohoe's plans for 1111 New Jersey Avenue.
* The board also approved the plan to build a new 114-bus garage at DC Village to replace the Southeastern Bus Garage at Half and M, contingent on not only a series of land transfers between the city and WMATA but also on the $69.25 million sale of the current bus garage site to Akridge, since the proceeds from that sale are necessary to both fund the new garage and the interim costs associated with continuing the old garage's functions until the new site is ready. Marion Barry spoke forcefully in support of the move, speaking not only of his constituents' strong support for building a new facility in Ward 8 but also that the current garage is "in the way of progress," situated as it is smack in the middle of the fledgling Ballpark District.
No timeframe for closing the current garage was discussed by the WMATA board, and it was only mentioned in passing that Monument Realty's litigation surrounding the sale of the old garage is still pending. WMATA employees who I've talked to at Half and M in recent days have said they were initially told the garage would be vacated this month, then were told it would be next month, and are now being told that there's no firm date planned.
If indeed WMATA is not planning to close the garage before Opening Day, it will need to come up with plans for moving their buses in and out of that space while dodging tens of thousands of pedestrians, or how they'll shut down the garage during game times. It would also mean that the garage's possible use as a temporary parking facility would be off the boards.
More posts: 1111 New Jersey/Insignia on M, West Half St., Metro/WMATA, Monument Valley/Half St., Square 743N, Nationals Park
 

Because I'm not always so successful in getting people to tell me the current status of various projects, I spend a lot of time pouring through documents hoping to get hints here or there, and within the past few days I've uncovered a few new ones. I sent out some e-mails asking for additional information, but those have gone unanswered (waaaaah!), so I'll just post what I've seen, and wait for the various bureaucratic processes to move along to get more information.
The developers of the planned office building at 1111 New Jersey Avenue are having a Capitol Gateway Overlay Review in front of the Zoning Commission on Jan. 31. This review is now required because Donohoe is buying the land on top of the Navy Yard Metro station east entrance, which means that the project's property now "fronts" M Street and must get a review by the Zoning Commission to make sure it follows the design and usage requirements laid out by the CG Overlay. I haven't seen any new renderings yet to know whether the building has grown from its original 146,000-sq-ft design (note: see UPDATE below). No mentions yet of when construction might start. Presumably this design will be presented to ANC 6D, at perhaps its January meeting.
And, in the Questions and Responses posted along with the Capper PILOT underwriters RFP, there's the following statements:
* 250 M Street, the 200,000-sq-ft office building by William C. Smith, "will commence construction on or about May 2008";
* 600 M Street, the 500,000-sq-ft office building by Forest City on the old Capper Seniors site, "is expected to commence construction in late 2009 or early 2010 -- Stage II PUD process with the District Zoning Commission has already commenced"; and
* 800 New Jersey/120 Canal, the planned 1.1-million-sq-ft mixed use project by William C. Smith on the land north of I between Second and New Jersey (known as Square 737), "will commence Stage II PUD upon transfer of District land in early 2008."
1111 NJ UPDATE: Amazingly, just a few hours later, another document popped up with additional information on 1111 New Jersey: it's for the Dec. 13 WMATA board meeting, a request to execute the sale announced back in June of the 5,612-sq-ft WMATA land at New Jersey and M to "NJA Associates" (aka Donohoe). And it describes the "new" 1111 NJ thusly (emphases mine):
"The Developer proposes to combine the WMATA property with an adjacent 16,406 sf developer-owned site and develop an office building with ground floor retail. Its current proposal to the District of Columbia Zoning Commission is for an approximately 211,000 sf building, a portion of which cantilevers over the WMATA property. At ground level, the proposal includes a wide plaza surrounding the Metro entrance, consistent with the Anacostia Waterfront Initiative Framework Plan. The Developer will make modifications to Metro facilities at its own cost and subject to WMATA approval. At present the modifications are expected to be limited to adjustments to the vent shaft and new paving in the plaza area. The existing entrance canopy will remain. The entrance will be protected during construction. The Developer has stated that it does not currently anticipate any need to close the entrance during construction."
WMATA is selling the land for $2.3 million plus an unnamed additional payment if the approved project is larger 206,000 square feet.
 

The Washington Business Journal print edition (online for subscribers only) writes today about news posted here on JDLand.com a week ago [JD waves to WBJ] about St. Matthew's Church signing a contract to sell its property at 1105 New Jersey Avenue to Ruben Companies. Nothing really new in the story--neither side would say the sales price, and Ruben says the type of development on the site remains "up in the air"--but it was mentioned that there was once a contract between the church and Donohoe (developers of 1111 New Jersey next door), but no price could ever be agreed on.
More posts: 1111 New Jersey/Insignia on M, St. Matthew's Church, Square 743N
 

A rumor that's been floating around for the past few weeks is apparently true--sources are telling me that the St. Matthew's Baptist Church, on the southwest corner of New Jersey and L, is being sold. The sale hasn't been finalized yet (though there is a contract), and there's no word on what the sale price is or when the church would vacate; they're now looking for property in Prince George's County where they can build a new church. The property is assessed at just under $4.5 million, though the person I talked to cited problems with parking for members of the congregation (and knowing that it's only going to get worse) as the reason for leaving, not some sort of big payday.
In a real surprise, my sources are indicating that it's not being sold to Donohoe, which has reportedly tried in the past to acquire the church property as part of its plans for 1111 New Jersey Avenue. Given this, I wonder if there are further moves in the works at this corner. And then there's the question of whether Ann's Beauty Supply and Wigs next door to the church will stand fast, having arrived on L Street not that long ago after having to leave Waterside Mall in Southwest.
UPDATE, 11/24: Hmmm, well, now I'm hearing a different it's-not-Donohoe name than what I heard/posted yesterday, from a different source, and so I'm deleting the original reference just to try to be safe. Perhaps we'll read about it in the papers eventually. Grrrr, I hate boo-boos!
UPDATE, 11/26: Oh, for crying out loud, I was right the first time. (In other words, I was wrong about being wrong.) Additional checking has confirmed that is indeed the Ruben Companies, owner of three of the four corners at South Capitol and L (including 1100 South Capitol) that is buying the church's property.
More posts: 1111 New Jersey/Insignia on M, St. Matthew's Church, New Jersey Ave., Square 743N
 
70 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7




                  © Copyright 2024 JD.