Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 1111 New Jersey/Insignia on M
See JDLand's 1111 New Jersey/Insignia on M Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


70 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7

If you wandered over here from today's Ballpark and Beyond column in the Post's District Extra, here are a few links you might want to follow for additional background: Capitol Hill Tower is the home of the dry cleaners that had the bad first day of business; my Capitol Quarter page has lots of photos and details on the mixed-income townhouse development replacing Capper/Carrollsburg that has generated so much camping activity; I've got plenty of recent exterior and interior photos of the Nationals ballpark and renderings of what it's supposed to look like when it finishes next spring; my 1111 New Jersey Ave. page has details on the Donohoe office building project that will now be expanded after their purchase of the Navy Yard Metro station east entrance; and my Upcoming Events Calendar has links for the pile of meetings and hearings scheduled for next week.

More posts: 1111 New Jersey/Insignia on M, Capper, Capitol Quarter, Capitol Hill Tower, Retail, Square 743N, Nationals Park
 

Without any discussion, the Metro board has voted unanimously to select NJA Associates (a subsidiary of Donohoe) to develop the Navy Yard subway station's east entrance at New Jersey and M; there will now be negotiations for the sale itself. You can read my Monday entry for more background on the plan, or visit my 1111 New Jersey Ave. page for information on Donohoe's planned office building right next to the station, which the company apparently plans to expand onto this additional land. You can also look at the WMATA documents on the plan, although they aren't ridiculously heavy on detail. Next steps? Waiting for word of the actual sale, and keeping an eye out for Donohoe's revised design, which will now have to go through a Capitol Gateway Overlay zoning review since the expanded lot would front on M Street.
More posts: 1111 New Jersey/Insignia on M, Metro/WMATA, Square 743N, zoning
 

WMATA's Planning, Development, and Real Estate subcommittee has recommended to the full board that NJA Associates LLC (a subsidiary of Donohoe) be picked to purchase and develop the 5,612-sq-ft east entrance of the Navy Yard Metro station at New Jersey and M. Donohoe already owns 16,406 sq ft directly adjoining this property, and has received zoning approvals for its plans to build the 1111 New Jersey Avenue office building on the site; however, they would apparently expand the building's design to 206,000 sq ft with the new land acquisition, or go up to as much as 220,000 sq ft if the Zoning Commmission approves. And since the building would front M Street with this expanded configuration, it would also need to go through a Capitol Gateway Overlay Review to make sure it conforms with the design requirements now expected of M Street buildings.
The full WMATA board will consider approval of the plan to begin negotiating this sale at this Thursday's meeting; you can see a rendering of Donohoe's pre-expansion design on my 1111 NJ page, and also feel free to look at the Joint Development Solicitation from last fall that started this process. (And, anticipating your questions: no, there's been no movement that I've heard or seen on the sale of the Chiller Plant site on the southwest corner of Half and L.)
UPDATE: Of course, the west side of the Navy Yard station is already getting developed and expanded, as work continues on 55 M Street, the office building that will fill the northern portion of Monument's Half Street development.
More posts: 1111 New Jersey/Insignia on M, Metro/WMATA, Square 743N, zoning
 

Today the Board of Zoning Adjustment heard an application by Donohoe to waive the rear-yard requirement for its planned 146,000-sq-ft office building at 1111 New Jersey. I don't want to get too far into the weeds of it all, but basically this rear "yard" requirement was actually applying to the airspace along the alley between L and M above the project's first floor (because by right the first floor can run right to the alley line). Donohoe's position was that, by allowing them to build to the rear property line on all floors, they could build an 11-story building with higher ceilings on the 1st floor (16 feet), making the space far more desirable to prospective retail tenants. If they were unable to use that airspace, they would instead build a 12-story building of the same square footage, but with only 12-ft ceilings on the 1st floor (and shorter ceiling heights on the other floors). Although ANC 6D opposed this application on the grounds that it lacked a community benefits package (which is not required in a "by-right" project), the BZA felt that the higher ceiling heights on the first floor that would be allowed by granting this special exception, and the resulting higher-quality retail prospects that could be drawn to the building, could be considered to benefit the community. And with the pastor of St. Matthew's Church (which sits directly to 1111's north) saying that he is in favor of the project, and with the Office of Planning, the Capitol Hill Historical Society, and the neighboring developments (100 M Street and Onyx on First both sit across the alley from 1111 New Jersey) supporting it as well, and with other required standards of the rules met (sufficient distance between 1111 and adjacent structures, sitelines sufficiently separated, and adequate off-street parking [114 spaces], loading docks, and delivery space), the BZA voted 5-0 to approve this application. I've been told that this project could begin construction this summer.
UPDATE: Actually, I now hear that the project may not start until closer to the end of 2007. I don't know for sure, but perhaps the schedule is also being impacted by an upcoming item on the WMATA Planning, Development and Real Estate subcommittee agenda for June 14: "Approval of Developer Selection and Term Sheet for the Navy Yard East Entrance", which is referring to a joint development solicitation proposal back in September 2006, looking to develop the 4,400 square feet owned by WMATA above the Navy Yard station entrance at New Jersey and M with some combination of a public plaza at ground level and development above it. So we shall see....
More posts: 1111 New Jersey/Insignia on M, Metro/WMATA, New Jersey Ave., Square 743N, zoning
 

Donohoe's planned 146,000-sq-ft office building at 1111 New Jersey Ave. (on the west side of New Jersey between L and M) takes a step forward tomorrow with a hearing in front of the Board of Zoning Adjustment--they're looking for a special exception for a waver of the rear yard requirement, which apparently would allow them to put up an 11-story building with higher ceilings as opposed to a 12-story building with lower ceilings if they have to keep the rear yard. ANC 6D voted in April to oppose this application, but more because the developers are not providing a community benefits package than any issues with the application itself. The hearing should be webcast, and I'd tell you what time it's scheduled for, but the Zoning Schedules and Agendas site has been down for three days now, so I can't look it up to confirm.
UPDATE: The BZA site is back, so I can tell you that the hearing is the third item on the agenda for the session that begins at 9:30 am.

More posts: 1111 New Jersey/Insignia on M, New Jersey Ave., Square 743N, zoning
 

Some very brief Near Southeast-related updates from two ANC meetings this week (I wasn't in attendance at either, so these are just quick summaries I received from Other Parties): At ANC 6D on Monday, the commissioners voted 3-2-2 to oppose a zoning special exception request (waiver of the rear yard requirement) for the planned office building at 1111 New Jersey Ave., the Donohoe project on the west side of New Jersey between L and M (on top of the eastern Navy Yard Metro station entrance); the Board of Zoning Adjustment hearing is on May 8. As always, the biggest sticking point appeared to be battle between the ANC's we-want-a-community-benefits-package-in-return-for-our-support stance and the developer's this-is-a-matter-of-right-project-we-don't-have-to-give-you-anything stance. (And you wonder why I avoid these meetings like the plague.)
Meanwhile, over at ANC 6B (which is in charge of the sliver of Near Southeast around 8th Street/Barracks Row), the process is beginning about the possibility of razing the abandoned beige apartment building on Potomac between 8th and 9th and replacing it with a new four-story building with ground-floor retail and two levels of underground parking (though this is still just in the conceptual phase and may not be the final plan). A raze permit has been applied for, but because this small section of Near Southeast is part of the Capitol Hill Historic District, the Historic Preservation Office will be involved in the process. More later, I'm sure.
More posts: 1111 New Jersey/Insignia on M, 816-20 Potomac, ANC News, 8th Street, Square 743N, zoning
 

Adding to the projects that look to be starting in 2007, it appears that the 1111 New Jersey Avenue office building being developed by Donohoe is moving forward--they've recently applied for a zoning special exception ("for a waiver of the rear yard requirement"), which has been added to the Bureau of Zoning Adjustment's May 8 agenda. This is slated to be a 146,000-sq-ft, 12-story project with ground-floor retail, and I've heard tell that they're planning a mid-2007 start date. It will be on the land between the Navy Yard Metro station entrance at New Jersey and M and St. Matthew's Baptist Church at L Street (St. Matthew's is not being demolished)--and no, it won't be built up on the grassy hill, they'll dig down to street level! This will make the third project underway on what is known as Square 743N, along with the 100 M Street office building and the Onyx on First residential tower on the other side of the block, along 1st Street.

More posts: 100 M, 1111 New Jersey/Insignia on M, St. Matthew's Church, Onyx, Square 743N, zoning
 

WMATA has released a Joint Development Solicitation for two sites in Near Southeast--the eastern entrance to the Navy Yard subway station at New Jersey and M, and the chiller plant on the southwest corner of Half and L. The sites would be offered for long-term leases, with the goal being Transit-Oriented Development: "safe, walkable, mixed-use communities that emphasize transit connections and reduce auto dependency." The 4.400-sq-ft New Jersey and M site is interesting because it butts up against Donohoe's planned 1111 New Jersey Avenue office building, and the JDS states: "The Anacostia Waterfront Corporation has indicated a preference for the ground floor area around WMATAs eastern entrance to be an attractive public plaza, complimenting the new development in the area. In this case, development on the parcel would largely occur above the street level." I'm not sure how you create an attractive public plaza that has development above it.... I'm guessing that Donohoe will be quite interested in this land (and their rendering of 1111 NJ does indeed show a very nice plaza). As for the chiller site at Half and L, it's 14,100 square feet, with a 7,700-sq-ft privately owned strip right next to it that combined could allow for a 200,000-sq-ft development (just like 20 M Street just to its south). With two other parcels at the corner of Half and L ready to be developed (the Nation site and the Ron Cohen Square 699N project), I'd imagine this site will garner a fair amount of interest. Proposals are due to WMATA on Nov. 17.
More posts: 1111 New Jersey/Insignia on M, Chiller Site/WMATA, Metro/WMATA, mnorth, New Jersey Ave., Square 743N, square 698
 

Donohoe Real Estate Services has posted a new and more detailed rendering of their planned 146,000 sq ft office building at 1111 New Jersey Avenue. It shows St. Matthew's Baptist Church at New Jersey and L still standing, and also shows the project not using the air rights above the entrance to the Navy Yard Metro station at New Jersey and M. I don't know whether this is their final design or not, but it was far enough advanced in comparison to the earlier one that I bit the bullet and created a new tab on my Square 743N page for this project, now joining the project pages for its neighbors-to-be at 100 M Street and 1100 First Street. The Donohoe web site says only "Delivery 2008" for a timeframe, so construction could start anywhere between late 2006 and mid-2007.
More posts: 1111 New Jersey/Insignia on M, Square 743N
 

Donohoe appears to be continuing to move forward with its office project on New Jersey Ave., now christened 1111 New Jersey (just north of the Navy Yard Metro station at New Jersey and M). A page on the Donohoe Real Estate Services web site describes the project: 146,000 sq ft, 12 floors, designed by WDG (who've also designed a pile of other buildings in Near Southeast), and delivery in 2008 (which would mean that construction would need to start by early 2007). At this time, the project doesn't include the land still occupied by St. Matthew's Baptist Church at New Jersey & L--I've heard through the grapevine about negotiations over the past year or so, but apparently no deal has been reached. (I haven't yet created a page for this project, I'm waiting a bit to see if anything changes with the church.)

More posts: 1111 New Jersey/Insignia on M, St. Matthew's Church, New Jersey Ave., Square 743N
 
70 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7