Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 100 M
See JDLand's 100 M Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


94 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10

* The news about perhaps paying for the convention center by taking money from various in-the-pipeline projects around the city has generated a lot of comment, not only here but in the form of a letter from Monty Hoffman of PN Hoffman to Chairman Gray in which he said that moving funds away from the planned redevelopment of the Southwest Waterfront "would be a horrific business, legal, and community tragedy for the city." And SWDC Blog is reporting this morning that Kwame Brown says the list in the original WBJ article was of all tax-increment-financing plans approved by the City Council, which might be a wider list than just projects from which funds could be diverted.
* Roll Call has a piece on the "slow-to-develop" Capitol Riverfront neighborhood: "Today, visitors to the stadium emerge from the Metro onto an almost empty street flanked by tall fences. Billions of dollars of real estate is planned for the area, but for now, it only offers a few half-empty buildings and the occasional fast-food restaurant." But there is this as well: "The buildings aren't all empty. BID estimates that about 1,600 people live in the area, leasing about half of the available apartments. Office buildings hold about 35,000 workers; Opus East, for example, has leased 50 percent of the units for its new building at 100 M St. SE." (Full disclosure: I'm quoted a few times.)
* On the flip side, a just-released CBRE report on the impact of the federal stimulus package on the DC and Baltimore region says: "The commercial real estate industry has begun to see an impact from the transportation-related stimulus activities. Government contractors are actively touring office buildings in the Capitol Riverfront submarket of Washington, DC, home to the headquarters of the U.S. Department of Transportation, for new growth related to stimulus-funded contracts. These tours are noteworthy as the submarket has seen limited interest over the first six months of the year as a result of the national and local economic recessions." We're also still waiting to hear which federal agency might be about to lease 100,000-sq-ft of space at 20 M, and whether Booz Allen Hamilton is taking 30,000 sq ft at 55 M or elsewhere in the neighborhood.
* And, if you saw a boat full of partying real estate professionals cruising up the Anacostia on Tuesday, it was the Urban Land Institute Washington's annual boat tour, which took the Odyssey from the Southwest Waterfront up to the Yards and then back toward Rosslyn and Georgetown.
* The news of the day gave the Republicans some trouble in the bullpen at last night's Congressional Baseball Game at Nationals Park. And the GOP's woes in Washington continued, with the Democrats winning the game for the first time in eight years, 15-10.
* I forgot to post this last week: M.L. Clark Real Estate, which negotiated the deal for the city to sublet 225 Virginia Avenue, is going out of business, says WBJ, with its two brokers moving to Cassidy & Pinkard.
* A reminder that this Saturday from 11 am to 3 pm is the Third Annual Ward 6 Family Day.
 

[Note: I'm back in town after almost a week away (reminder to self: next year don't skip town the week before the home opener), so apologies if my coverage of the various events and media pieces has seemed even less scintillating than usual. And now I'm going to end the week with one more less-than-perfect entry, which I should have written before I left but didn't do it until now....]
If you haven't been back to Nationals Park or the surrounding Near Capitol Ballpark River Yards neighborhood since last year's Opening Day, here's what you'll see that wasn't completed on your last visit:
* 55 M Street - Right on top of the west entrance of the Navy Yard Metro station, at the head of Half Street, is Monument Realty's 275,000-sq-ft office building, which has been finished in the last few months and which will be home to Artomatic this summer. No office or retail tenants have been announced, although WBJ reported a few weeks back that Gordon Biersch may be eyeing some of 55 M's ground-floor space. The rest of Monument's Half Street site remains a large hole in the ground, with financing for the planned 350 residential units and adjoining hotel directly across from the ballpark nowhere to be found.
* 70 and 100 I Street - Sibling apartment buildings officially known as the Axiom and Jefferson at Capitol Yards first began move-ins in late summer 2008, and their combined 700 units are reported to be about 50 percent leased. (They're the big brick buildings sitting just south of the Freeway.)

* Onyx on First - Another apartment building (though it had been originally planned as condos), Onyx opened at the corner of First and L streets in late fall of 2008. It has approximately 266 units.

* 100 M Street - On the site of the old On Luck cafeteria at First and M, this 240,000-sq-ft office building opened right at the tail end of 2008, and is close to 40 percent leased, with Parsons occupying about one-third of the space. A SunTrust Bank branch is under construction on the ground floor--there's additional retail space where a restaurant could be a possibility, though no deals have been announced.

* 909 New Jersey - Finished mere moments ago (it opened last week), this 237-unit apartment building at New Jersey and I by JPI (developers of 70 and 100 I) is catching eyes with its blue-edged nighttime profile, and is generating piles of "have they signed anyone for their retail space?" messages in my inbox (answer: not that I've heard so far). Baseball fans walking down from Capitol South will also appreciate the wide new sidewalk now just one block south of the freeway.

As for what's currently underway, there's the first phase of townhouses at Capitol Quarter (where the first residents will move in this month and where work will continue into next year), the 200-unit Velocity condo building at First and L, and the 440,000-sq-ft office building at 1015 Half Street (which will be completed in 2010 but will already be cursed for obscuring the view of the Capitol dome from some seats in the ballpark that had it last year). There's also construction continuing at Diamond Teague Park, right across from the ballpark's grand staircase, but the somewhat optimistic timeline of having the water taxi piers completed by Opening Day has now been revised to "midseason."
Work had begun on rehabbing the brown-and-white Pattern/Joiner Shop at the Yards last year (which folks walking to the ballpark from the Nats Express drop-off will see), but financing problems brought the work to a halt early in 2009, and Forest City continues to look for money to restart the project.
The most prominent structure that's disappeared in the past 12 months is the former WMATA bus garage on Half Street just across from the subway entrance, demolished two weeks ago to make way for Akridge's planned 700,000-sq-ft mixed-use development, though that project won't get underway before 2010. (The south end of Akridge's Half Street land is where the [not-a-]beer garden may appear later this summer.)
But, as has been written about extensively elsewhere, as of now there's no new places to eat since last year (though a deli is coming to Third and K in May), and most likely no additional projects will get underway before next year.
So, study this little guide and amaze your friends with your knowledge of what's what as you look at the ballpark's surroundings.
 

It certainly doesn't feel like it's the case, so you might be surprised to find out that the District of Columbia thinks that Near Southeast is worth about $1.5 billion more than it was a year ago, at least in terms of the latest tax assessments now available. With a total assessment last year of around $4.5 billion for the blocks bounded by the SE Freeway, South Capitol Street, and the Anacostia River (to just west of the Sousa Bridge), this bump up edges the neighborhood's "worth" to just over $6 billion.
A chunk of that change is coming from the first official assessment of Nationals Park, valued at $999,982,800 (geez, Mr. Tax Assessor, just round it to $1 billion and be done with it), a rise of nearly $650 million from the assessed value of just the land last year. Blocks that saw projects get completed in 2008 (70/100 I, 100 M and Onyx, and 55 M) got hefty bumps in their valuations, while other spots (20 M, the Capper blocks, USDOT, Maritime Plaza) saw their assessments go down.
I created a report comparing 2008 and 2009's numbers overall and by block, though I wouldn't swear to the exactness of each number down to the penny (but they're probably close enough).
As for the trend of the overall valuation of Near Southeast over the past nine years, it's still *up*:
2001: $221,096,652
2002: $428,312,487
2003: $640,209,280
2004: $771,006,345
2005: $894,123,520
2006: $1,781,481,650
2007: $2,539,618,280
2008: $4,467,137,880
2009: $6,004,334,490
UPDATE: Here's a link to a map of the square numbers, in case a bit more visual assistance would be helpful.
 

While everyone continues to nervously eye the commercial real market, Opus East has continued to sign tenants at 100 M Street. In addition to Parsons (who signed for 30 percent of the building's space early on), deals have now been completed with Battelle's transportation group (about 6,000 sq ft) and NAVSEA contractors CDI Marine (6,000 sq ft) and Orbis (7,400 sq ft). This brings the building to about 43 percent leased, according to Opus, with contracts closed to be completed for another 8,000 sq ft.
As for retail, SunTrust is still planning to open a branch there (perhaps as early as this spring, but nothing's confirmed), and Opus continues to look for a restaurant (or restaurants) to fill the remaining 8,500-sq-ft of ground-floor retail space.
Comments (0)
More posts: 100 M, Retail, Square 743N
 

I don't dare tally up how many photos I've taken over the past 12 months, but suffice to say it's a lot. That didn't stop me from a quick lunchtime trek around the neighborhood to grab my final pictures of 2008, with a starkly blue sky as an end-of-year gift. Here's a boatload of before-and-afters for your perusal:
I started at Capitol Quarter, where the first three townhouses at Fourth and L are already framed, wrapped, and window'ed (I imagine the developers are trying to get those units finished as close to "on schedule" as possible). Here's the before-and-afters for the intersection's southwest corner; be advised that taking southward-facing photos in winter is no fun at all, so apologies for all glare, skipped angles, etc.

I next ventured to The Yards (USDOT security guards be damned!) for updated photos of the Foundry Lofts construction, where most of the framing of the two new top floors appears to be finished. And both Third and Tingey streets are now nicely paved and curbed, which you can see along with the Foundtry Lofts construction in these Third and Tingey photos, and also in shots from one block west, at what someday will be Second and Tingey. And, for the heck of it, here's a few new New Jersey and Tingey images. (Remember to look for the icon, as always.)
And, acting on tips from alert readers, I checked out the Third and K Market, which is now being gutted. There was no one around to answer any questions as to what is up, but seeing work getting done a few months after a For Rent sign went up (and quickly disappeared) would seem to be a good sign....?

I also went to First and M, where workers at 100 M have now given back one lane of M Street and told me that the median east of First will be rebuilt soon (as the one west of M recently was). The silver bullding against the unbelievably blue sky makes for a nice tableau in these updated photos.
There are also a few updated shots of 909 New Jersey, taken mainly from the First and I intersection, which is also notable for the nice little fence and landscaping that's now gone in across the empty lot to the east of 100 I, visible in many of these new photos.

Will that tide everyone over until the new year? I know I'm now good for a while....!
 

Today the Capitol Riverfront BID held its first annual meeting luncheon, on the seventh floor of the all-but-completed 100 M Street, showcasing great views of Nationals Park and of M Street (though the gray skies didn't make for good picture-taking). I didn't take copious notes, but here are a few items of note that I Twittered in between bites of chicken and a key lime tart for dessert:
* It's confirmed that Artomatic will be held in Near Southeast in May and June of 2009.
* The opening date for Diamond Teague Park continues to be set at March of '09. However, the BID's executive director said that Canal Park would be coming "in late 2010."
* The Capitol Riverfront area (which is a bit larger than my Near Southeast domain, since it also includes Buzzard Point) now has 1,100 residents.
Hopefully they'll be posting the spiffy Annual Report online, since it gives a lot of detail about development in the Capitol Riverfront area and the work that the BID does to promote and "brand" the neighborhood. (Though JDLand readers will be familiar with most of it already.) Best stat? The BID's Clean and Safe team members collected 3,600 bags of trash this year.
The keynote address was given by Greg Leisch of Delta Associates, and provided a flurry of statistics about the residential and commercial office space markets in DC compared to the rest of the country (in short: It Could Be Worse). Leisch said that he felt that the Capitol Riverfront area is well-positioned to benefit from the recovery that's expected to begin in late 2009/early 2010, in much the same way that the East End did after the 1990-91 recession and the Capitol Hill submarket did after the 2001-2002 recession. He also said that only about 1,600 new condos will have been sold across the Metro area in 2008. Ouch. You can see some of the stats from this presentation on the Delta web site.
UPDATE: From the BID, here's the Annual Report, and Greg Leisch's presentation.
 

Washington Business Journal passes along the latest on 100 M Street, Opus East's office building that's just about to open. Apparently the building is set to be purchased by Detroit-based MayfieldGentry Realty Advisors LLC on behalf of an unnamed fund they represent, though the financial climate is slowing down completion of the transaction. It's expected to be finalized in January.
Meanwhile, Parsons's transportation unit moves in January 1, occupying the top four floors (30 percent of the building's total square footage). Another 7,400 square feet has been leased by federal contractor Orbis Inc., and WBJ says that "Opus also has signed letters of intent with three more small tenants and has concluded final negotiations with them[...]. Those three leases will absorb an additional 20,000 square feet in the 240,000-square-foot building." SunTrust Bank is also still planning to occupy 3,600-sq-ft of ground-floor retail space.
Comments (0)
More posts: 100 M, Retail, Square 743N
 

With the city council now almost in its summer recess until mid-September (though not before David Catania introduced legislation yesterday trying to raise the sales tax at Nationals Park in what appears to be an attempt to get back at the Lerners for withholding the rent), and with the Zoning Commission and most ANCs taking August off, the pace of bureaucratic-type news in these parts will be slow if not nonexistent for the next few weeks. We've got a Metro board meeting next week that might (or might not) be telling us the developer of the Navy Yard station's 14,000-sq-ft chiller plant site on the southwest corner of Half and L, but otherwise the calendar is all but empty until after Labor Day. (At least I can report that on Monday night ANC 6D voted 7-0 to approve a public space permit by 100 M Street to install sidewalks and city arborist-recommended willow oak and elm trees.)
That said, I should have some interesting items in the next few days, including hopefully an update about everyone's favorite What's the Deal With....? subject. And of course I'll have photo updates every few weeks, especially since it's expected that framing of the first Capitol Quarter townhouses will get underway by early August. But beyond that, expect the pace around here to be more leisurely during the dog days. As it should be!
 

0807 Wyoming 635 Mount Rushmore 0807 Wyoming 490
I'm back from a week in Wyoming, Montana, and South Dakota, where I took all sorts of photos despite the fact that there were almost no buildings under construction. And what better way to get back in the blogging saddle than to post notice of Monday's ANC 6D meeting. The agenda has one Near Southeast item, which is a public space permit for 100 M Street (for trees, a driveway, and sidewalk paving). The rest of the agenda includes a presentation by the Office of Planning on a zoning study of Southwest, a resolution on the proposed moratorium on "singles" (alcohol, not unmarrieds), and admin minutiae in conjunction with some events planned in Southwest. The meeting starts at 7 pm, at St. Augustine's church at 6th and M Streets, SW. I'll be the one in the audience griping about not still being out west.
Comments (0)
More posts: 100 M, ANC News, Square 743N
 

There was a big pile of news this past week from Near Southeast, so I'll boil it down to bullet points and links in case you couldn't keep up:
* Construction is really about to begin on the first townhouses at Capitol Quarter, now that financing has been closed for the public housing units;
* The first phase of the waterfront park at The Yards got the thumbs up from the Zoning Commission, and is expected to be completed by summer 2009;
* Onyx on First will be opening its first five floors of apartments in late July or early August, and initial rents have been announced;
* 100 M will be substantially completed in November, and tenants should start moving into the office building early in 2009. SunTrust Bank is the first retail tenant, and the developer is looking for restaurants for the other spaces;
* The planned office building at 250 M got Zoning Commission approval for a modification to its design; and
* Street vendors will start popping up for ballgames north of M Street on Tuesday (June 3). You can see the map of where they'll be.
 
94 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10