Near Southeast DC: Past News Items
100 M
See
JDLand's
100 M
Project Page

for Photos, History,
and Details

Go to Full Blog Archive

 

87 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5

Big Photo Update - South and East Stadium Exteriors, and More
Oct 15, 2007 10:08 PM
I took advantage of great weather and an unplanned opening in my schedule to make a photo run through the Hood on Monday. The pictures that will probably be of most interest are of the east and south sides of the stadium exterior, which I've been unable to get shots of since First Street and Potomac Avenue were closed to traffic and pedestrians a number of weeks back. While the stadium itself doesn't look incredibly different on those sides (lots more window glass being installed, including in the areas along First Street slotted for retail), I did get a nice surprise when I found a new sidewalk already in place on the south side of Potomac Avenue east of South Capitol. But don't be expecting to get to "drive the ballpark circuit" again much before Opening Day--the infrastructure work on Potomac and on First (and eventually on I) is scheduled to continue through February. (I also want to plead my case that I've now lost a lot of my "guideposts" around the stadium that I used to line up my before and afters, so if you determine that new photos aren't 100 percent in the same location as the old ones--just remember, as usual, you get what you pay for here at JDLand.)
I also made it to Poplar Point with camera in hand for the first time in two months, and posted a few of those shots, with more to come in the next few days. And there's a lot of photos of 70/100 I, Onyx, and 100 M, although not the complete lineup that I usually post--I hope to get the rest, along with the north and west sides of the ballpark, this weekend. Onyx and 70 I appear to be within seconds of completing their top floors, with their siblings 100 I and 100 M not too far behind. And believe me, I can't wait for those four buildings to get their exteriors finished, so I can rest a bit! Of course, it'll be a short breather, since Monument's 55 M is now at ground level, and the concrete is being poured at the bottom of the Velocity Condos hole.
You can also see all the photos I posted from today on a single page, though it might be too much to digest in a single sitting.

New Batch of Photos, Pt. 1 - Scoreboard Stars and More
Sep 29, 2007 5:08 PM

The breadth of construction around Near Southeast is now so vast that I'm forced to break my photo sojourns up into multiple sessions. Today's batch includes a few from the eastern side of the stadium, which are somewhat hard to come by these days--make sure to see the second photo down on the Stadium Exterior Construction Gallery, which shows the red stars that were added to the scoreboard in the past few days as part of the installation of the clock. (The "Nationals" lettering is cool to see as well, even if it's backwards.) The rest of the new stadium photos are more toward the bottom of the gallery (look for the icon) and on the First Street and N Street expanded galleries, but I'm planning to take a complete batch of photos of the western side of the ballpark on Sunday.

There's also the usual updates to the project pages for residential projects 70/100 I and Onyx on First and the 100 M Street office building, as well as plenty of other vantage points that can be seen on the expanded galleries or on the see-'em-all-on-one-page output. Try not to be blinded by the incredibly blue sky when looking at these shots, and cross your fingers I get that weather again on Sunday.
I've also got one not-so-good comparison showing the slow progress on the demolition of the GPO building at The Yards, though fences and construction vehicles are making it very hard to get good shots of what's going on there.
I did also notice that the DC Foreign Car garage on K west of Half is definitely now abandoned, sometime within the past month or so. No "we've moved" sign is up anywhere, and so it's possible that it's been a number of weeks since they closed, but now all the windows and doors are busted, so it was obvious even to my sometimes-distracted brain. Opus East has said they're planning to start construction on 1015 Half Street in October, which would mean this garage should be gone before much longer.
Tune in tomorrow for the next batch.

New Photos: Stadium Exterior, Onyx, 100 M, 70/100 I
Sep 17, 2007 12:39 PM
I've posted a nearly full complement of construction update photos, taken on Sunday. There's new shots of the stadium's exterior from along South Capitol Street and N Street (read my miffed post from a week ago about why I'm not getting shots from First or Potomac these days), and the expanded photo stadium exterior archives along South Capitol and N Street are updated as well. I also shifted around the exterior construction gallery to get the more-likely-to-be-updated photos higher up on the page.
I also took the standard shots of the residential projects at 70/100 I Street and Onyx on First, as well as the 100 M Street office building, and also updated the expanded photo archives for each of those, if you can't get enough before-and-afters. Or, you can see all the new photos on one page.
(PS: I know the site is slow today. The tech support people are "working on it." Apologies....)
More posts: 100 M, 70/100 I, jpi, Onyx, Nationals Park

New Web Site for 100 M
Sep 10, 2007 11:47 AM
My attention to detail appears to be suffering a deficit lately, because while I've shot and posted plenty of photos of the 100 M Street site over the past few weeks, many of which included the spiffy artwork above the pedestrian walkway, I neglected to actually read the spiffy artwork above the pedestrian walkway. Displayed there for all (but me) to see is a new URL for the project, 100mse.com. It's not terribly exciting, just one page that then links to developer Opus East and to leasing agent CB Richard Ellis, but I was still remiss in not mentioning it sooner. Perhaps it's time for that new glasses prescription....
More posts: 100 M, Square 743N

One More New Batch of Overhead Photos
Sep 6, 2007 3:17 PM

Having decided that overhead views of Near Southeast from the ballpark and the Southeast Freeway over the past few days weren't enough, I've also now added a bunch of updated overheads from a vantage point at the Courtyard by Marriott, focusing on the many construction projects west of New Jersey Avenue. You can browse these new photos, or see the ones displayed with previous shots from the same location (scroll down a bit) to watch the changes since March of last year. (Hint: old buildings, followed by empty lots where old buildings used to be, followed by holes in the ground, followed by new buildings going up.)

Some Additional Photos, And a Note on Stadium Exterior Shots
Sep 3, 2007 5:27 PM
After getting all those purty stadium interior photos and shots of the surrounding skyline on Saturday, I ventured out Sunday morning to do my usual rounds, and so have posted some updated pictures of 100 M, 70/100 I, and Onyx, along with new shots from the Southeast Freeway showing how much that view is changing (again) as these projects progress. (Here's all the images from yesterday on one page, if you prefer.)
But when I started down First Street south of N to get my usual shots of the stadium's exterior, I was thwarted by guards informing me that access along First (and, by proxy, Potomac Avenue) is now restricted to construction vehicles and workers only. I protested somewhat vigorously--after all, there are still fences around the stadium on that side, and the signs say "Local Traffic Only" and not "Road Closed"--but I lost.
I'll still manage to get photos of the ballpark's south and east side eventually, and really at this point the eye-catching part of the construction on those sides is slowing, so a more leisurely schedule of updates of those pictures will not be catastrophic. (Plus I can always set up my zoom lens at Poplar Point and the Douglass Bridge. That'll show 'em!)
I did take this roadblock as an opportunity to rejigger my Stadium Exterior Construction Gallery page a bit, breaking up the old let's-walk-around-the-perimeter format by bringing the showier shots from all vantage points to the top. You'll see a few new photos from along N Street taken yesterday, but I was too cranky from my run-in with The Man to get new shots from South Capitol. Grrrr.
More posts: 100 M, 70/100 I, jpi, Onyx, Square 743N, Nationals Park

New Photos and News
Aug 27, 2007 7:19 PM
After a week of days that were either overcast and drizzly or ridiculously hot and humid, today's sunny-and-warm profile gave me no choice but to venture out for a reconaissance mission. My report:
The masses of workers and the well-positioned fences make it nearly impossible to take photos of the current state of South Capitol Street, but I have added a decent photo to my Douglass Bridge makeover page showing the new South Capitol and Potomac intersection, which appears very close to being ready for traffic. Streetlights are in place, curbs have been built, paving has begun, and the historic globe streetlamps are installed all along the length of the bridge.
I also snuck a peek into the huge hole where Monument Realty's Half Street project is underway, and from N Street you can see what appears to be vertical construction is already underway at the bottom of the hole. It's along the M Street portion of the site, which will be home to the 55 M Street office building, which itself will contain the expanded entrance to the Navy Yard Metro station. Because that Metro work must be completed by Opening Day 2008, I guess it shouldn't be surprising that they're already pouring concrete and working upward, eight months into construction. The office building itself and the rest of the Half Street Phase I won't be completed until 2009.
And I unexpectedly found Demolished Building entry #138, as the beige garage that has long sat on the northeast side of the Half and I Street intersection bit the dust today, which I'm sure JPI is happy to see, given that 70/100 I Street is growing like a weed right next door.
Speaking of 70/100 I, it got updated photos today, along with Onyx on First and 100 M Street. You can look at those project pages (and their accompanying expanded archives), or you can browse this page showing all photos I've posted from today, which includes a few new shots of Capper Building #2, which I believe is just minutes from opening. And I even finally added a photo of the "Starbucks Coming Soon" sign out in front of the DOT HQ, for the caffeine-deprived.

Lots of New Photos - Stadium, SouthCap, Onyx, Etc.
Aug 19, 2007 9:20 AM
With Saturday being one of those glorious clear days, I of course raced out with camera to make the rounds. 70/100 I, Onyx on First, and 100 M continue to rise, so the usual photos of those are now posted. The Stadium Construction Gallery is updated with views of the ballpark's northern and western vistas, which are changing markedly thanks to the work being done on the parking garages and on South Capitol Street in conjunction with the Douglass Bridge work.
And while you might think it's pretty much become rote for me to watch these changes, I must admit that when I scurried very briefly out into the middle of South Capitol Street at P Street to grab a shot or two, I was just about overcome by what it's all starting to look like. The holes are cut for the new South Capitol median, the curbs are being put in place for the new wider sidewalks, and the stadium's fake-limestone (I'm sorry, "precast concrete") exterior just pops in the late afternoon sun. Check my Douglass Bridge Extreme Makeover page photos that try to capture the new vista, along with a new Expanded Project Archive that I built if you can't get enough of looking at the before-and-afters of this stretch of road.
UPDATE: Oops, forgot to add the obligatory link to all the new photos on one page. There are also some additional here-and-there shots of spots that needed fresh photos.

Rainy Days: Good for Droughts and Naps, Bad for Construction Photography
Jul 29, 2007 6:19 PM
Yeeech. I managed to get out this morning before the rain started, and while there was a smidgen of sunlight at first, I've mainly got a bunch of gray, gray photos for you to look at. I updated the main Stadium Exterior Construction Gallery (and have added a few new angles), plus the north/south/east/west additional views for the diehards. New things to look for: the arched steel atop the scoreboard, the rounded steel marking the construction of the outfield restaurant, a lot more glass installed on the southwest side of the ballpark, and the ever-growing west parking garage. There's also now a big ole' trench dug down the middle of Potomac Ave. and rounding up onto First Street (two roads now completely closed south of N Street to anything but construction traffic). But with these photos being so dingy, if there wasn't something obviously new and different in the shot, I didn't update every angle on every page.
I also posted some shots of the Douglass Bridge extreme makeover, as work continues on the new ramp up from Potomac Avenue to the existing bridge. The rest the closed section of South Capitol Street doesn't look too different, although I did see that new sewer drains/curbs have started to be installed. (I also spied from the freeway a nice fresh layer of pavement on South Capitol heading into the underpass beneath M Street, but no pictures.)
And I also updated the Onyx on First and 70/100 I Street pages as both those projects now have an additional floor since last week. And 100 M looks to be getting close to coming out of the ground.
You can also just browse all of today's photos on a single page, and click the Click to see all available photos of this location. icon if you want to see older photos in the archive of a certain location.

More Pieces on Opus Buying the Nation Site
Jul 20, 2007 9:48 AM
Two more pieces about Opus East's purchase last week of the Nation site at 1015 Half Street; the Washington Business Journal today has a pretty straightforward brief, while yesterday's Washington Times has a longer piece that also discusses the Near Southeast commercial real estate market. (But there's one small quibble with the second sentence of this piece: "Although office buildings are nothing new for Opus East, building one on speculation in Southeast is unusual" is kinda sorta forgetting about Opus's 100 M Street project a mere two blocks away.)
Of course, when you read these (and the others), don't forget who first brought you the news about the sale, back on Monday.

1015 Half to be Green; 100 M on the Market
Jul 18, 2007 10:22 AM
GlobeSt.com has a piece (free for seven days) on Opus East's purchase of the Nation site at 1015 Half Street--not really anything new from what I posted on Monday (441,000 sq ft, construction starting in October, $41.5 million price tag) except that the developers will apply for LEED Silver certification on the project (i.e., it'll be a "green" building). But mainly I'm using this new article as a hook to mention that Opus has put its 100 M Street building on the market as part of a three-building Class A office building portfolio (see Grubb and Ellis's listings here, which include this portfolio.) From what I understand, Opus would stay on as developer until the certificate of occupancy on 100 M is obtained. Looks like the deadline for offers is tomorrow, so get your checkbooks out.

Commercial Real Estate News in Near Southeast
Jun 22, 2007 1:03 PM

Today's print edition of the Washington Business Journal has an article summing up what's going on right now with various commercial projects around Near Southeast. (The online article is for subscribers only for the first 30 days; sorry.) Here are the new items:

* William C. Smith is planning to hold off breaking ground on its 200,000-sq-ft building at 250 M Street until it pre-leases at least 30% of the building.
* Opus East has leased 80,000 sq ft at 100 M Street (33% of the building) to government contractor Parsons Corp.
* Lerner's 20 M Street does not as yet have any office tenants.
* It also mentions that Opus East is planning to build the 440,000-sq-ft office building at 1015 Half Street (the old Nation site) on spec; but it should be noted that Opus hasn't yet officially announced its purchase of this property or its plans.
(The article also summarizes what's going on at Florida Rock, using some source materials that are hard to find anywhere other than here at JDLand. Note to reporters and other professionals using my site: yup, lots of stuff is posted here, and it's all free, but be a grownup and say where you found it.)
In addition, there's an ad in the print edition giving us our first peek at the Shalom Baranes design for 1100 South Capitol Street, Ruben Companies's planned 350,000 sq ft office building on the southeast corner of South Capitol and L. There's currently no timeline for development of this project.
The print edition also has a piece written by GSA about the US Department of Transportation completing its move to its new headquarters at New Jersey and M. It describes the HQ's interiors and exteriors, and mentions that this project is the largest lease ever executed in DC.

All Sorts of New Overhead Photos Posted
May 24, 2007 10:46 PM
What a beautiful day! And with that weather, what luck that I had arranged some trips high up into a few of the tall buildings around the neighborhood to get new shots of the latest demolished lots and holes in the ground. I've uploaded these new pictures From Above and matched them with "before" shots on a whole slew of pages (you might have to scroll a bit to see the new pictures): Nation/1015 Half, the old Edge/Wet block on Square 699N, the North of M overview page, the Monument Half Street page (that's a biiiiig hole in the ground), the 100 M/Onyx on First page (where the construction on the Onyx end of the block is getting close to street level), 70/100 I Street, 909 New Jersey (showing the A1 garage all alone) and even the Stadium Construction Gallery (waaaaaay at the bottom, with a view from just a bit to the side of Dead Center Field, albeit four blocks away). I also created a new Overhead Photos page, showing all the ones I've posted on the site, grouped together by location. And I also created a special view with larger-than-usual pictures from today (don't miss it!), because it was so beautiful and you really could see forever from those high-up locations, and I wanted people to be able to see more than just little specks of buildings.

Another New Development North of M?
May 5, 2007 4:00 PM
Today I saw for the first time new signs hung on the fence surrounding the firewood lot on the southwest corner of 1st and I Streets, emblazoned with "DRI Development/Office and Retail" (or some such). I have absolutely no information on this--this lot has been owned for quite some time by the Potomac Development Corporation, but I don't see any records as of yet in the online public records to indicate a sale has taken place, so perhaps it's a joint venture. Or not. I don't know. Anyway, I'll try to see what I can find out (whispers in my ear always welcome!), and hopefully some light can be shed on perhaps ANOTHER project getting started in the North of M section of Near Southeast, to go along with JPI's two residential towers, ADC Builders' Square 699N, Faison's Onyx on First condos, and Opus East's 100 M office building (and maybe the Nation site, too?), and perhaps something on the Sunoco lot by Monument Realty.

Photo Updates - Stadium Shots and More
Mar 31, 2007 7:55 PM

I gave you inside-the-ballpark photos on Monday, and today there's a new set of exterior shots of the Nationals baseball stadium (note that I've now separated the interior and exterior stadium photo galleries into separate tabs). Remember that clicking on the Click to see all available photos of this location. icon will show you all uploaded photos of that angle, not just the oldest and newest (so you can watch the stadium construction change in two-week intervals). I also "freshened" the Photo Archive's database of photos at all the intersections around the perimeter of the stadium, giving you additional viewpoints not shown in the Construction Gallery: check out 1st Steet at N, N Place, O, and Potomac; Half Street at N and Potomac; and South Capitol Street at N, O, P, and Potomac. (You can also browse the archive by map to pick and choose locations.)

I also did what is probably the final major photo update for 20 M Street, and updated some other intersections as well--Half and M, Cushing and M (both of which are part of the Monument Half Street footprint); Cushing and L; and 1st and M and 1st and L, home of the construction sites for 100 M Street and Onyx on First, which each got updated as well, although the pictures aren't particularly exciting (still just a big hole in the ground). Or you could just look at all the photos I took today, then click on the intersection link if you want to see previous photos.
And now, I must go watch my Gators.

Firms Starting to Look at Near Southeast
Mar 30, 2007 9:14 AM
From today's print edition of the Washington Business Journal: "CNN and a couple of law firms are sampling the wares in Southeast DC by taking tours of new office buildings cropping up around the new baseball stadium. No leases have been signed yet, but the buzz of these high-profile tenants looking at Southeast as an option is quite a victory for a neighborhood formerly known as an industrial zone crawling with seediness and crime. [...] Also, rents in Southeast are expected to be around $40 per square foot for full service, $20 to $30 cheaper than new or renovated buildings in the Central Business District." Of course, right now, "tours of new office buildings" means 20 M Street, the only new office building currently completed and with plenty of space to lease. But by 2009 there will also be 100 M, 55 M, and probably 250 M and 1111 New Jersey. And maybe a couple more, depending on what happens within the next few months at Square 699N, Square 697 (Nation), and the Willco site at 83 M. (The article fudges a bit by mentioning 1.8 million square feet of office space was under construction in Near Southeast back in December, but, well, 1.35 million of that was the DOT HQ.) UPDATE: Added the link to the story, since WBJ was nice enough to bring it out from behind the pay wall.

New Signs, Fences, and Cranes
Mar 29, 2007 1:10 PM
Goings on about town.... Earlier this week the construction crane arrived at the Onyx on First/100 M Street construction site, signaling the beginning of the end of the digging-down phase and the start of the building-up phase. (Though these two projects are being developed by different companies, they are being built concurrently--that's synergy, and cost savings!) Two blocks over, a big sign has gone up at 2nd and M advertising Washington Canal Park--the graphic on the sign is the same one I found a few weeks back in the Capitol Riverfront BID executive summary. And, today, fences have been erected around Square 699N, the entire block bounded by Half, K, L, and 1st, the former home to Wet/Edge and various other small businesses. Permits appear to be in place for demolition and excavation, so with the fences up I'd expect something to start happening soon--now if only the Cohen Companies would tell us WHAT! You can see a few new shots on my Square 699N and Canal Park pages, or here in the Photo Archive all at once. UPDATE: I should add that, back in September 2005 when Ron Cohen purchased Square 699N, it was reported that the block would be developed with 650 condos, a hotel with condos, a stand-alone 250,000 sq ft office building, and retail. But there's been little reporting since on his plans.
More posts: 100 M, Canal Park, Onyx, Square 743N, Square 699n

Zoning News
Mar 27, 2007 8:45 AM

A few items of Near Southeast interest were on last night's Zoning Commission agenda. First, the commission unanimously approved the modification to the Capper/Carrollsburg PUD to change the makeup of Capper Seniors #2 (now nearly completed at 4th and M) from all units for low-income seniors to add some workforce-level (30-60% median income) units as well. Seniors will have first preference, followed by former Capper/Carrollsburg residents who meet the income requirements; because there are no one-bedroom units in the public housing portion of Capitol Quarter, making this switch at Capper Seniors #2 means that former residents in need of a one-bedroom have the chance to move back this year, instead of waiting for 2011 when the multifamily mixed-income buildings get built along 2nd Street. In return for this modification, the developers agreed to amendments recommended by the Office of Planning that additional shared parking spaces be created within three blocks of the building, and that two ride-sharing cars be located at Capper/Carrollsburg (also within three blocks of Seniors #2). So, look for more news in the coming weeks on the "Ballpark Apartments".

The commission also unanimously approved a modification to the office building at 100 M Street that needed to be undertaken because their sidewalk along 1st Street is being narrowed thanks to a decision by DDOT to widen 1st Street north of M to allow for two traffic lanes, two parking lanes, and a bike lane. The commissioners were not happy with DDOT's move, lamenting that the ZC's attempts to create walkable communities with vibrant ground-floor retail and outdoor seating space can get thwarted by a DDOT decision like this one. But the commissioners also agreed that the 100 M developers shouldn't be penalized for DDOT's mischief.
There was supposed to be a final vote on the Capitol Gateway Overlay Review for 1325 South Capitol, the new residential building across from the Nationals ballpark, but that has been deferred to the commission's April 9 public meeting.

Zoning Commission and Capper Seniors #2; Other Zoning Items
Mar 16, 2007 3:11 PM
The Zoning Commission has deferred until its March 26 Special Public Meeting any decision on whether to allow Capper Seniors #2 to be redesignated as a mutlifamily workforce (30%-60% annual median income) dwelling in addition to having its low-income senior citizens units. ZC chair Carol Mitten noted a bit of a disconnect between statements offered by the DC Housing Authority and the Office of Planning, and so both are to meet before March 26 to formulate a recommendation.
The March 26 special meeting will also have the ZC's final vote on the 1325 South Capitol Street residential project, and also the "minor modification" being requested at 100 M Street.
And, since I gave the Office of Zoning a bit of a hammering a few weeks back when they debuted their new online calendar, it's only fair that I now rave over the return of monthly at-a-glance lists for Zoning Commission and BZA meetings, which make finding out what's happening far far easier. Thanks, guys, not only is it great to see this functionality back, but you did a really nice job with it, too.

ANC 6D Monthly Meeting
Mar 12, 2007 7:51 AM
The draft agenda for the March 12 ANC 6D meeting has been sent out (although not posted on their web site as yet, alas), and there are a few Near Southeast items of interest: discussion and vote on an construction agreement (presumably between the developers and the neighborhood/ANC) for 1325 South Capitol Street (the 276-unit residential project across from the ballpark); a presentation on modifications being requested in front of the Zoning Commission to the plans for the office building at 100 M Street (I don't know any details, will post when I find out); and a presentation on streetscapes at the The Yards/Southeast Federal Center (ooooh, more hints of moving forward!). There's also a meeting on the planned Monument Realty project on the Randall School site at Half and I Streets SW (blissfully outside of my purview). The meeting is at St. Augustine's Church at 6th and M Streets, SW at 7 pm.
UPDATE: The 100 M Street change is quite minor, according to Opus East, a result of actual construction drawings evolving from the original design drawings. I also hear tell that First Street is going to be widened at some point by DDOT, which means that 100 M and Onyx on First won't have a wide/deep sidewalk along as originally thought. (I don't have any details on the First Street work.)
UPDATE II: The ANC 6D report in the new issue of the Hill Rag has more details on the 1325 South Cap construction agreement as discussed at the February meeting, though I don't know whether it's changed or not going into tonight's meeting. It also says the project has 276 units, not 244 as I've been reporting.
87 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5



Near Southeast DC Home Page
Top of Page | RSS Feed | Contact JD
Advertise on JDLand.com

© Copyright 2014 JD.
All photos © Copyright JD unless otherwise marked - See information on photo uses, licensing and purchasing.

  
More JDLand.com/Near SE DC:
JDLand Home Page
Contact JD | About
Advertise on JDLand
E-Mail Updates
Near SE Development Map
Live Transit Info
Upcoming Events
Knight-Batten Award
Photo and Blog Archives
Browse/Search Photos
Photo Galleries
Demolished Buildings
Photos from Rooftops
JD's Favorite Photos
Blog Archive, '03 - Present
Tag Cloud
Underway
  
Nationals Park
Food Options Map
Parking Lots Map
Other Transportation Info
In the Pipeline
 
Completed
Lumber Shed ('13)
Boilermaker Shops ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 NJ Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Dem. ('07)
400 M ('07)
SoCap Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Rearview Mirror
Rearview Blog Posts
Demolished Buildings
Historic Photos & Maps
Past Events Timeline
On the Hill, '59-'69
From Above, '49-'08
Gas Prices Gallery
Posts on Food/Fun
Retail News
Restaurants/Nightlife
Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Ave.
M Street
South Capitol St.
North of M
The Yards
Lower 8th Street
East M Street
Boathouse Row
Guides/Maps
Project Directory
Stadium Corridor
M Street
New Jersey Ave.
Near Southeast Datasets
Recent Data
Crime Incidents
Public Space Permits
Building Permits