Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 100 M
See JDLand's 100 M Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


94 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10

Two more pieces about Opus East's purchase last week of the Nation site at 1015 Half Street; the Washington Business Journal today has a pretty straightforward brief, while yesterday's Washington Times has a longer piece that also discusses the Near Southeast commercial real estate market. (But there's one small quibble with the second sentence of this piece: "Although office buildings are nothing new for Opus East, building one on speculation in Southeast is unusual" is kinda sorta forgetting about Opus's 100 M Street project a mere two blocks away.)
Of course, when you read these (and the others), don't forget who first brought you the news about the sale, back on Monday.
 

GlobeSt.com has a piece (free for seven days) on Opus East's purchase of the Nation site at 1015 Half Street--not really anything new from what I posted on Monday (441,000 sq ft, construction starting in October, $41.5 million price tag) except that the developers will apply for LEED Silver certification on the project (i.e., it'll be a "green" building). But mainly I'm using this new article as a hook to mention that Opus has put its 100 M Street building on the market as part of a three-building Class A office building portfolio (see Grubb and Ellis's listings here, which include this portfolio.) From what I understand, Opus would stay on as developer until the certificate of occupancy on 100 M is obtained. Looks like the deadline for offers is tomorrow, so get your checkbooks out.
 

Today's print edition of the Washington Business Journal has an article summing up what's going on right now with various commercial projects around Near Southeast. (The online article is for subscribers only for the first 30 days; sorry.) Here are the new items:
* William C. Smith is planning to hold off breaking ground on its 200,000-sq-ft building at 250 M Street until it pre-leases at least 30% of the building.
* Opus East has leased 80,000 sq ft at 100 M Street (33% of the building) to government contractor Parsons Corp.
* Lerner's 20 M Street does not as yet have any office tenants.
* It also mentions that Opus East is planning to build the 440,000-sq-ft office building at 1015 Half Street (the old Nation site) on spec; but it should be noted that Opus hasn't yet officially announced its purchase of this property or its plans.
(The article also summarizes what's going on at Florida Rock, using some source materials that are hard to find anywhere other than here at JDLand. Note to reporters and other professionals using my site: yup, lots of stuff is posted here, and it's all free, but be a grownup and say where you found it.)
In addition, there's an ad in the print edition giving us our first peek at the Shalom Baranes design for 1100 South Capitol Street, Ruben Companies's planned 350,000 sq ft office building on the southeast corner of South Capitol and L. There's currently no timeline for development of this project.
The print edition also has a piece written by GSA about the US Department of Transportation completing its move to its new headquarters at New Jersey and M. It describes the HQ's interiors and exteriors, and mentions that this project is the largest lease ever executed in DC.

 

What a beautiful day! And with that weather, what luck that I had arranged some trips high up into a few of the tall buildings around the neighborhood to get new shots of the latest demolished lots and holes in the ground. I've uploaded these new pictures From Above and matched them with "before" shots on a whole slew of pages (you might have to scroll a bit to see the new pictures): Nation/1015 Half, the old Edge/Wet block on Square 699N, the North of M overview page, the Monument Half Street page (that's a biiiiig hole in the ground), the 100 M/Onyx on First page (where the construction on the Onyx end of the block is getting close to street level), 70/100 I Street, 909 New Jersey (showing the A1 garage all alone) and even the Stadium Construction Gallery (waaaaaay at the bottom, with a view from just a bit to the side of Dead Center Field, albeit four blocks away). I also created a new Overhead Photos page, showing all the ones I've posted on the site, grouped together by location. And I also created a special view with larger-than-usual pictures from today (don't miss it!), because it was so beautiful and you really could see forever from those high-up locations, and I wanted people to be able to see more than just little specks of buildings.
 

Today I saw for the first time new signs hung on the fence surrounding the firewood lot on the southwest corner of 1st and I Streets, emblazoned with "DRI Development/Office and Retail" (or some such). I have absolutely no information on this--this lot has been owned for quite some time by the Potomac Development Corporation, but I don't see any records as of yet in the online public records to indicate a sale has taken place, so perhaps it's a joint venture. Or not. I don't know. Anyway, I'll try to see what I can find out (whispers in my ear always welcome!), and hopefully some light can be shed on perhaps ANOTHER project getting started in the North of M section of Near Southeast, to go along with JPI's two residential towers, ADC Builders' Square 699N, Faison's Onyx on First condos, and Opus East's 100 M office building (and maybe the Nation site, too?), and perhaps something on the Sunoco lot by Monument Realty.
 

I gave you inside-the-ballpark photos on Monday, and today there's a new set of exterior shots of the Nationals baseball stadium (note that I've now separated the interior and exterior stadium photo galleries into separate tabs). Remember that clicking on the Click to see all available photos of this location. icon will show you all uploaded photos of that angle, not just the oldest and newest (so you can watch the stadium construction change in two-week intervals). I also "freshened" the Photo Archive's database of photos at all the intersections around the perimeter of the stadium, giving you additional viewpoints not shown in the Construction Gallery: check out 1st Steet at N, N Place, O, and Potomac; Half Street at N and Potomac; and South Capitol Street at N, O, P, and Potomac. (You can also browse the archive by map to pick and choose locations.)
I also did what is probably the final major photo update for 20 M Street, and updated some other intersections as well--Half and M, Cushing and M (both of which are part of the Monument Half Street footprint); Cushing and L; and 1st and M and 1st and L, home of the construction sites for 100 M Street and Onyx on First, which each got updated as well, although the pictures aren't particularly exciting (still just a big hole in the ground). Or you could just look at all the photos I took today, then click on the intersection link if you want to see previous photos.
And now, I must go watch my Gators.

 

From today's print edition of the Washington Business Journal: "CNN and a couple of law firms are sampling the wares in Southeast DC by taking tours of new office buildings cropping up around the new baseball stadium. No leases have been signed yet, but the buzz of these high-profile tenants looking at Southeast as an option is quite a victory for a neighborhood formerly known as an industrial zone crawling with seediness and crime. [...] Also, rents in Southeast are expected to be around $40 per square foot for full service, $20 to $30 cheaper than new or renovated buildings in the Central Business District." Of course, right now, "tours of new office buildings" means 20 M Street, the only new office building currently completed and with plenty of space to lease. But by 2009 there will also be 100 M, 55 M, and probably 250 M and 1111 New Jersey. And maybe a couple more, depending on what happens within the next few months at Square 699N, Square 697 (Nation), and the Willco site at 83 M. (The article fudges a bit by mentioning 1.8 million square feet of office space was under construction in Near Southeast back in December, but, well, 1.35 million of that was the DOT HQ.) UPDATE: Added the link to the story, since WBJ was nice enough to bring it out from behind the pay wall.
 

Goings on about town.... Earlier this week the construction crane arrived at the Onyx on First/100 M Street construction site, signaling the beginning of the end of the digging-down phase and the start of the building-up phase. (Though these two projects are being developed by different companies, they are being built concurrently--that's synergy, and cost savings!) Two blocks over, a big sign has gone up at 2nd and M advertising Washington Canal Park--the graphic on the sign is the same one I found a few weeks back in the Capitol Riverfront BID executive summary. And, today, fences have been erected around Square 699N, the entire block bounded by Half, K, L, and 1st, the former home to Wet/Edge and various other small businesses. Permits appear to be in place for demolition and excavation, so with the fences up I'd expect something to start happening soon--now if only the Cohen Companies would tell us WHAT! You can see a few new shots on my Square 699N and Canal Park pages, or here in the Photo Archive all at once. UPDATE: I should add that, back in September 2005 when Ron Cohen purchased Square 699N, it was reported that the block would be developed with 650 condos, a hotel with condos, a stand-alone 250,000 sq ft office building, and retail. But there's been little reporting since on his plans.
 

A few items of Near Southeast interest were on last night's Zoning Commission agenda. First, the commission unanimously approved the modification to the Capper/Carrollsburg PUD to change the makeup of Capper Seniors #2 (now nearly completed at 4th and M) from all units for low-income seniors to add some workforce-level (30-60% median income) units as well. Seniors will have first preference, followed by former Capper/Carrollsburg residents who meet the income requirements; because there are no one-bedroom units in the public housing portion of Capitol Quarter, making this switch at Capper Seniors #2 means that former residents in need of a one-bedroom have the chance to move back this year, instead of waiting for 2011 when the multifamily mixed-income buildings get built along 2nd Street. In return for this modification, the developers agreed to amendments recommended by the Office of Planning that additional shared parking spaces be created within three blocks of the building, and that two ride-sharing cars be located at Capper/Carrollsburg (also within three blocks of Seniors #2). So, look for more news in the coming weeks on the "Ballpark Apartments".
The commission also unanimously approved a modification to the office building at 100 M Street that needed to be undertaken because their sidewalk along 1st Street is being narrowed thanks to a decision by DDOT to widen 1st Street north of M to allow for two traffic lanes, two parking lanes, and a bike lane. The commissioners were not happy with DDOT's move, lamenting that the ZC's attempts to create walkable communities with vibrant ground-floor retail and outdoor seating space can get thwarted by a DDOT decision like this one. But the commissioners also agreed that the 100 M developers shouldn't be penalized for DDOT's mischief.
There was supposed to be a final vote on the Capitol Gateway Overlay Review for 1325 South Capitol, the new residential building across from the Nationals ballpark, but that has been deferred to the commission's April 9 public meeting.

 

The Zoning Commission has deferred until its March 26 Special Public Meeting any decision on whether to allow Capper Seniors #2 to be redesignated as a mutlifamily workforce (30%-60% annual median income) dwelling in addition to having its low-income senior citizens units. ZC chair Carol Mitten noted a bit of a disconnect between statements offered by the DC Housing Authority and the Office of Planning, and so both are to meet before March 26 to formulate a recommendation.
The March 26 special meeting will also have the ZC's final vote on the 1325 South Capitol Street residential project, and also the "minor modification" being requested at 100 M Street.
And, since I gave the Office of Zoning a bit of a hammering a few weeks back when they debuted their new online calendar, it's only fair that I now rave over the return of monthly at-a-glance lists for Zoning Commission and BZA meetings, which make finding out what's happening far far easier. Thanks, guys, not only is it great to see this functionality back, but you did a really nice job with it, too.
 
94 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10