Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 100 M
See JDLand's 100 M Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


94 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10

A few items of Near Southeast interest were on last night's Zoning Commission agenda. First, the commission unanimously approved the modification to the Capper/Carrollsburg PUD to change the makeup of Capper Seniors #2 (now nearly completed at 4th and M) from all units for low-income seniors to add some workforce-level (30-60% median income) units as well. Seniors will have first preference, followed by former Capper/Carrollsburg residents who meet the income requirements; because there are no one-bedroom units in the public housing portion of Capitol Quarter, making this switch at Capper Seniors #2 means that former residents in need of a one-bedroom have the chance to move back this year, instead of waiting for 2011 when the multifamily mixed-income buildings get built along 2nd Street. In return for this modification, the developers agreed to amendments recommended by the Office of Planning that additional shared parking spaces be created within three blocks of the building, and that two ride-sharing cars be located at Capper/Carrollsburg (also within three blocks of Seniors #2). So, look for more news in the coming weeks on the "Ballpark Apartments".
The commission also unanimously approved a modification to the office building at 100 M Street that needed to be undertaken because their sidewalk along 1st Street is being narrowed thanks to a decision by DDOT to widen 1st Street north of M to allow for two traffic lanes, two parking lanes, and a bike lane. The commissioners were not happy with DDOT's move, lamenting that the ZC's attempts to create walkable communities with vibrant ground-floor retail and outdoor seating space can get thwarted by a DDOT decision like this one. But the commissioners also agreed that the 100 M developers shouldn't be penalized for DDOT's mischief.
There was supposed to be a final vote on the Capitol Gateway Overlay Review for 1325 South Capitol, the new residential building across from the Nationals ballpark, but that has been deferred to the commission's April 9 public meeting.

 

The Zoning Commission has deferred until its March 26 Special Public Meeting any decision on whether to allow Capper Seniors #2 to be redesignated as a mutlifamily workforce (30%-60% annual median income) dwelling in addition to having its low-income senior citizens units. ZC chair Carol Mitten noted a bit of a disconnect between statements offered by the DC Housing Authority and the Office of Planning, and so both are to meet before March 26 to formulate a recommendation.
The March 26 special meeting will also have the ZC's final vote on the 1325 South Capitol Street residential project, and also the "minor modification" being requested at 100 M Street.
And, since I gave the Office of Zoning a bit of a hammering a few weeks back when they debuted their new online calendar, it's only fair that I now rave over the return of monthly at-a-glance lists for Zoning Commission and BZA meetings, which make finding out what's happening far far easier. Thanks, guys, not only is it great to see this functionality back, but you did a really nice job with it, too.
 

The draft agenda for the March 12 ANC 6D meeting has been sent out (although not posted on their web site as yet, alas), and there are a few Near Southeast items of interest: discussion and vote on an construction agreement (presumably between the developers and the neighborhood/ANC) for 1325 South Capitol Street (the 276-unit residential project across from the ballpark); a presentation on modifications being requested in front of the Zoning Commission to the plans for the office building at 100 M Street (I don't know any details, will post when I find out); and a presentation on streetscapes at the The Yards/Southeast Federal Center (ooooh, more hints of moving forward!). There's also a meeting on the planned Monument Realty project on the Randall School site at Half and I Streets SW (blissfully outside of my purview). The meeting is at St. Augustine's Church at 6th and M Streets, SW at 7 pm.
UPDATE: The 100 M Street change is quite minor, according to Opus East, a result of actual construction drawings evolving from the original design drawings. I also hear tell that First Street is going to be widened at some point by DDOT, which means that 100 M and Onyx on First won't have a wide/deep sidewalk along as originally thought. (I don't have any details on the First Street work.)
UPDATE II: The ANC 6D report in the new issue of the Hill Rag has more details on the 1325 South Cap construction agreement as discussed at the February meeting, though I don't know whether it's changed or not going into tonight's meeting. It also says the project has 276 units, not 244 as I've been reporting.
 

Today I was able to take some photos from up high at the Courtyard by Marriott--since it was a clear day, I could indeed see forever. First off, with the Capper/Carrollsburg demolition west of 5th Street now complete, I've posted before-and-after photos of the Capper footprint that illustrate the astonishing difference 10 months and six blocks' worth of demolition can make; this page also has new photos as you scroll down showing ground-level shots of the final demolished block north of K between 2nd and 3rd. Next are photos-from-above of the holes in the ground at 70/100 I and 100 M/Onyx, with comparison shots from last year (scroll down a bit from the top of the page). And, if you can bear to scroll ALL the way to the bottom, I have views of the Nats ballpark construction from this Courtyard vantage point--it's pretty much like looking into the stadium from dead center field, except four blocks away. And, at the top of the Capper Seniors page, there's a neat shot of all three Capper Seniors buildings. Alas, now I will have to return to taking boring street-level shots for a while....
 

Adding to the projects that look to be starting in 2007, it appears that the 1111 New Jersey Avenue office building being developed by Donohoe is moving forward--they've recently applied for a zoning special exception ("for a waiver of the rear yard requirement"), which has been added to the Bureau of Zoning Adjustment's May 8 agenda. This is slated to be a 146,000-sq-ft, 12-story project with ground-floor retail, and I've heard tell that they're planning a mid-2007 start date. It will be on the land between the Navy Yard Metro station entrance at New Jersey and M and St. Matthew's Baptist Church at L Street (St. Matthew's is not being demolished)--and no, it won't be built up on the grassy hill, they'll dig down to street level! This will make the third project underway on what is known as Square 743N, along with the 100 M Street office building and the Onyx on First residential tower on the other side of the block, along 1st Street.

 

As we slide into the New Year's weekend, I'm bringing 2006 to a close with a pile of new photos. The most comprehensive update would be on my Department of Transportation HQ page, with updated photos from almost every angle, including the not-yet-open-to-the-public views from the south side of the project, along Tingey Street. And I had a lovely time on Christmas Eve morning being briefly detained by security and then escorted off the premises, so I hope you appreciate my sacrifice. I also updated all the 20 M Street shots, as workers have switched into a high gear to have the building ready for a Spring 2007 delivery. The demolition work on the last Capper block has brought some new photos to the Capper Apartments page (updated since yesterday), and my wanderings around the Capper footprint made me also add some new shots to the Capitol Quarter page and even at the bottom of the main Capper/Carrollsburg Overview page. Then I had to go take a few new Nationals ballpark shots (yes, new just since Christmas Eve). Then, because I never want to be accused of ignoring a construction site, I've even posted fabulously exciting pictures of the excavated holes at 70/100 I and 100 M/Onyx. And sprinkled two new M Street images, too. The beloved icon is your guide to all the latest, of course. And I hope to have another big update early in 2007 with some new overhead shots, once the Capper demolition is complete. In the meantime, enjoy this overwhelming bounty.
 

With no debate, the four Near Southeast alley closing bills that have been snaking their way through the DC legislative process in 2006 were passed at today's city council session, with both emergency and permanent bills being passed (emergency bills allow the statutes to take effect immediately, allowing the closings to be considered law as the permanent bills await mayoral and congressional approval). To recap, this batch included the closing of alleys on the west side of Square 701 between M, N, Cushing, and Half (at Monument Realty's 55 M Street site); the closing of alleys and the creation of streets named 2nd Place, 3rd Place, and an official designation of a portion of L Street, all part of the Capitol Quarter footprint; the closing of alleys and the eventual reopening of H and I streets between 2nd and New Jersey to make way for W.C. Smith's 1-million-sq-ft mixed-use project at 800 New Jersey; and finally the closing of alleys on the east side of Square 700 (between Half, Van, M, and N), where Monument will eventually add to their Half Street domination. That makes seven Near Southeast alley closings and street changes put on the books in 2006, when you include the stadium street closings, the Willco land on the east side of Square 701 (M, N, Cushing, and 1st) and the Square 743N west-side alley closings that allowed the start of construction on the 100 M Street office building and the Onyx on First residential tower. There's one more potential alley closing wandering around out there somewhere, and that's for Lerner's 1000 South Capitol Street office building; representatives came before ANC 6D way back in April, but (believe it or not!) a squabble broke out about an acceptable community benefits package in return for the ANC's report, and nothing's been heard on this since.
 

There's not much in it that oh-so-informed visitors to this site don't already know, but here's a brief from Commercial Property News about the start of construction at 100 M Street. The only tidbit in it that's new to me is that CB Richard Ellis will be handling the marketing and leasing.
More posts: 100 M, Square 743N
 

Speaking of taking pictures, I've added some ones to my 100 M Street, 1100 First Street, Capper Seniors #2, and M Street photo galleries. 1100 First in particular has some striking before-and-afters now that trees have been removed along 1st and L streets. I also did some creative cropping of a Sept. 2000 photo of M Street to document (barely!) a solitary rowhouse that used to stand on the 100 M Street lot (where those steps-to-nowhere just west of the alley had been for the past few years, until meeting the wrecking ball over the past few weeks).

 

Thanks to the reappearance of the sun, I was able to take a pile of photos this weekend. It'll take me a bit to get them onto the site, so for now here's pictures of the results of the demolition at the 100 M Street site, which took down the On Luck Cafeteria, the Zohery Bus Tours garage, and some long-abandoned brick townhomes. Demolition will continue this week on that site, to clear the 1100 First Street portion of the block.
More posts: 100 M, Onyx, Square 743N
 
94 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10