Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 100 M
See JDLand's 100 M Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


94 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10

In news from last night's Zoning Commission meeting (and thank the heavens that DCOZ has gotten its live webcast up and running again), the commission gave final approval to the office building proposed for 100 M Street, a 263,000-sq-ft tower being developed by Opus East. Opus is planning to do its construction contemporaneously with the Faison residential project just to its north, and indications are that they plan to start work by the end of this year. A side note--Opus was unable to procure lot 0800, a 1,485-sq-ft empty triangular lot that runs along the southeast portion of Opus's land, abutting the north-south alley at New Jersey Avenue. It makes no real difference in Opus's plans, but is another interesting example of people not selling to developers, which is a fine-enough stand except for when you have a lot that will then be unable to ever have anything built on it....

More posts: 100 M, Square 743N, zoning
 

Also at the ANC meeting, I found out a bit more about some of the new projects in the Near Southeast pipeline: the JPI residential project at 901 New Jersey (which was called "Jefferson at New Jersey and K" on the display boards) will have 237ish units, a pool, fitness room, conference center, etc. The Preston Partnership is the architect (fun web site, guys!). This project was before the ANC to ask for support in advance of its BZA hearing on May 16; however, its requests for a special exception for roof requirements and also a lessening of the residential recreation space were referred to the ANC's development subcommittee, and the ANC voiced its concern about the lack of an affordable housing component within the project, which will probably be something that developers coming to Near Southeast will need to address. As for the Square 743N Faison/Opus East projects along 1st Street, the alley closings brouhaha over the past few months has been settled (the city council approved the bill on its final reading April 4), the developers were back again, now asking for the ANC's support in its hearing before the Zoning Commission on May 25 for approval of the plans for the office building portion of the project, at 100 M Street. The commission voted 4-0-1 to give its support. Finally, a request for closing a portion of an alley on Square 0697 as part of Lerner Enterprises's 1000 South Capitol Street project came before the commission, and after the requisite squabbling over payments to the community for the loss of "public space", this too was referred to the development subcommittee.
 

It's not posted yet, but I've gotten a peek at the agenda for the April ANC 6D meeting, this Monday the 10th, and it's chock full of Near Southeast goodness. There will be a presentation by the DC Sports and Entertainment Commission on the immediate plans for the baseball stadium; then there are presentations on three projects in the pipeline: the Opus East 250,000-sq-ft office building at 100 M Street (the fractious debate at previous meetings over a request to close two alleys on the block for this project has really been jaw-dropping); the JPI project at New Jersey and I; and another request for alley closings (have fun with that, fellas!) for 1000 South Capitol Street. This project is a 320,000-sq-ft office building that Lerner Enterprises has had on the boards for a number of years, and so they appear to now be beginning to move forward with it. It's on the same block--and backs up to--Nation, where Potomac Investment Properties is also now moving on its long-planned 250,000-sq-ft office building at 1015 Half Street. UPDATE: The agenda is now posted.
 

The On Luck Cafeteria on the northeast corner of 1st and M Street is the latest longtime small business to cash out in the Near Southeast Land Rush, having been bought in February for $4.5 million by Opus East, which is developing the 240,000-sq-ft 100 M Street office building. Today's Post has more about the sale, and also says that Opus East plans to start construction later this year.
More posts: 100 M, Square 743N
 

While at the Courtyard by Marriott today, I got some great overhead photos of Near Southeast; as I worked to put them on the site, I realized that it was also now time to launch separate pages for three developments that are in the pipeline: JPI's two residential projects on I Street, the mixed-use development project on Square 699N at 1st, Half, K, and L streets; and the Faison and Opus East 1st Street office and residential towers between L and M. Right now the pages are kind of short on specifics, and I don't have renderings of any of the projects, but with JPI and Square 699N looking to start construction later this year, I figured it was time to break them out into their own pages. Also, I added overhead shots to my Capper/Carrollsburg and North of M pages. (And, in looking at my 2006 pictures, have you all figured out yet that I got a new camera?)

 

A little late to be posting this, but I'll still pass along that on Tuesday the 21st the City Council will be voting on Bill 16-585, which is the request by Faison to close two alleys in Square 743N (the block bounded by 1st, New Jersey, L and M). Faison is wanting to build two towers in that location.
UPDATE: Oops, I was a little quick on the trigger there. The bill was *considered* at the Feb. 21 meeting, and has now been put on the March 7 agenda for its first reading and vote, with the second and final reading on April 4.
More posts: 100 M, Onyx, Square 743N
 

Let's see if I can remember how to post an entry that doesn't have to do with the stadium... ANC 6D has posted its February Meeting agenda, which has a number of Near Southeast items. First, there will be a presentation by the Anacostia Waterfront Corporation on their plans. Then there will be a (re?)discussion of the proposed alley closings on Square 743N petitioned for by Faison to allow for the construction of two towers on 1st Street. There will also be presentation on the BZA application for the planned JPI residential project at 70/100 Street SE, which should give us our first peek at what's being planned for that site. Finally, there is a public space permit application by the Courtyard by Marriott hotel at 1st and L streets SE for a sidewalk cafe (which might be just fancy talk for an outdoor seating area connected to any food service the hotel will be having). The ANC meeting is on Monday, Feb. 13 at 7 pm, at 65 I Street SW.

 

The National Capital Planning Commission has posted the preliminary agenda for its February meeting, with two agenda items pertaining to Near Southeast: a request for approval of comments to city council on the proposed closing of public alleys in Square 743N; and a request approval of a report to the Zoning Commission on the modifications to the first-stage PUD and the second-stage PUD for the Arthur Capper/Carrollsburg redevelopment.
More posts: 100 M, Capper, Onyx, zoning
 
94 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10