|
| ||||||||||||||||||||





|
Comments (2)
More posts:
winterclassic
|
It's almost that time, with the NHL Winter Classic's puck drop now less than 48 hours away, at 1 pm on Thursday, Jan. 1 at Nationals Park. (Check out the webcam to watch as preparations inside the stadium are rushed to completion.)|
Comments (0)
More posts:
Events, winterclassic
|
|
Comments (14)
More posts:
Restaurants/Nightlife, Retail
|
|
Comments (2)
More posts:
Development News
|
Cleaning out the tidbit hopper with some new and not-quite-so-new items of note. I imagine posting will be light in the next few days, but you never know. |
Comments (1)
More posts:
100 M, Development News, Metro/WMATA, Van Ness Elementary, DC Water (WASA), The Yards at DC Water
|
Reports from folks involved with 20 M Street say that the new Subway Cafe restaurant opened this morning at 10 am.|
Comments (2)
|
If you are looking for some light Christmas reading, you can sit down by the fireplace with all 335 pages (plus appendices!) of the newest revision to the plans for reconfiguring much of South Capitol Street, including the construction of a new Frederick Douglass Bridge.
The initial design of the ovals and of the bridge itself were met with some consternation during this revision process. The SDEIS notes that in response to these concerns, DDOT has created a "Visual Quality Manual" for the project, which identifies design goals that are to "reflect the vision of providing a grand urban boulevard, which will be a gateway into the nation's capital, an iconic symbol of the District's aspirations in the 21st century, and a catalyst to revitalize local neighborhoods and the Anacostia Waterfront." (page 2-26).
As for the bridge itself, the version in this RPA will support three travel lanes in each direction, along with 18 feet of bicycle and pedestrian paths on *both* sides of the bridge--an 8-foot lane for pedestrians and a 10-foot birdirectional bike path. (Enlarge the image at right to see that I'm not lying about the bike/ped stuff.)
Revisions have also been made to the ramps from South Capitol Street to I-395 and I-695, but the basics from the original plans remain, most notably the demolition of the existing suspended ramp from northbound South Capitol to the SE/SW Freeway.|
Comments (5)
More posts:
Pedestrian/Cycling Issues, meetings, M Street, South Capitol St., Douglass Bridge, Traffic Issues
|
|
Comments (0)
More posts:
Southeast Blvd., Traffic Issues
|
Word has filtered my way that Justin Ross's new venture The Big Stick is opening for business at 5 pm today, Dec. 18, in the ground floor of 20 M Street on the northwest corner of Half and M, SE. |
Comments (7)
|
I finally got my lazy self over to 11th Street with my camera this past weekend, and got quite the view of the soon-to-arrive Southeast Blvd., the reconstituted road between Barney Circle and 11th Street that runs along the path of the old sunken east end of the Southeast Freeway.
At right is a side view showing the proposed elevation for Concept A, running from L Street at left over to the train tracks and then down to the river.The CSX train tracks that run to the right of the road's footprints prevent further connection of these streets to M Street and the river, but there could be pedestrian bridges built to bring people across the tracks. (Note that all three concepts show the position of the planned 1333 M Street residential project just south of the boulevard.)
Two of the designs call for development within the huge median, either of low-rise multi-family buildings or townhouses or some combination thereof (at right is a rendering of the Concept A vision). The third design leaves it as a wide-open park space. And two of the three plans show the parking beneath the boulevard for buses that seems to be a requirement from DDOT's point of view.|
Comments (6)
More posts:
Southeast Blvd., Traffic Issues
|
A press release today gives official details on the SPECTATOR PLAZA PRESENTED BY GEICO that is going to be set up at the Fairgrounds on Half Street during the hours leading up to the NHL Winter Classic® at Nats Park on Thursday, Jan. 1.|
Comments (4)
More posts:
winterclassic
|
I could blather on in some kind of forced introduction about how the weatherman sold my camera and me a bill of goods this weekend ("mostly sunny," eh?), and how the low sun and weak light and wispy clouds made for less-than-stellar images, but instead let's just jump in.
A DC council hearing on Thursday afternoon shed some light on the current status of Forest City's planned 16-screen luxury movie theater on property near 1st and O Streets, SE, a development which has been stalled for nearly a year during the hunt for a suitable location to move a portion of the DC Water operations currently housed at the site.
However, the horizon isn't quite so clear when it comes to getting DC Water off two additional parcels on the site, where Forest City plans 600 residential units in two buildings along with 35,000 square feet of ground-floor retail. The agency's customer care and sewer services operations currently located there need to be moved somewhere within the city limits, and these days there are precious few industrial-type locations to choose from. |
Comments (2)
More posts:
Development News, The Yards at DC Water
|
* M STREET CLOSURE: DDOT has put out the word that M Street SE between 8th and 11th will be closed on Saturday, Dec. 13 from 6 am to 9 pm, weather permitting, to complete final surface paving and striping between 10th and 11th. |
Comments (1)
|
We're well into the holiday season, and there are some events this weekend that may be of interest, in between your hall-decking and jolly-making.|
Comments (0)
More posts:
Canal Park, Events
|
It's mere hours until the official opening of 100 Montaditos at the Boilermaker Shops in the Yards, but a lucky few (including myself) have gotten the chance this evening to step inside, check out the atmosphere, and sample the menu.|
Comments (11)
More posts:
100montaditos, Restaurants/Nightlife
|
This week DDOT released its Final Circulator Development Plan, which among many other items calls for the extension of the Union Station-Navy Yard route along M Street to the Southwest Waterfront, sometime in the next two years, a plan that already has funding from the DC Council.
However, the report also recognizes that this line "in particular suffers from severe congestion around Union Station" and that DDOT is pursuing options to reroute this line.|
Comments (7)
More posts:
circulator, Traffic Issues
|
A community meeting is on tap for Thursday (tomorrow), Dec. 11, to discuss the future Southeast Blvd., specifically the ideas emerging from the neighborhood study currently being spearheaded by ANC 6B, the Office of Planning, and DDOT.|
Comments (4)
|
FRP's deVilliers was even more relieved, as well he should be--he spoke of his initial discussions with the Office of Planning about redeveloping the site, which occured in 1994--a mere 20 years from there to construction! (I came in at about the halfway point, and have probably spent more time writing about the zoning ins and outs of this project than any other.)|
Comments (0)
More posts:
Development News, Florida Rock
|
More notes about buildings and food:|
Comments (7)
More posts:
100montaditos, 801nj, banfield, Development News, Florida Rock, Restaurants/Nightlife, morini, willies
|


























