|
| ||||||||||||||||||||





|
|
icon be your guide. (I'd post updated photos of the continuing Capper demolition, but for crying out loud they're STILL not finished with the tiny block bounded by Virginia, I, 3rd, and 4th, which they started eight weeks ago. I think I could have done it faster with a hammer and shovel.)
|
|
icon is your guide for the latest offerings.
|
More posts:
20 M, 400m, Capper, Capper Senior Apt Bldgs, Monument Valley/Half St., staddis, Nationals Park
|
|
More posts:
20 M, 400m, Capper Senior Apt Bldgs
|
|
More posts:
400m, Capper, Capper Senior Apt Bldgs, Capper Seniors/900 5th St., Capitol Hill Tower, Courtyard/Marriott
|
shots to add to the WASA page as well as the Capper Seniors page, with construction on both #1 and #2 proceeding along. I also updated the Capper Seniors #1 slideshow. Just because.
|
|
|
|
|
|
There's also an additional agenda item for "Capper/Carrollsburg Venture LLC -- Senior Building," which I believe is a revision of the design of Capper Seniors #2, because the design submitted in 2003 included a blank wall along M Street, which is a zoning no-no in this area. The need for this vote was discussed at the Jan. 12, 2004 meeting, and is probably why the project's building permit application has the zoning section marked "Hold for Correction." (Yes, my head hurts, too.)
Speaking of second-stage PUDs, while wandering around on the web trying to educate myself on this topic, I found this 1999 National Capital Planning Commission document, showing the detailed plans for Florida Rock. However, that was then and this is now, and in December the Zoning Commission will be again taking up Florida Rock's second-stage PUD. So we'll have to wait and see what changes have been brought by six years (and a baseball stadium next door).
|
|


























