|
| ||||||||||||||||||||





|
Comments (3)
|
From DDOT, news of another milestone in the 11th Street Bridges reconstruction project:|
Comments (4)
More posts:
11th Street Bridges
|
* South on South Capitol: The Fairgrounds folks are launching a "South on South Capitol" southern rock concert series, featuring local and regional country and southern rock bands, along with mechanical bull rides (!), food trucks, and the Bullpen bar. The first one is scheduled for May 25, then June 22, July 27, and Aug. 24. (They're all Fridays.) Admission is free.|
Comments (0)
|
At Monday's ANC 6D meeting, representatives of MRP Realty made a presentation showing the updates to the RiverFront on the Anacostia project (aka Florida Rock) that they will be taking to the Zoning Commission later this year.
There was also much time spent on the designs for the public spaces that span the 5.5-acre site. With large lawns, wetlands-type areas that would actually be bio-filtration mechanisms, quieter tree-covered spaces, and a marina that could potentially have 40-50 slips, the additions could be seen as echoing the Yards Park a couple blocks to the east.. But there are also some "beach" areas where sand would be placed, and a large sculpture could be included in the "Riverfront Plaza" at the foot of 1st Street. The esplanade is still a major part of the design, but there is no longer a separate bike path--pedestrians and cyclists would share the boardwalk as it runs through the entire site, from South Capitol Street to Diamond Teague Park. And there may even be locations where some of the concrete blocks from the old concrete plant site would be incorporated into the public spaces.|
Comments (3)
|
* Canal Park: Chris Vanarsdale of the Canal Park Development Association gave an update on construction, the bottom line of which has not changed from what's been mentioned the past few months, that because of unexpected issues, the park's opening has been delayed until November. Unmapped utilities that required a redesign of the stormwater management system have been a big stumbling block, but Vanarsdale also mentioned the soil-related difficulties when building on the site of an old canal. Construction is now 60 percent complete, and the work on the pavilion is almost done. Here are the presentation slides, and you can also check out the official web site for more details (along with my project page). Oh, and they're thinking about offering Zamboni driving lessons!|
Comments (6)
|
* New Jersey Avenue Underpass Art: The Capitol Riverfront BID gave an update on the "Water Pylons" art installation, which is now moving forward after being "dormant" for about a year. This is the project partially funded by a grant from the DC Commission on Arts and Humanities that will paint and light the pylons holding up the Southeast Freeway in a "modern representation of water that announces New Jersey Avenue, SE as a gateway to the Capitol Riverfront community." The reflective blue paint should go up in July, followed by light fixtures in August, and the installation should be dedicated in September, which will be right around the time that DCCAH moves into its new nearby digs at 225 Virginia/200 I. Passers-by may note that new fences and LED overhead lighting have already been installed along New Jersey as part of the transformation of the underpass. The BID's presentation to the ANC, with more information about the project, is here.|
Comments (11)
|
|
Comments (0)
|
DDOT is announcing that the the 8th Street exit ramp from the westbound Southeast/Southwest freeway is closing permanently on May 10 at approximately 10 am.
As to when/how the other new ramp that will bring traffic up to 11th Street from the Pennsylvania Avenue/Southeast Freeway connector will open, I don't know. There are a lot of traffic flow changes are coming to 11th Street between I and O over the next few months--the new ramp to the outbound freeway bridge from M just east of 11th is looking closer to completion, as is the 11th Street Local bridge. If only someone would get over there to take some photos of the progress! (Well, I did take *one.*)|
Comments (0)
More posts:
11th Street Bridges, Traffic Issues
|
|
Comments (1)
|

|
Comments (1)
|
|
Comments (2)
More posts:
Events, Nationals Park
|
|
Comments (0)
More posts:
CSX/Virginia Ave. Tunnel, meetings
|
|
Comments (0)
|
|
Comments (14)
More posts:
CSX/Virginia Ave. Tunnel
|
I've learned today that mega-developer Toll Brothers has purchased the Square 699N land directly north of the Velocity Condos building on 1st Street SE for $24 million, with the intention of building a 250ish-unit residential building. |
Comments (10)
|

|
Comments (1)
|
After a west coast swing that sputtered a bit at the end, the Nationals return home today for the rest of the week, starting with a three-game series against the Arizona Diamondbacks before the weekend's touted Take Back the Park games against the Phillies.|
Comments (2)
More posts:
Nationals Park
|
|
Comments (1)
|


























