Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3115 Blog Posts Since 2003
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 312
Search JDLand Blog Posts by Date or Category

Part of my laziness over the past two weeks was being sure that Fort Spooky had probably completely disappeared while I was out of town, and I was hating having missed some final demolition shots. But whaddya know! Some of it is still hanging on:
My Building 213 Expanded Photo Archive gives you the before-and-afters from more than 50 angles, which still probably isn't every spot in the neighborhood that has/had the building in its vista.
And, late in the week another long-sought demolition wrapped up, as seen in this terribly exciting before-and-after:
 

I was out of town for a bit (Detroit!), but it was mainly laziness (abetted by a lack of major news) that's kept me silent for nearly two weeks. When the lovely weekend arrived, though, I took a survey of the latest. I'll break it up into a few posts.
As scheduled, Sweetgreen opened at Twelve12 a little over a week ago. Here's the outside looking in, and the inside looking out:
As for Twelve12 itself, work is still on-going at the Vida empire, the Teeter, and the upper levels of the residential, but the streetscapes are finished, and the northeast corner of 4th and Tingey now looks well filled in:
(Judging by the ads, it appears that the opening date for the Penthouse Pool club has been pushed back to August.)
 

(I am, as they say, out of pocket, so I hope you will have patience with me for being in cut and pasting mode today.)
Here is the release sent out on Wednesday from the DCSafeRail folks about the Virginia Avenue Tunnel Final Environmental Impact Statement released last week:

DC APPARENTLY PRE-APPROVES CSX TUNNEL BEFORE ENVIRONMENTAL STUDY CONCLUDES

(June 19, 2014) Washington, DC--According to documents in the Environmental Impact Statement for the CSX Tunnel at Virginia Avenue, SE, released last Friday, it appears that the District Department of Transportation has predetermined the EIS and apparently rubber-stamped CSX’s proposal for a partially open-trench construction project that will carry hazardous cargo less than a mile from the U.S. Capitol and through the heart of a growing residential/business community. It also appears to contradict Mayor Gray’s promise, made to over 400 people in January, that “…there is no way that we are going to allow people’s safety and security concerns to be compromised” by the CSX Tunnel.

In Appendix A (pg. 47) of the Final EIS appears to show that DDOT entered into a previously unknown agreement with CSX to grant occupancy permits to expand the tunnel’s right of way beyond its existing footprint. Additional agreements apparently indicate that upon conclusion of the project, CSX would be entitled to a permanent right-of-way to cover the expanded tunnel.

“We hope that the District Government has not thrown us under the freight train,” said Helen Douglas, a member of DCSafeRail, the coalition committed to the health, safety and security of the people in and around the CSX proposed expansion site. “We ask Mayor Gray to honor his commitment to us and withdraw any pre-EIS approval for these permits and conduct a true EIS with real alternatives to the CSX Tunnel fully analyzed.”

DCSafeRail will also ask the City Council, through Chairman Phil Mendelson, Councilmember Mary Cheh, chair of the Council’s transportation oversight committee, and our own Ward 6 Councilmember Tommy Wells to hold hearings on the whole CSX Tunnel EIS.

The CSX Tunnel project will route freight trains with hazardous cargo, including occasional Bakken crude oil, through a partially open construction trench for almost four years. DDOT and the Federal Highway Administration (FHWA) prepared the EIS.

“At best, this indicates that the District government is failing to uphold basic principles of good government, including transparency and accountability,” said Douglas.” At worst, it suggests that the environmental study is a farce because it rubber-stamps the CSX open-trench proposal.”

The Washington Post had a short piece on this response, with DDOT's response to the response: "DDOT spokesman Reggie Sanders said in an e-mail that the permit relative to Virginia Avenue SE and adjacent streets 'will have no force or effect until a build alternative is approved via Record of Decision.' Other requests for comment regarding the city’s commitment to the project have not been answered."
 

I already wrote about how this Saturday, June 21, is the target date for DDOT to open the new ramp from eastbound I-695 to 11th Street, SE. (Yay!)
But now there's a related closing to note: On June 21, DDOT will close the newish on-ramp from 11th Street SE to the westbound Southeast Freeway for two months, until approximately August 23.
This will allow the completion of the rebuilt exit to I Street from inbound I-695, which has been closed while the old flyover has been demolished.
If you're needing to get on the westbound freeway, you'll need to use the ramp at 3rd Street and Virginia Avenue, or the South Capitol Street ramp. (Or I guess you could go backwards and get on southbound DC-295 at Pennsylvania Avenue and take the Capitol Hill exit.)
Here's DDOT's advisory on that closing if you want to know more, or to see the pretty graphic with all the detour arrows.
Meanwhile, the icky configuration of the eastern section of M Street thanks to DC Water's Clean Rivers Project is about to get ickier: Starting on or about Wednesday, June 18, through the end of the year, two eastbound M Street lanes between 7th and 11th Streets, SE will be closed 24/7, leaving two lanes of eastbound and two lanes of westbound traffic on M. Best to also expect some stoppages of traffic during the work hours of 7 am to 7 pm Monday through Saturday.
You can read the DC Water advisory on the closure for more information.
 

It was Saturday. It was beautiful. I wandered.
(Click on any of the photos and get a pop-up gallery of all of them--at least for non-mobile, non-RSS, non-email readers)
First, the obligatory Building 213 demolition shots. Let's compare the state of things on June 2 (left) and June 14 (right):
It's also fun to move back a block and get a better view from the east side, from November 2007 to this weekend. Where did all that sky come from?
And of course there's your basic Om Nom Nom shots:
There's also more peeks at other spots. First, I bring you the holes in the ground at the Hampton Inn on 1st Street (left) and the new residential building at Yards Parcel N (right):
Next, the still-papered over Sweetgreen at Twelve12, in advance of its opening this week, and a nose-pressed-up-against-the-dirty-window shot of the progress at the Harris Teeter in the same block, scheduled to open Oct. 1:
And I'll wrap up with the two photos below. At left, Twelve12's all-but-completed new service nestled between the new building and Building 202. And at right, on 1st south of K, the trailer that arrived this week, which is the one I posted about on Friday--and my guess that it is to be the leasing office for River Parc across the street has been confirmed.
The links to the project pages will show you these photos and many more....
 

Way back when, the Cohen Companies' plan on Square 699N was to build the Velocity condo building at 1st and L and then almost immediately start work on a twin residential building directly to the north.
Velocity went up, but the twin did not follow for nearly four years--after Cohen sold the empty lot to Toll Brothers, which is now building the River Parc apartment building on the site. And having a different developer build the twin has brought about a sticky situation.
Within recent days, Velocity residents have discovered that Toll's layout for the River Parc roof includes a wall that completely obscures the formerly expansive Capitol dome views from Velocity's roof deck.
This Facebook page shows the old view from Velocity's roof--and the photo below, provided by a resident, shows the new one.
In addition, the new building's design appears to place the building's 237 air conditioning units on the south side of the concrete wall, facing Velocity.
A recent e-mail to Velocity residents informed them that "[T]he ANC Commissioner, The Department of Consumer and Regulatory Affairs and the offices of Planning and Zoning have all been contacted and we are being told that all construction is being done in accordance with all plans, permits, zoning, and easements" and that "Every avenue is being pursued to somehow make this situation better for us." Alas, "[A]s long as they are within all legal parameters of their construction of this building, there is little we can do."
Capitol Dome views are a sticky wicket in the neighborhood, since almost all of the buildings that have already gone up stand to eventually lose their panoramic vistas as newer projects continue to fill in the empty spaces. (Just ask Nationals Park!)
The exceptions are 70/100 I (aka the Jefferson and Axiom) and the about-to-be-built 800 New Jersey, all of which border the freeway and so will likely keep their views pristine, as long as Capitol Hill north of the freeway doesn't suddenly start to allow 13 stories of construction.
But an impenetrable concrete wall certainly puts an exclamation point on the issue.
 

I'm not going to wait to post until I read the whole thing (448 pages!), so here it is.
But I glanced at the Executive Summary, and here's the money graf:
"Preferred Alternative - Two New Tunnels (originally Concept 5 and identified as Alternative 3 in the Draft EIS): Alternative 3 was selected as the Preferred Alternative. It involves replacing the existing Virginia Avenue Tunnel with two new permanent tunnels constructed sequentially (see Figure S-2). Each new tunnel will have a single railroad track with enough vertical clearance to allow double-stack intermodal container freight trains. A new parallel south side tunnel will be built first as trains continue operating in the existing Virginia Avenue Tunnel. After the south side tunnel is completed, train operations will switch over to the new tunnel and the existing Virginia Avenue Tunnel will be demolished and rebuilt. With the exception of operating in a protected open trench for approximately 230 feet immediately east of the 2nd Street portal (within the Virginia Avenue SE segment between 2nd and 3rd Streets SE), trains will operate in enclosed tunnels throughout construction under the Preferred Alternative. Throughout most of the length of the entire rebuilt tunnel, the two tunnels will be separated by a center wall. This center wall will be the new centerline of the two tunnels, and it will be aligned approximately 25 feet south of the existing tunnel centerline, between 2nd and 9th Streets SE. Due to new columns associated with the rebuilt 11th Street Bridge, the tunnels will be separated on the east end starting just west of Virginia Avenue Park, resulting in two separate single-track tunnels and openings at the east portal. "
I will keep reading, and either update this post or write in the comments thread below as I see more items of note.
UPDATE: Here's the Post on the release. "Following the meeting, the federal agency is expected to release a record of decision, which could give CSX approval to seek construction permits for the project. CSX would need to go through the District’s permitting process before construction could begin, but company officials say they hope to break ground on the $170 million project this year."
UPDATE II: The VAT fact sheet, with these bullet points on pledged improvements post-construction:
* Improving access to Garfield Park for wheelchair-dependent individuals (page 5-65);
* Building a continuous bike path between 2nd and 9th Streets connecting Garfield Park and Virginia Avenue Park (page 5-98);
* Straightening the alignment of Virginia Avenue SE within the 400 block to be consistent with the original L’Enfant Plan (page 5-59);
* Improving the traffic lane configuration between 5th/6th and 8th Streets to provide safer and calmer traffic conditions (appendix M, roadway layout sheets 2 and 3 of 4); and
* Installing landscaping and improved street lighting, traffic signals and crosswalks (page 5-84).
UPDATE III: In the EIS itself, I recommend reading Section S.7, "Key Issues Raised by Community and Responses," which starts on page 52 of the PDF. It's a big FAQ about a lot of very small details that have come up over the months/years.
UPDATE IV: From a DDOT press release (and I'm sure from somewhere in the EIS as well), some additional key features and mitigations:
* The dual tunnel construction ensures that there will be no trains operating in an open trench near residences;
* Cross streets will be maintained throughout construction;
* Residential mitigations include a one-time payment to the Arthur Capper senior residence ($250,000), a payment of $500/month to those residences on the front line of construction, and possible reconciliation payments of up to $75,000 to certain owners that need to sell their homes;
* Enhancements fund for the project area ANC;
* Creation of a historic preservation fund;
* Reconstruction of Virginia Avenue SE to include improved sidewalks, new trees, and a bike lane;
* ADA improvements to the Garfield Park; and
* A new dog park at the Virginia Avenue Park.
CSX will also enter into District resident hiring and local business (CBE) utilization agreements.
 

I've got a few more itty bitty items, so let's have another tidbit go-round:
* LOT LAYING: Enough people have written (and progress has been so slow) that I finally have to post that the work many of you are seeing on the Congressional Square block at 1st and I isn't the beginning of development there--the word is that the parking lot on the west side of the block is being extended eastward.
* PILE DRIVING: Pile driving has started at 800 New Jersey/Whole Foods, if your ears haven't already alerted you.
* TRAILER PLACING: A building permit just came through the pipeline for a temporary sales trailer at 1000 1st St. SE. The land. owned by Akridge, is unlikely to be about to see any large-scale construction, so might this instead be the beginnings of a leasing center for Toll's River Parc across the street?
* FERRY DOCKING: Following up on the ferry news from last week, I finally heard back from the office of Frank Principi in Woodbridge--it sounds like the routes and docking locations are still not 100 percent decided on. There is a stakeholder's group that will ultimately make the decisions, and it is meeting later this month to work on the project. So reports of a "Navy Yard" destination or a St. Elizabeth's destination or a Bolling destination appear to be premature.
 

It's been officially announced that next week Sweetgreen will be opening its newest location, on the northeast corner of 4th and Tingey in the ground floor of the Twelve12 apartment/retail complex at the Yards.
The purveyors of food that is more healthy than should be allowed by law* are planning a soft opening on Wednesday, June 18, from 11 am to 4 pm, where you can pay what you want for food ordered during their test run, with proceeds going to FreshFarm Markets.
Then it's anticipated the restaurant will open on Thursday, June 19 for regular business, with hours of 10:30 am to 10 pm seven days a week.
This is Sweetgreen's twelfth location in the DC area. It's in the same block as Vida Fitness, TaKorean, and Harris Teeter, all of which should be opening over the coming months. Twelve12 expects its first move-ins this month.
(I kid because I love. I am a devoted fan of the Guacamole Greens salad.)
 

At a public meeting on Wednesday night, the team working with the DC Housing Authority unveiled what programs the consultants will be recommending be offered at the Capper community center, a list that grew out of the recent survey about residents' wishes.
The recommendations are:
* A 7,000-square-foot gymnasium with basketball court that can also be divided into two smaller courts when needed;
* A 3,600-square-foot day care center, which would also include a secured outdoor play area;
* Three multipurpose fitness rooms (for yoga classes or the like):
* Two multipurpose classrooms;
* One individual fitness area, which could include treadmills and weights; and
* A small "soft play area" for little kids.
The recommendations are not a written-in-stone marching order, however. Soon the Housing Authority will be putting out an RFP to find the organization that will run the community center (though apparently we're now calling it a "community building," because #branding). The operator would then have "flexibility" in what it offers, while ostensibly guided by the survey results.
There were 473 responses to the survey, and the meeting slides show both the demographic breakdown of respondents as well as the top vote-getters in both fitness and "enrichment" activities.
The slides also include conceptual drawings of how the two-story building could be laid out to handle the recommended offerings, though it was stressed that the operator will be making the final decisions on layout and whatnot. (You may remember that there was at one time a basement planned for the building, but it's now been removed from the design.)
Attendees at the meeting did not rise up in fire-breathing opposition to the presentation, though concerns were raised about the lack of garden space, the seeming preference of fitness activities over learning/cultural/enrichment activities, and the need for space and kitchen access to accommodate private events like kids' birthday parties.
Even though the consultant's report is due to DCHA next week, the team still wants to hear comments, if you've got them.
The slides also said that the groundbreaking for the building is "about to happen," which of course translates to JDLand Speak as "Any Minute Now."
 

Metro announced today that it has chosen MidAtlantic Realty Partners and CAS Riegler Companies to develop the agency's 14,000-square-foot lot on the southwest corner of Half and L streets, SE, known as the "chiller plant" site.
Plans are for a 126-unit condo building with 6,000 square feet of ground-floor retail, in addition to integrating the chiller facility into the building.
The deal still has to be approved by Metro's board of directors, but the press release says "construction is expected to begin in 2016."
The press release does not say if the team plans to also purchase the 7,700-square-foot lot next door, which is for sale (and which has a bit of a history).
This will be MRP's second foray into the neighborhood, after having entered a deal in 2011 to co-develop the (still pending) first phase of the Florida Rock development.
The path to developing this site has not been a short one, given that WMATA has been trying to get the site developed since 2006. Three bids were received for the site earlier this year, two residential and one for an office building.

 

Word is hitting the streets that the public meeting for the Virginia Avenue Tunnel's Final Environmental Impact Statement is scheduled for July 1, from 6:30 pm to 8:00 pm at the Capitol Skyline Hotel. Presumably the actual document will be available before then...?
 

* FILLING WATER: After the flooding a few weeks ago took out the pumps, the Yards Park folks are now reporting that the basin is starting to be re-filled. Though it's still in a testing phase, officials are optimistic that the wait is almost over and the basin and fountains should be back in operation soon.
* MANAGING WATER: The EPA has released the case study about Canal Park entitled Integrating Stormwater Management and Public Amenities through a Public-Private Partnership, saying that the park "exemplifies how a public-private partnership can be used to create a public amenity that enhances the community and provides environmental benefits."
* FRONTING WATER: I came *thisclose* to posting a link that just popped up in my RSS reader about how the developers of the Florida Rock site just said that they expect to begin construction on Phase I of RiverFront on the Anacostia in "mid-2014"--but then I thought to look at the date on the release, and it was May 7. So I guess could still technically be considered news, but we're now reaching "mid-2014" with no sign of movement....
* CROSSING WATER: A reminder that tonight at 6:30 is your chance to meet the four finalists in the Bridge Park design competition. The event is at 1801 Mississippi Ave., SE.
And in the No Water Connection At All Department:
* COMMUNITY CENTER: Tomorrow night, Wednesday, June 11, is the public meeting on the results of the Capper Community Center survey.
* VAN NESS: Greater Greater Education looks at the drive to reopen Van Ness Elementary School.
(and no, the headline isn't a typo)
 

The week begins with the news that WC Smith is officially beginning construction this week on 800 New Jersey, the 336-unit apartment building just south of the Southeast Freeway and just north of the topped-out Park Chelsea.
And, in case you don't believe me, I have proof! Witness dirt being dug! A press release from WC Smith officially announcing the start of the $87 million construction project says that pile driving operations will be getting underway this week.
But of course the excitement in the neighborhood surrounding this project isn't for the arrival of still more residential units--it's for the building's 35,000 square feet of ground-floor retail space, which will be home to a long-sought Whole Foods after the building is completed in late 2016.
And, just like with its sibling to the south, 800 NJ's construction will include the construction and opening of a "new" street between 2nd and New Jersey--this time it will be H Street, running from just north of 200 I over to New Jersey just south of the freeway.
This is the second of three residential buildings on the block, with a third, 393-unit building fronting 2nd Street to follow. Residents in all three buildings will be able to use the facilities in every building, giving them "unparalleled access" to club rooms, game rooms, rooftop pools, an indoor lap pool, exercise facilities, dog walk areas, a demonstration kitchen and the 15,000 square foot courtyard.
As for the Park Chelsea, having been topped out a few weeks ago, work continues, with the bricking of the exterior being the next obvious milestone now underway.
My camera got a tour of the Park Chelsea this afternoon, and everyone better appreciate the 12 flights of stairs I walked up to get some of these pictures. (I do and I do and I do for you people.) It is expected to open in Spring 2015.
 

It was announced earlier this week that the US Department of Transportation has awarded a $3.38 million grant to help establish a "fast ferry" service from Alexandria to "the Navy Yard.".
(I've been a bit slow in posting on this because I've been trying to find out whether it's really to "the Navy Yard" (or "the Naval Yard") or to Diamond Teague Park and Piers, which would seem to be the logical location and which was the spot used in the 2009 study of possible service. Haven't come across a firm answer on that in any coverage, but maybe someone else has....)
According to WTOP, the money will be used to buy two ferry boats and operate them during business hours.
WTOP's piece also says that "[g]etting the ferry service off the ground is not a huge technologically complex issue that some would think. But growing it and sustaining it will be more difficult." Prince William County Supervisor Frank Principi, longtime advocate for water-based commuting opportunities, says that it will require partnerships, such as local governments, the military, and the private sector, to sustain the service.
Principi says that the service could be up and running within a year--but there isn't as yet a dock location identified in Alexandria.
UPDATE: As mentioned in the comments, the Post reports today that the destination will be Bolling and St. Elizabeth's (and that's what the actual FTA release says). Maybe earlier reporting was assuming people could swim to the Navy Yard from there.
 

As I spend a glorious late spring day reading the Office of Planning setdown report for Forest City's request for additional building height allowances in Yards West, my eyes lit up at this paragraph, in reference to the "Parcel A" site where Building 213 is currently in its final days:
"Finally, the site is located about a block east of one entrance to the Navy Yard Metro station, and across M Street from the west entrance[.] Both entrances can be quite congested, particularly during rush hours and on baseball stadium game/event days. WMATA has indicated a desire to increase capacity and convenience to passengers by providing an additional entrance to the Navy Yard Metro station on the south side of M Street on Parcel A. To faciliate this, OP is proposing that, as part of Zoning Commission review of any development on Parcel A, facilitation in the site and building design for a new entrance be provided - this would not require [Forest City Washington], the developer, to provide the new entrance, but rather would ensure that any construction on the site would accommodate this additional entrance."
Not something that would happen anytime soon, I imagine, but good to know that it's at least being thought about.
 

The next step in the 11th Bridges project is coming on or about June 21, when the new ramp down to 11th Street SE from the eastbound Southeast Freeway is scheduled to open.
This means that folks on the eastern end of Capitol Hill will no longer have to get off at 6th Street and wind their way eastward--they will arrive at 11th just north of L, and can either turn left on 11th or right to the Navy Yard and across the 11th Street Local bridge to Anacostia.
The map at right provided by DDOT shows the various new movements that this new ramp will put on the table.
Coupled with the entrance ramp to the westbound freeway that opened a while back, 11th Street is now quite the access point for the Southeast/Southwest Freeway. And someday, it will be a full intersection that will include traffic traveling to or from Southeast Blvd., in whatever form that ends up taking.
 

As you can see, If you rent one of the Twelve12 units on the north end of the building, you'll have a great view of the construction at the Lofts at Capitol Quarter.
Now to the tidbits:
* The latest on the Xavier Cervera mess. (WSJ)
* Apparently there is a void that can only be filled by a PROFESSIONAL. (City Paper)
* The 11th Street Bridges project receives an Award of Excellence in Concrete from the National Capital Chapter of the American Concrete Institute. No, really. (Hill Rag)
* The Courtyard touts its makeover. (Press release via Yahoo)
* How does DDOT see the city's multimodal future evolving? Check out the MoveDC draft transportation plan.
And, on the agenda:
* On Thursday, the Nats play the Phillies at 4 pm, which clears the evening for the first NatsLive concert of the season, with the Plain White T's. The show is free for anyone with a ticket to the game, though there's no truth to the rumor that they will just play "Hey There, Delilah" 17 times in a row.
* Then at sundown the Capitol Riverfront Summer Outdoor Movie Series kicks off at the northern end of Canal Park with the Sandlot.
* On Friday, Sam O brings reggae to the Yards Friday Night Concert Series, starting at 6:30 pm.
* If you can think this far ahead, it's been announced that Snallygaster is returning to the Yards, on September 13. "An epic day of inimitable imbibery and monstrous merriment featuring over 200 craft drafts."
 

Readers have reported--and Donohoe has confirmed--that the company is beginning to put up scaffolding to erect "overhead protection" around the canopy on top of the Metro entrance at New Jersey and M. And within the next couple of weeks, demolition is expected to begin at St. Matthew's Church on the north end of the block, at L Street.
This is in preparation for what the company "hopes" is a start date later this summer for its 324-unit residential building at 1111 New Jersey (I'm not quite ready to call it "The Gallery at Capitol Riverfront" just yet).
Note that the building will not be directly on top of the Metro station, as 55 M is over at the west entrance. But the big concrete retaining walls and small hill of grass will go away, and the new building will be right at street level.
If 1111 does in fact get underway (my caution is well earned!), it will join the now-lengthy lineup of under-construction residential projects in the few years: Twelve12, Park Chelsea, River Parc, Parcel N, the Lofts at Capitol Quarter, and 800 New Jersey (which should be getting started Any Minute Now, and did in fact get its excavation permit last week). Including 1111 NJ and 800 NJ, that makes about 2,100 new units in the active pipeline. (And maybe 320 more if Grosvenor gets the residential and hotel part of Ballpark Square off the ground this year like it seems to be planning.)
That's a lot of new neighbors....
 

I put a hard hat on my hard head for the first time in what feels like forever, and got my first look inside the soon-to-open Twelve12 apartment building on 4th Street at the Yards.
There's still a lot of finishing touches underway, but I got some photos of the model unit as well as some of the other parts of the residential portion of the development.
Forest City says that the building is somewhere in the neighborhood of a quarter leased, with the first move-ins coming later this month. Current prices range from $2,100 to $3,100 for studios/1 BRs, and from $3,500 to $4,500 for the two-bedroom units.
I didn't get inside the various retail offerings (though I did press my nose up against the windows). Sweetgreen, TaKorean, and the various components of the Vida Fitness empire (including Aura Spa, Bang Salon, and the Penthouse Pool Club) should be opening over the next few months, and the Harris Teeter Twitter account recently pegged Oct. 1 as the opening day for its new home at 4th and M.
Go look at the entire gallery for lots more shots.
 
3115 Posts:
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 312
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.