Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2591 Blog Posts Since 2003
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 260
Search JDLand Blog Posts by Date or Category

Saturday was a lovely day for taking a couple of walks with camera in hand, and with work underway at locations that couldn't be any closer to my out-of-neighborhood house, I had no excuse to not get some updated photos of 225 Virginia/200 I, Capitol Quarter Phase 2, Canal Park, and the Little Red Building. (It was also nice chatting with the folks who correctly guessed that the oddball standing in the middle of the street taking photos must have been me.)
The showy demolition work is now well underway at 225 Virginia/200 I, and if the few shots and renderings on the project page aren't enough for you, you can do a virtual walk around the block to see which walls and windows are blown out at this point and to compare the current images with their "befores."
No time is being wasted at Capitol Quarter, where framing has now wrapped around from I to 3rd to K Street on the first block of Phase 2. You can take a "walk" around that block, too, if you haven't lately, or wander through the project page, both of which have plenty of images of the old Capper public housing buildings that were on this block for a very long time. I also added to the database some photos of what will eventually be the intersection of 3rd Place and L, once the new street gets built through its second block south of K. If you're big on old Capper photos, there's a few "before" images of L Street buildings in that sent that haven't been displayed on the site before now.
If photographs of fences are your thing, take a "walk" around the Canal Park perimeter, to see many pictures of the "traffic control" now in place in advance of the start of construction on the park (presuming it ever actually comes). Those barriers are going to put a crimp in some of my standard shooting locations for the next year or so, including where I've stood for the past eight years to take photographs of the Little Red Building, which in its new incarnation is now more of a brick red than the beet red it used to be. ANC commissioner Garber posted on Friday that the roof is going in over the next few days, at which point work on the interior can begin, as it slowly progresses toward becoming "Lot 38 Espresso."
Remember that the Click to see all available photos of this location.icon on any page gets you to the full batch of photos I've taken at any location (which, since I'm getting into the eighth year of doing this, can be kind of voluminous in some spots).
(I know that It seems kind of odd to still be posting photos when so many readers now live in the neighborhood, which of course wasn't always the case. But it's my schtick, and so I continue onward! Plus. there are plenty of people interested in Near Southeast who don't wander around every day--or maybe some of the residents don't know what these spots used to look like before....)
 

Just released from the Navy:
"Gates at the east and west end of the waterfront promenade (Riverwalk) at the Washington Navy Yard (WNY), will open for limited public access on Apr. 1, 2011. The WNY Riverwalk terminates at the Yards Park to the west and 11th Street SE to the east.
"The gates at both ends of the WNY Riverwalk will be open during base working hours, 8:00 a.m. to 5:00 p.m., Monday through Friday excluding Federal Holidays. Exceptions to these operating hours will be made when restricted access is necessary to accomplish Navy operations. The Navy may block or restrict access without notice for safety or operational reasons.
"The Display Ship Barry, located along the WNY Riverwalk, will be open to the public with access directly from the Riverwalk when the Riverwalk is open. The Display Ship Barry and the Navy Museum can be accessed through the WNY during normal hours when the Riverwalk is closed. Holders of valid Department of Defense (DoD) identification cards will be able to enter the WNY via turnstiles along the Riverwalk during operating hours. Access for non-DoD identification card holders will continue to be via the WNY visitors center, located at the intersection of O Street and 11th Street SE."
 

(Continuing along with my posts on Monday night's ANC 6D meeting....)
StonebridgeCarras, the folks who are morphing the old Star/Post Plant at 225 Virginia into a new DC government office building at 200 I (I'm still fighting that address) came to ANC 6D looking for support for a public space permit covering the landscaping, paving, sidewalks, and other exterior improvements.
There are a number of large oak trees surrounding the building, and Jane Mahaffie of Stonebridge said that they are "going to great lengths" to save as many of them as possible, although arborists have already determined that two or three of them need to come down. (At least one of those trees, however, will be dried out and reused in the rebuilt structure.) You can see on the graphic at right (see larger version) the larger trees that denote which ones are expected to be saved. Of course, when CSX digs its trench, the trees along Virginia Avenue may not end up being quite so lucky....
The landscaping will not be on too grand of a scale, since the city will be responsible for maintaining it and isn't exactly rolling in dough.
What is also depicted on this drawing that hasn't always been obvious in the renderings of the new 200 I is the parking deck planned for the southEAST corner of the block. It's a one-story deck, with an entrance on 3rd Street for visitors to park on the roof of the deck, and another entrance on I Street for DC government staff to enter and park either on the lower part of the deck or in the basement of the building. (There are upwards of 200 total spaces, if memory serves.)
But, as anyone who has walked north on 3rd Street to the freeway can tell you, there is a considerable rise in the grade of the street, so while the parking deck will look one story tall down at I Street, it will actually be at the same level as the street up closer to Virginia, as you can see in this rendering of what the deck and its "dense buffer plantings" will look like as seen from 3rd Street:
The larger version of the above graphic has additional renderings of the parking deck as seen from 3rd and from I, showing how the designers are attempting to hide the deck as much as possible, especially as time goes on and the plantings mature.
The ANC voted 7-0 to support the public space permit.
If you haven't been following along, 200 I is expected to be home to the Office of the Chief Technology Officer, the DC Child and Family Services Agency, and the Commission on Arts and Humanities. Its new entrance will be on I Street, facing Canal Park, and the lobby will include a gallery of artwork that will be open to the public (without having to go through security). There also may be some small "incubator" service retail in the southwest corner of the building. The developers are going for LEED Gold certification, and 50 percent of the new roof will be "green." Exterior construction is expected to be completed by January of 2012, with move-ins expected to happen in late spring of '12. You can see renderings of the lobby and more photos on my 225 Virginia project page.
(And, one more 6D recap to come.)
 

I know one of my big complaints about St. Patrick's Day festivities has always been that there just aren't enough civic forums included. But that's not the case this year!
* This is late notice (my bad), but on Thursday night (March 17) DC Water (aka WASA) is holding a Ward 6 Town Hall Meeting to talk about all manner of water- and sewer-related issues. Both Tommy Wells and George Hawkins (general manager of DC Water) will be there, and no doubt one of the topics of discussion will be the multi-billion-dollar Clean Rivers Project to fix the combined sewer overflows that result in sewage emptying into the Anacostia River. I have done a wonderful job of avoiding writing about this project, and I will do so for a while longer, except to note that it will eventually mean construction work along M Street east of 9th and along Tingey Street, but not before next spring (and continuing until 2017), so I have a little more time to get with the program. The town hall is from 6:30 to 8 pm at Watkins Elementary, 420 12th St. SE.
* Unfortunately, the DC Water town hall is scheduled at the exact same time as the "First Semi-Annual DC Circulator Public Forum," which is being held right in the neighborhood at the Courtyard by Marriott at New Jersey and L SE, and which is expected to include a discussion of a possible expansion of service on the Union Station-Navy Yard line, perhaps by expanding hours of operation to 9 pm Monday-Saturday during baseball season. (There is, however, no truth to the rumor that the route is going to be renamed the Dubliner-Molly Malone's line.)
 

(There were a number of Near Southeast-related items on Monday night's ANC 6D agenda, so I'm going to break up the reports into a couple of posts. One or two more to come over the next day or so.)
Representatives of the Capitol Hill Day School came to 6D to ask for the commission's support on a zoning case that would allow the school to erect "modular classrooms" on the empty community center lot at 5th and K while their current location at 2nd and South Carolina undergoes renovation. As I wrote last week, the school would occupy the lot starting in June, with the intent of returning to the Dent School building in January 2012. There were a few additional details given last night:
* CHDS has secured 29 spaces in the big parking lot at 7th and L for faculty.
* They will be requesting from DDOT that six of the street parking spaces (half the block) on the east side of 5th in front of the lot be changed to No Parking from 8 am to 6 pm weekdays, to act as a drop-off zone for parents and buses. They will ask parents coming from north of the freeway to drive south on 4th, turn left on L, and then turn left on 5th to pull into one of their four drop-off spots, where kids are guided quickly out of the cars. (You can see this in operation at 2nd and South Carolina.) Their school buses would also operate in those spots during the day. But the spaces would be available for resident parking after 6 pm, before 8 am, and on weekends, with a "minimal" number of nighttime events beyond a Back to School night.
* Headmaster Jason Gray said that the school wants to be "as minimally disruptive as we can, be good community members, and leave the site better than we left it." They'll be landscaping the site (and fencing it), and will clear the lot and clean it up once they move out.
* In return for using this DC Housing Authority lot, CHDS has agreed to fund three scholarships for public housing children to attend the school, though details on how the students will be picked are still being worked out.
The commission voted 6-1 to support the zoning request, with only Commissioner Roger Moffatt voting against. The BZA will hear the case on May 17. If you want to know more about the CHDS renovation project, you can check out their wiki, and they are also keeping a blog on the construction project.
There was also a general update on the progress of the overall Capper redevelopment given by David Cortiella of DCHA. Some bullet points:
* Construction on the second phase of Capitol Quarter is actually a bit ahead of schedule; Cortiella said the first move-ins are scheduled for July/August, but I've heard from EYA that it may be more like May/June.
* DCHA is in the process of building a new lot for DPW so that it can move out of the New Jersey & K site; Cortiella expects this to happen by August, at which time site remediation and demolition can begin, working toward the building of I Street through to New Jersey Avenue (along with all manner of infrastructure work). This would take about 18 months.
* The financing for the mixed-income apartment project on Square 882 (just south of the Marine barracks) has apparently proven difficult to secure, and is still being worked on, with Cortiella saying he "expects" it by the end of the year.
* The community center's financing is dependent on whether a second bond can be floated to get the rest of the $55 million PILOT monies; the $29 million bond sold in 2010 is paying for infrastructure work around Canal Park and the DPW site, and by spring of next year it should be known whether this second bond will be happening.
* The entire project is still on track to eventually provide the 707 units of public housing that were on the site before redevelopment; about 337 have already been delivered.
(Plus, it wasn't mentioned at the meeting, but there's a lottery of up to 11 Capitol Quarter workforce housing units coming March 26.)
 

EYA has announced that up to 11 houses at Capitol Quarter are being made available at workforce-level prices in another lottery, the third since Capitol Quarter began being developed in 2006. Household income must be under $119,025, and there are a lot of qualifications and requirements to meet, requiring a visit to the sales office before March 20 in order to be certified as eligible. The lottery will be held at 10 am on March 26 at the sales office at 4th and L, SE. (There may be fewer than 11 houses, since former residents of Capper/Carrollsburg are given an opportunity to purchase homes in this program before they are made available.)
Read the financing program document or contact EYA for more details.
Comments (0)
More posts: Capper, Capitol Quarter
 

Very quick post to note that the agenda for Monday's ANC 6D meeting is now posted. The bevy of Near Southeast items include:
* An update on the Capper Hope VI redevelopment from the DC Housing Authority;
* The zoning case to allow Capitol Hill Day School to erect temporary structures on the Community Center lot starting in June while their school undergoes renovation;
* A Yards zoning amendment that would allow Forest City to "temporarily" (not more than 20 years) include office space in the second floor of the Lumber Storage Shed at the Yards Park, which would allow FC to move their offices there;
* And an update on "landscaping plans" at 200 I Street (still known in these parts at 225 Virginia Avenue).
There's also a lot of other items more of interest across the way in Southwest, although the items on "Safeway 'Customer Service' Procedures" and some others might be of note to Near Southeast residents as well.
Also, I might point out this item from the agenda, if you haven't noticed it before: "Community Concerns -- ANC6D residents may address the Commission for three (3) minutes, provided they have called the ANC office at 202-554-1795 at least forty-eight (48) hours in advance of the meeting to supply the topic and request a time slot. (Statements must be submitted in writing for record purposes.) " The Community Concerns slot is now at the very end of meetings, however.
The meeting is at 7 pm at St. Augustine's Episcopal Church, at 600 M St., SW.
 

I haven't been there myself, but readers are reporting via Twitter and Facebook that Harry's Reserve Fine Wine and Spirits is now open for business on the southwest corner of New Jersey and I, in the ground floor of 909 New Jersey. It's been almost 10 months since the owners first signed a lease and started the liquor license process, but it's now the neighborhood's first outlet for the hard stuff in a number of years. It's also the first retail space at 909 New Jersey to be occupied, and the first new retail offering in Near Southeast since Justin's Cafe opened last April.
This is apparently a bit of a soft opening (so be gentle!), with a true "Grand Opening" coming in two weeks or so. The owners are the same folks who own Capitol Hill Wine and Spirits in the 300 block of Pennsylvania Ave., SE, and who owned the Harry's liquor store in the old Waterside Mall in SW. When the owners met with ANC 6D's ABC subcommittee, they indicated that "they would sell beer, wine, and liquor, as well as milk, sodas, juice, cheese, and other "quick stop" items, and are very much wanting to emphasize that this is going to be a 'community' store, with higher-end products, wine tastings, and other offerings beyond what people normally think of when they hear 'liquor store.'"
I will get down there myself to check it out if the rain ever stops, but if you've paid a visit, let us know in the comments what's on the shelves and any other impressions.
 

When this photo popped up late Tuesday, it seemed like maybe Harry's Reserve at New Jersey and I would be open today, but we're hearing now that it'll be "a day or two," with a grand opening to come in two weeks. In the meantime, everyone's watching 2nd Street between I and M and reporting in about No Parking signs and stakes in the ground as construction on Canal Park seems to get ever closer. So, I guess I have to come up with something to post.
* With all the land now in hand that they were eyeing on Square 906, the National Community Church has filed for a raze permit for the old Miles Glass building at 8th and Virginia, says WBJ. Although the site is within the Capitol Hill Historic District, that in and of itself may not be an impediment to the building being torn down, the article says, since it was constructed in 1963 and "the vast majority of buildings deemed historic on Capitol Hill were erected prior to 1945." Not that any razing will happen anytime soon, but I'm still glad I went and got a bunch of new photos of it last week. (Though I still prefer the photo at right, from my first photo trek in January 2003, when the Miles Glass sign was still there.)
And, in his blog post about the final land purchases, NCC's Mark Batterson tells a story about how the acquired the car garage at 7th and K, given that the owner had refused all previous offers: "On September 15th our staff went over to the property and we laid hands on that auto shop. It felt like an impossible prayer, but we prayed for divine favor. [...] Then on January 15, four months to the day after we prayed on the property, we got a contract."
* Meanwhile, on the south end of the Saints and Sinners block, it looks like the 8th Street Beer Garden will be back in front of the Historic Preservation Review Board on March 24, at least according to the current agenda. At last month's meeting, the designs were described as being "very close," but revisions were requested and board members voted to look at them one more time. It sounded like some of the "busyness" was going to be simplified, so it will be interesting to see the revisions.
(I will say my mea culpas and admit that I sat on these links for way too long because I had grand dreams of getting project pages done for both the NCC and Beer Garden undertakings, but that hasn't happened. Yet.)
 

With an instruction to residents to Please Don't Panic, I'll pass along the news that Onyx on First, the 266-unit apartment building at 1100 1st St. SE, is up for sale. With a brochure touting "Excellent Transportation Infrastructure, Phenomenal Employment Opportunities," and "Shopping and Entertainment Options Abound," the sellers look to be trying to get in on what is clearly a rebounding multifamily market in DC.
Apparently there's no price set for the sale, and with a building that's 92 percent occupied with what looks like pretty high average rent numbers, I imagine investors will be taking a close look. The eventual sale (should there be one) could also be an interesting barometer of how "the markets" view the neighborhood. Proposals are due April 14.
The building, originally planned to be condos but converted to apartments during the construction phase, was developed by Faison and the Canyon-Johnson Urban Fund and completed in 2009. It was built the same time as its neighbor 100 M, the office building that recently bought for $57 million in a foreclosure sale. Onyx is on the same block as the New Jersey Avenue entrance to the Navy Yard Metro station, two blocks north of Nationals Park, and one block west of the Courtyard by Marriott that is being bought for $68 million. And, of course, just across the street from the Market Deli.
You can see my Onyx project page for photos and more information.
 

With "Academy Award Movies" having been the winning theme for the Capitol Riverfront BID's 2011 summer outdoor movie series, the BID is now asking people to vote on which Academy Award movies should be screened. The series starts on May 26, and will once again be on Tingey Plaza, at New Jersey and Tingey just behind the USDOT building. (Last year's screening location, the Canal Park footprint, will be unavailable this summer because the locusts have arrived, dogs and cats are sleeping together, and it appears that construction is about to get underway.)
While the movie series isn't being held at the Yards Park (just a smidge to the north of it) the BID is working on an ever-growing list of events that will keep the park hopping through the year:
* Kicking off the slate, there will be a Family Fun Day on April 2 from 11 am to 4 pm, in conjunction with the National Cherry Blossom Festival. According to the press release, activities at the free event will include sake tasting and a Japanese beer garden by Mie N Yu, lantern making, sushi from Nooshi Sushi, a moonbounce, and more. (Then everyone can take a leisurely walk down M Street to the Southwest Waterfront for the Fireworks Festival, which actually starts at 1 pm and runs until the fireworks kick off at 8:30 pm.) This is also the day of the first Saturday home game of the year at Nationals Park, just two blocks to the west, starting at 1:05 pm against the Braves.
* Sensorium, the "culinary and sensory experience" announced a while back, starts its multi-week run on April 12.
* While the summer movies will be on Thursday nights, the park will also host a free summer concert series on Friday nights from 6 to 8 pm, kicking off on May 13 and running through August 19. This will be in addition the the lunchtime concert series that the BID has run for the past three years, and is expected to feature music ranging from jazz and blues to rock and reggae. (If you're a food provider and you want to serve at the concerts, here's the RFP.)
* July 9 will see MetroDash, the "country's premier obstacle race series," which includes obstacles such as tire flips, rope swings, 15-foot cargo net climbs, wall jumps, monkey bars, the "strongman shuffle." You can sign up here (if you dare), though the web site doesn't seem to be responding right now.
There are also plenty of private events already on the park's calendar, so if you were thinking about throwing your own shindig there, you won't be alone.
UPDATE, 3/20: According to their web site, the May 7 DC Music Fest has been cancelled, "due to lack of funding and sponsorships."
 

A Historic Landmark nomination was submitted on Friday for the Market Deli at 1st and L SE, according to 6D07 rep David Garber. Calling the nomination "potentially controversial" (perhaps remembering this comment thread from a few months ago), Garber says: "I am 100% pro-development, but stand by my support of this because I think saving pieces of our history will make our neighborhood stronger and more valuable in the end."
He describes the "humble" building as the only remaining wood frame corner store in existence south of the freeway. (The brick building next door, where the Market Deli operated in the last few years of its existence, is not part of the nomination.) He also says it "represents the scale and the history that our neighborhood had for most of its history until very recently." He also says that he did not submit the nomination himself, though helped prepare it (but doesn't say who did submit).
The building, constructed in 1885, is currently owned by Akridge (along with the rest of the block's frontage along 1st Street). There has been no public information on what Akridge plans to do with the block, but raze permits were filed for the Market Deli building(s) and the other buildings on the north end of the block earlier this year, which presumably is what kick-started this move. You can read about the city's Historic Landmark designation process at the Historic Preservation Office's web site. Readers may recall that the St. Paul's church at 4th and I received a landmark designation in November.
A slew of photos showing the Deli unchanging in the face of nearby development can be seen in my archive.
UPDATE, 3/7: Here is the nomination form, submitted by Hayden Wetzel of "Historic Washington Architecture."
UPDATE, 3/11: The hearing date at the Historic Preservation Review Board has been set for April 28; here's the hearing notice.
 

DDOT has announced the "First Semi-Annual DC Circulator Public Forum," with Near Southeast residents hitting the jackpot since it's being held at the Courtyard by Marriott at New Jersey and L, SE. It's scheduled for Thursday, March 17, from 6:30 pm to 8 pm, and the release says it will cover topics "including potential changes to the span of the Union Station-Navy Yard route."
In subsequent tweets over the past few days, the Circulator folks have expanded on that, saying that they'll be talking about extending the hours on the route until 9 pm Mondays through Saturdays during the baseball season (April-September), and that it may be paid for by ending the weekend-only service on the Mall. (Other tweets hint that the National Park Service may eventually "support" a Mall route using Madison and Jefferson drives.)
They asked for feedback: would there be support in the neighborhood for running the buses until 9 pm? Is there another service improvement you'd rather see in place of that?
 

Tucked away in today's DC Register is a zoning request by Forest City Washington to allow the second story of the currently de-skinned Lumber Storage Shed at the Yards Park "to be used for general office purposes, on an interim basis, for no more than 20 years." The filing says that Forest City wants to temporarily relocate "in order to facilitate the leasing of the ground floor and to finance the building's restoration."
The intention has been for the shed to be given glass exterior walls and be a retail space--this new plan would still include ground-floor retail (in a very picturesque location at the Yards Park, right by the 3rd Street Plaza and the overlook). There are two other retail pavilions planned for later phases of the park as well, on the open spaces just to the east of the shed.
 

I don't have a lot of firm details yet, but: Apparently the Capitol Hill Day School folks, who have been searching for "swing space" to move to during renovations at their Dent School building at 2nd and South Carolina, are negotiating with the DC Housing Authority to set up modular classrooms on the vacant lot at 5th and K that was once and may some day again be the Capper Community Center.
If the deal comes to fruition, CHDS would occupy the lot for about six months, starting in June, with the plan of moving back to their renovated home in early January. What other facilities they might use in the neighborhood have not yet been firmed up, though it's possible they may negotiate the use of some space at Van Ness Elementary.
A Board of Zoning Adjustment case has been filed, though a hearing date has not yet appeared on the BZA calendar.
A final agreement is still pending, so more information will be available when that's done.
Comments (0)
More posts: Capper, Community Center
 

The framing of the next batch of townhouses in Capitol Quarter's second phase continues, and so I headed out to get an updated batch of photos at 3rd and I (which also happen to show the buzz around 225 Virginia/200 I, as workers are prepping to take down the exterior walls, perhaps starting next week I was told).
But it isn't just houses being built--a few weeks ago, curbs and asphalt were put in for the new 3rd Place, a north-south street between 3rd and 4th that will run between I and L streets. (You can see it, although it's unmarked, on this map.) It's the first time I've had to add a street to my Photo Archive, but it seems to have worked, and I not only have photos I took today, but whatever photos I could find from deep in the archives that by chance ended up being taken in the right location.
You can see my photos at both 3rd Place and I and 3rd Place and K and perhaps see some 2004-2006 photos you haven't come across before. These two shots are looking north-northeast at the new 3rd Place & K intersection:
(The street isn't actually open yet, though, since it goes right through the block that's currently under construction.)
I also took a lot of pictures along 11th Street, ostensibly to document the progress on the 11th Street Bridges, but I didn't actually go anywhere close to the waterfront, so you have to be satisfied with various other photos that show progress if you squint at them.
And I grabbed a lot of other shots around Square 906 today (7th, 8th, L, Virginia), since my archive is woefully lacking in images of that block, and things will be a'changin' around there before too long. You can see them as part of the display of the 151 pictures (eek) I've posted today, but I'll have something a bit more targeted within the next few weeks. You can also, as always, browse the photo archive at your own speed, using the map or the search boxes to see the intersection(s) you're interested in.
As for additional construction photos perhaps in the offing, a reader reports that No Parking signs have gone up along Second Street, indicating that parking will be prohibited 24 hours a day starting on March 7 for approximately 15 months. Is a certain park about to see some action?
 

I'll ask everyone to contain themselves as I bring the news that the city has posted its proposed tax assessments for 2012, and the tally for Near Southeast's properties as I calculate it comes to around $5.99 billion, a whopping 0.001 percent lower than last year's $6.001 billion proposed value, a number which was then revised down thanks to landowner appeals to a final 2011 number of about $5.81 billion.
I've pulled together a chart of the assessed values of the neighborhoods' shiny new/ish office buildings and non-DCHA non-condo multi-unit residential buildings, showing their 2011 proposed assessment, along with the final 2011 number and today's new 2012 proposed number. The proposed 2012 valuations for this specific sub-group of properties totals $1.77 billion, which is up a tad from the $1.75 billion proposed for 2010--but which ended up being dropped to a $1.58 billion final 2011 valuation after appeals.
The expansion in the neighborhood's tax base in terms of new residents has become clear as well: Looking at the numbers for the Capitol Quarter and Velocity condos parcels: in 2007, before construction got underway, they were assessed at around $92 million; for 2012, the proposed value is around $282 million. (It should be noted that Capitol Quarter's taxes don't go into the general fund, because owners there actually are governed by a Payment in Lieu of Taxes [PILOT] structure that uses the tax proceeds to pay down the debt on the bonds used to finance the development.)
As for the number everyone always wants to know about: Nationals Park remains valued at $999,982,800, unchanged since the first time the ballpark's assessment appeared, back in 2009.
Yearly Near Southeast Proposed Assessments
2002: $221M *
2003: $428M *
2004: $642M
2005: $771M
2006: $896M *
2007: $1.78B
2008: $2.54B
2009: $4.47B
2010: $6.01B
2011: $6.00B
2012: $5.99B
* Includes a mix of proposed and revised assessments
And it's likely that the neighborhood will continue to be home to the most valuable privately held property in the city, as the US Department of Transportation HQ has been assessed at $662.7 million, about $73 million higher than the final 2011 number that made it the most valuable property in the city in 2010, according to WBJ.
I keep a database of neighborhood assessments going back to 2001, although it only took about eight years for me to grasp the concept that the proposed numbers released in March aren't always the final ones, so it was just in 2010 that I started tracking both proposed and year-end numbers. (Though it must be said that during the Bubble Years, landowners weren't quite so vigorous about challenging their assessments.) Plus for a long time I got the years wrong when referencing: numbers posted by the city in one year are labeled as being the proposed/actual value for the following year. And some tax squares inside my strict Near Southeast boundaries escaped my attention for a few years early on. But I don't think the numbers are so out-of-whack that they can't be compared in a general way, as long as you keep the caveats in mind; with that admonition, check out the table at right for the yearly numbers.
And, of course, it should be noted that since large portions of the neighborhood's land is owned by the Feds (*cough*Navy Yard*cough*), there aren't taxes being paid on every dime of these assessment numbers.
If your envelope hasn't already arrived, or if you want to see how your number stacks up against your neighbors, you can search the assessments database yourself.
Comments (0)
More posts: assessments
 

Last night the National Community Church held its "All Church Celebration" at the Lincoln Theater, and, while I wasn't there for the "big announcement," I do know that lead pastor Mark Batterson told the assembly that the last of their land acquisitions on Square 906 (bounded by Virginia, 7th, 8th, and L) have been finalized.
As I've been conjecturing, this includes the auto garage on the corner of 7th and Virginia. But it also includes a contract for the two small apartment buildings at 716 and 718 L Street, just west of the alley. Batterson tells me that they are leasing back the garage to the current occupants until July so that they can find a new location.
Combined with the Miles Glass site that started it all and the empty lot on 7th, this now gives NCC (the folks behind the successful Ebenezers coffee house near Union Station) over 26,000 square feet of land on a somewhat T-shaped footprint on which to build their combination coffee house/performance space/offices. As I've mentioned previously, Batterson wrote on his blog in mid-February that they are now "full-steam ahead with designs" now that the footprint is finalized, and that he is "looking forward to initiating meetings with Historic Preservation, ANC, Riverfront Bid, Barracks Row Main Street, Office of Planning, etc." It wil be interesting to see if the zoning and height changes that business owners are looking for along lower 8th get through, and whether NCC would be taking advantage of being able to build a bit higher as a result.
Of course, this isn't the only new activity on Square 906, since it's on the south end of the block where the beer garden at 8th and L is supposed to be going in once the design gets through its historic preservation review, a process NCC will have to undergo as well since the block is within the Capitol Hill Historic District. This Saints and Sinners stretch of 8th is definitely going be a focus of activity in 2011.
 

At a meeting Monday night, DC Public Schools announced that, despite the hopes of the parents of small children who have moved to Near Southeast, Van Ness Elementary will remain closed for a few more years, perhaps opening by the 2014-15 school year. I wasn't at the meeting (was watching McEnroe, Lendl, Sampras, and Agassi at Madison Square Garden), but I can pass along the handout from the meeting (page one and two) that provides the rationale and data behind the decision.
The next open question is whether DCPS will expand the boundaries of Tyler Elementary at 10th and G SE to allow Near Southeast children to attend, rather than continuing to send them to Amidon-Bowen in Southwest, a situation which has many parents unhappy. Also, parents' groups have meetings scheduled with various city officials in the coming days to discuss the situation.
Sorry this is brief; if you were at the meeting, please feel free to use the comments to highlight anything said that isn't in the handout. You can also read my previous Van Ness entries for more background.
 

Just crossing the wires: "Chesapeake Lodging Trust announced today that it has entered into a definitive agreement to acquire the 204-room Courtyard Washington Capitol Hill/Navy Yard located in Washington, DC for a purchase price of $68 million, or approximately $333,000 per key." The hotel, at New Jersey and L, SE, opened in spring 2006 along with its next door neighbor, the Capitol Hill Tower co-op; both were developed by Valhal Corp. (whose principals then formed Ranger Properties in 2007). It will apparently remain a Courtyard; no word of what if any impact this sale would have on Capitol Hill Tower.
 
2591 Posts:
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 260
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.