Since January, 2003
            
 Sliding from Before to After

The DC Zoning Commission has scheduled a public hearing on Dec. 8, 2005 for the Florida Rock project. According to the hearing notice, Florida Rock is requesting approval of a second-stage Planned Unit Development as well as a zoning map amendment (are your eyes glazing over yet?), to allow for a nearly 1.1-million-sq-ft mixed use project, just south of the new baseball stadium. The project "would be developed as three separate buildings, but would visually appear as four buildings as the westernmost building is separated into two towers above the 32-foot elevation"; the buildings would be set back from the Anacostia River no less than 75 feet. The project's footprint spans not only the area marked on my map at right, but under the Frederick Douglass Bridge and all  the way down into Southwest  to S Street (from South Capitol Street to the river) toward Buzzard's Point. Given the intense interest in the baseball stadium having riverfront access, as well as the ongoing planning for rebuilding and rerouting the South Capitol Street bridge, it will be interesting to see how the Florida Rock project is designed. (The notice mentions that the building heights would taper down to 92 feet at 1st and Potomac.) Project architects Davis Buckley have a few small designs of the project on their web site, but these were done long before the stadium popped up on the radar screen.

Comments (0)
   
 
 More About Florida Rock
 All posts: Florida Rock, zoning

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Inching from Quarantining: Serious workplace accident on the ground this morning at the Chemonics construct...
MJM on Inching from Quarantining: Welcome to the neighborhood Pivot Physical Therapy. Its located behind Sprint (w...
VelocityChris on Inching from Quarantining: How quickly Juice Laundry and Whaley's were replaced bodes well!
conngs0 on Inching from Quarantining: 202, I couldn't agree more re the GNC. It's tough though - retail seems to need...
202_cyclist on Inching from Quarantining: The GNC on Tingey Street is closing. I am sorry for the employees who are losin...
tmich93 on Inching from Quarantining: CVS on the corner of I and Half seems like it's nearly completely stocked. I'd a...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/25/20
1200 B/O SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 06/23/20
1200 B/O NEW JERSEY AVE SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 06/20/20
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/20
800 B/O SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/14/20
400 B/O M ST SE   THEFT
Shoplifting
 06/12/20
1000 B/O M ST SE   ROBBERY
Unarmed Carjacking
 06/09/20
UNIT B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/07/20
1200 B/O 1ST ST SE   BURGLARY
Burglary Two
 06/03/20
200 B/O M ST SE   BURGLARY
Burglary Two
 05/30/20
900 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/27/20

Recent Issued Building Permits Archive  
150 I ST SE   
06/09/20 
SQUARE 737, LLC C/O WC SMITH / MIMI TRIGGER; MIMI TRIGGER
SP1900051 / CONSTRUCTION
Installation of (2) prefabricated hot tubs on the roof.
300 M ST SE   
06/02/20 
FEDERAL CENTER LP / null
P2006421 / SUPPLEMENTAL
   
06/02/20 
FEDERAL CENTER LP / null
M2002616 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
06/10/20 
CXS TRANSPORTATION INC / ;
P2006604 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/10/20 
SQUARE 742 LLC, C/O SPAULDING & SLYE/STE 100, / PAUL WHITLEY
AN1900284 / CONSTRUCTION
PROJECT CONSISTS OF: REMOVING: (2) EXISTING EQUIPMENT CABINETS, (3) EXISTING ANTENNA'S, (1) EXISTING RRU'S AND ANCILLARY EQUIPMENT / CABLE AND INSTALLING: (6) PROPOSED ANTENNA'S, (3) PROPOSED RRU'S, AND(2) PROPOSED EQUIPMENT CABINETS ON AN EXISTING TELECOM FACILITY
1105 NEW JERSEY AVE SE   
06/03/20 
KRISTA ASHSHAHEED / null
E2008140 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
06/03/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ;
P2006475 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
06/02/20 
UNITED STATES OF AMERICA / ;
P2006429 / SUPPLEMENTAL
125 O ST SE   
06/05/20 
DISTRICT OF COLUMBIA / BILL SAUNDERS; TBD
B2006271 / CONSTRUCTION
BFPE International will furnish the fire alarm equipment, shop drawings, product data and calculations for the new fire alarm devices being installed at DCWater Main Pumping Station, Washington, DC 20032. This project will be a one for one replacement of panels, addressable and notification devices.
   
06/09/20 
DISTRICT OF COLUMBIA / null
E2008311 / SUPPLEMENTAL
227 TINGEY ST SE   
06/04/20 
UNION INVESTMENT REAL ESTATE GMBH / null
E2008212 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.