Since January, 2003
            
 (a random before-and-after moment)
February 11, 2007
January 5, 2019
South Capitol at K, Looking East-Northeast (see more)

It would be terribly hokey for me to say something along the lines of, "It's almost Halloween, and the neighborhood is appropriately decked out with skeletons." So, I won't. But there is a whole lot of construction going on, counting not only nearly finished buildings, but also buildings getting their faces put on or heading toward topping out or now "going vertical" below ground level.
I'll go in order from newest to oldest, starting with peering down into holes that you might not be looking into yourselves.
Three residential projects that began excavating in the spring are already starting to climb upward, as you can see in the above photos from 1000 1st Street and the Maren at Florida Rock. Tishman Speyer's mystery residential project that covers all of what's known as Square 696 is a hybrid, with some excavation still underway while the eastern half is now starting to rise. (and no, we still don't have renderings.) Then there's phase two of One Hill South (Two Hill South? One Hill South Two? Return of One Hill South? One Hill South, Electric Boogaloo?), where digging is being hampered by complaints of fumes emanating from the site's past life as a gas station.
Next we turn to the neighborhood's EIGHT projects that are above ground but not yet topped out. (I could call it six, since there are two projects with two buildings going up concurrently, but let's call an eight an eight.)
Let's start with residential projects The Garrett at 2nd and I, Parc Riverside Phase II at Half and L, and the second phase of Novel South Capitol at 4 I, which was kind of a shocker to see go up since it was never really announced that the entire project would be under construction at once:
I'll note that the photo of the Garrett is a bit of a triumph, because it's the first one I've gotten from the northeast, now that the wrapping up of tunnel construction has given me some sidewalk access to the intersection at 2nd and H. (Which hopefully will be open completely by Oct. 18, the Whole Foods Day of All Days.)
Next, let's wander down to the Ballpark District, where the National Association of Broadcasters headquarters is a whisker away from topping out and its sibling the Avidian condo building is now well visble. One block away, 1250 Half is in its final minutes of not being completely above ground, as the portion closer to N Street is now right even with the street, while its northern portion has been skeletoning for quite some time. And at 3rd and Tingey, the combo project of the Thompson hotel and the Estate apartment building are beginning to change the feel of the western side of the Yards Park.
{Pant, pant.}
Now, a quick look at the buildings getting their faces on, since this is the stage when everyone is pretty much tapping their toes and waiting for the projects to be finished already. (There's a section of Virginia Avenue that qualifies for that, too.) May I present West Half at Half and N, the Harlow mixed-income building at 3rd and L, the Bower/Guild condo/rental buildings, and the new DC Water headquarters.
To wrap it up, there's one additional ghostly building to keep an eye on, though I don't wish to be flippant about it. Ward 6 councilmember Charles Allen is holding a hearing on Oct. 25 about the fire and response, for those interested.
And that's "it." Ha. Ha. I imagine the next major update will be in December, when I will spend most of the time complaining about how the low sun angle and a decade's worth of construction has made it impossible to take photos unruined by shadows. I may have to (gasp!) go out on cloudy days until spring.
Comments (60)
   
 
 More Recent News

JDLand.com Home

Comments

jdc says: (10/4/18 3:54 PM)
Maybe it's just me, but as much as south Half St. is being changed by all of those buildings going up, the most visually dramatic change is the construction at Yards Park with the hotel/apartment buildings.


JD says: (10/4/18 3:56 PM)
We have an official web site and social media presence for The Guild: link


Marc says: (10/4/18 4:33 PM)
Half Hill South!


RMP says: (10/4/18 4:39 PM)
In the picture of the Guild from Lot O, what is the thing that's partly covered in blue tarp in between the two buildings? Is that going to be the main entrance? I thought the main entrance was going to be on 4th, but maybe not.


JD says: (10/4/18 4:55 PM)
I think that's the walkway between the two towers of the Guild. If you look in between them, you see glass that I think is a passageway. Just looks like they are still working on the ends that connect to the towers.


David Garber says: (10/4/18 6:09 PM)
Omg. You leave for a year and the neighborhood completely evolves. Love it. :) Can't wait to see it all in person (when it's even further changed...).


Ampersand says: (10/4/18 6:16 PM)
Just want to mention that I've already eaten at Wiseguys three times.


JES says: (10/5/18 1:07 AM)
Is it odd that Avidian isn't selling yet? Didn't the Bower start selling well before reaching street level, or am I misremembering that?


RMP says: (10/5/18 8:16 AM)
The Bower started taking reservations when it was up to about floor 3 or 4 and didn't start signing actual contracts until it was about topped out.


CJBabyDaddy says: (10/5/18 9:21 AM)
@RMP re: the Guild — JD has it right. The Guild address is 1346 4th Street. (The Bower is 1300.) The Guild entry is under the bigger of the two metal canopy frames on 4th. The Guild entry has gray bricks on either side. There will apparently be a 3-story tall atrium/passageway connecting the two towers of the Guild.


CJBabyDaddy says: (10/5/18 9:42 AM)
@RMP re: the Guild — P.S.: One will be able to enter the Guild lobby/atrium/passageway from the courtyard, in addition to the 1346 4th Street entry. If I were any good at such things, I would include a link to some of the Googleable (all apologies to He Who Looks Down Upon This Site From On High) Parcel O-2 architectural drawings that were submitted for regulatory review a few years back.


RMP says: (10/5/18 10:40 AM)
@CJBabyDaddy interesting. I've seen some renderings but was never really clear what that courtyard was going to look like. If I understand your description then that means that whoever bought the 2nd floor Bower condos facing north has a view of the back of that atrium? That certainly seems less than ideal.


RMP says: (10/5/18 10:41 AM)
**Facing south.


CJBabyDaddy says: (10/5/18 10:57 AM)
On the other hand, the 2nd floor south Bower units to which you refer have relatively spacious private patios.


202_cyclist says: (10/5/18 11:11 AM)
JD-- thank you for the photos but everyone knows the building next to One Hill South is Two Mountain North.


202_cyclist says: (10/5/18 11:12 AM)
@David Garber-- we'll have to arrange an impromptu JD Land happy hour when you return.


202_cyclist says: (10/5/18 1:31 PM)
Here's an update for the lot next to the WMATA chiller site that jdc (I think) and I noticed construction activity a couple of weeks ago.

link


spiritequality says: (10/5/18 5:53 PM)
Any news on the ____?


CJBabyDaddy says: (10/6/18 9:22 PM)
From the article on page 3 of Real Estate section of the October 6, 2018 Washington Post:

“Living there: Capitol Riverfront is bordered to the north by Interstate 695 and Potomac Avenue SE, to the south by M Street SE, to the east by Pennsylvania Avenue SE and to the west by South Capitol Street SW.”

Huh?


CJBabyDaddy says: (10/6/18 9:23 PM)
From the article on page 3 of Real Estate section of the October 6, 2018 Washington Post:

“Living there: Capitol Riverfront is bordered to the north by Interstate 695 and Potomac Avenue SE, to the south by M Street SE, to the east by Pennsylvania Avenue SE and to the west by South Capitol Street SW.”

Huh?


malatesta says: (10/6/18 10:19 PM)
If we take Barney circle as the easternmost point of SoCHill, I guess that's true, but it's a weird way of delineating boundaries.


malatesta says: (10/6/18 10:19 PM)
Wait, no the M St. part is bananas.


NavyYardNittany says: (10/7/18 12:47 AM)
Chain link fence has gone up around the old brick government warehouse on the SE corner of L and Half (can’t acccess the map at the moment to remember the specific property name). Signs say “demolition area use caution”. Assume that means they will begin the tear-down soon. Did I miss any news on that site? Remember it being posted here that the GSA was selling it and that it was purchased by a development company, but nothing more.

As for the boundaries of the neighborhood, has always seemed clear to me that they were the freeway to the north, the river to the south, S Capitol to the west, and 11th Street to the east.


bdj says: (10/7/18 9:20 PM)
@NavyYardNittany. I think that building was bought by Lerner for offices. They're not tearing down the current brick structure, but building up from it and renovating.


JD says: (10/7/18 9:22 PM)
Re: 49 L, there are no real plans yet, but they are for now tearing the roof off and slicing the walls down to 4 feet high. I am guessing it will be a parking lot until plans are in place.


FromTheTurret says: (10/8/18 11:18 AM)
My prediction for 49 L is it will be the new location for the Bullpen. I thought I had heard 25M would begin construction in the off season, although I am not sure about that. And, I heard that the Bullpen would be relocating then and not shutting down. The 4 foot high brick wall sounds like a barrier wall without shipping containers that could offend people who live in the residential buildings north of M.


JD says: (10/8/18 11:19 AM)
Alas, no. 25 M is not starting soon, but it's very strongly rumored that the Bullpen is going to relocate to the two-story retail building expected to start construction before long at the corner of 1st and N where the beer garden has been this season.


FromTheTurret says: (10/8/18 11:25 AM)
Well, alrighty then.


JES says: (10/8/18 1:18 PM)
I don't think the bullpen could ever be at 49 L, given all the residential that it borders. The noise complaints would be never-ending.


spiritequality says: (10/8/18 11:32 PM)
Two stories? Seems positively quaint now. Why not build residential on top?


spiritequality says: (10/8/18 11:32 PM)
Two stories? Seems positively quaint now. Why not build residential on top?


RMP says: (10/9/18 8:34 AM)
The new bike lane on I Street seems to actually be working. I just rode in the bike lane for the 2nd day in a row with no obstructions! 1st Street on the other hand....


UpEarly says: (10/9/18 11:52 AM)
The plastic bollards make a big difference. The westbound land was almost unusable before they were installed.


JD says: (10/9/18 11:55 AM)
There were some complaints on Twitter about the narrowness of the westbound lane, but I think (hope?) that that's because of the loss of the lane on the south side of the street because of the 88 K construction, and should be rectified when the street returns to its full width.


202_cyclist says: (10/9/18 12:56 PM)
@RMP-- I agree, it is an appreciated improvement for the neighborhood. I bike to work several days per week via I Street and I have complained many times about the I Street traffic sewer. The bike lane is significantly better.


Dan says: (10/9/18 2:13 PM)
What's the process for proposing to continue the shifted bike lane across South Capitol? Would be great to have it on the other side of the parked cars all the way to 7th St.


202_cyclist says: (10/9/18 2:33 PM)
@Dan:

Mike Goodno (mike.goodno@dc.gov) is DDOT's bicycle coordinator. Jim Sebastian is DDOT's director of sustainable transportation. I would suggest emailing them. With the new bike lanes as part of the CSX tunnel reconstruction, it would be possible to go all the way from 7th St SW to Barrack's Row via protected bike lanes.


willinrm says: (10/9/18 2:45 PM)
@RMP i have been riding on it too, maybe it was because it was the afternoon, but on my way out i had to swerve around 2 cars parked/blocking the bike lane, and coming back west i had to swerve around another, :( unfortunately they can't block those areas off because it is entrances


RMP says: (10/9/18 3:51 PM)
@willinrm Bummer. I'm pretty pessimistic about bike lanes so I'm not surprised to hear that. The previous iteration of I St was basically useless as the bike lane always had cars in it, same goes for the west side of 1st right now as well. It's frustrating because the intention is good but the execution is often not.


202_cyclist says: (10/10/18 8:13 AM)
JD, cat-lover and time-traveler!

{Sorry, 202, I'm editing out the link, because if people click on it they are going to grind both their browser and the site to a halt! (It was basically a link showing every single photo in the archive on one page.)}


JD says: (10/10/18 2:23 PM)
Don't forget tomorrow's JDLand happy hour, at Mission starting at 5pm. Come on by and say hello!


JES says: (10/12/18 8:00 AM)
Happy hour was fun, we should do it again soon!


CJBabyDaddy says: (10/12/18 10:56 AM)
@JES: Not too soon. Let‘s first see how successful our GoFundMe campaign for JD‘s bail money goes. Was that you who talked her into swinging from the chandelier? Sure looked like all those bouncers underestimated her ground-and-pound game, huh? Good times.


202_cyclist says: (10/12/18 2:01 PM)
Agreed-- the happy hour was great. Thank you for planning.


JD says: (10/12/18 3:30 PM)
Thanks for braving the rain!

Next happy hour, Whole Foods. :)


dude says: (10/13/18 1:47 PM)
There’s a lot of buildings in this neighborhood. Factual statement of the day.


bdj says: (10/14/18 7:55 PM)
Anyone know what’s going on with that Chix on half st? Seems like someone would want to open something there.


JD says: (10/14/18 8:53 PM)
I'm guessing that any place interested in that spot is waiting out all of the nearby construction. Half Street is not especially pleasant right now.


bdj says: (10/14/18 9:45 PM)
Really? You'd think someone would want to be open, especially during the baseball season (not as good of a proposition in offseason).


GarfieldPark says: (10/15/18 12:01 AM)
This is the week we've all been waiting for. Good luck to everyone on Thursday at 9 am! Make sure you (don't) spend your whole paycheck!


202_cyclist says: (10/15/18 7:11 AM)



NavyYardGuy says: (10/15/18 11:19 AM)
I know we spoke about this at the JDland HH last week but when is the soft opening of Whole Foods is this week? I know the grand opening is this coming Thursday.


JD says: (10/15/18 11:23 AM)
@NYG, it's tonight. I imagine there might be some photos posted here afterward.


NavyYardGuy says: (10/15/18 11:41 AM)
@Jdland--Gosh, Is it open to the public or a private event?


JD says: (10/15/18 11:45 AM)
Invite only.


NavyYardGuy says: (10/15/18 12:06 PM)
:(

Looking forward to the pictures.


202_cyclist says: (10/15/18 4:49 PM)
Folks— be careful! The temperature recently dropped below 50 degrees, so that means people are leaving dog crap everywhere on the sidewalk.


202_cyclist says: (10/15/18 5:08 PM)
My math is pretty bad, so I don't know about using fractions for an address but this is pretty significant.

link


202_cyclist says: (10/15/18 5:10 PM)
Also, JD, are you keeping any Amazon II news from us? I think there was someone from the BID leading a tour of the neighborhood to about thirty people in suits today.


Ampersand says: (10/15/18 5:45 PM)
I don't remember which thread I talked about this in, but JUST CALL IT FIRST PLACE FOR HEAVEN'S SAKE

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

202_cyclist on Condos Confirmed: IMPORTANT ANNOUNCEMENT: Folks— if you have a dog, remember to clean up after it...
JD on Condos Confirmed: For about five minutes, yes.
Section314 on Condos Confirmed: Wasn't 1250 Half Street to be known as the Joule at one time?
RDC on Condos Confirmed: Got it, thanks JD
CJBabyDaddy on Condos Confirmed: @RMP: The Twelve12 at 1212 4th Street just tapped me on the shoulder and said, “...
JD on Condos Confirmed: They didn't sell them, at least not outright. Greystar Management is taking over...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/15/19
200 B/O WATER ST SE   THEFT
Theft 2nd Degree (theft From Building)
 01/14/19
UNIT B/O K ST SE   THEFT
Theft First Degree (theft From Building)
 01/12/19
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/11/19
1000 B/O 1ST ST SE   THEFT
Theft First Degree (all Other Larceny)
 01/06/19
1300 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/04/19
900 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
200 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/29/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/28/18
700 B/O L ST SE   BURGLARY
Burglary Two
 12/28/18
400 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/26/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/26/18
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/25/18
300 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/24/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/23/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/22/18
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/20/18

Recent Issued Building Permits Archive  
926 4TH ST SE   
01/16/19 
null / NA NA NA
EHOP19950290 / HOME OCCUPATION
1346 4TH ST SE   
01/11/19 
ALAN OWINGS / SEV HENRY
AH1900404 / CONSTRUCTION
After Hours Work on Saturday (1 / 12 / 2019) and Sunday (1 / 13 / 2019) for the Following Operations Saturday, 1 / 12 / 2019 ---Interior Operations after 7PM Sunday, 1 / 13 / 2019 ---Interior Operations: 7AM-7PM ---Exterior Operations: 7AM-7PM ---Sitework Operations: 7AM-7PM
900 5TH ST SE   
01/02/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MATT HUPPMAN
D1900229 / CONSTRUCTION
the Berg Corporation has a project located at 900 5th Street SE that has suffered a major fire and is considered an emergency job. Twenty percent of original structure was immediately demolished following the fire for safety reasons. The Berg Corporation is now pursuing a demolition permit to remove the balance of the stick built portion of the structure. The following improvements are to ...
1000 5TH ST SE 1ST FL   
01/09/19 
UNITED STATES OF AMERICA / WALTER T JONES
E1903161 / SUPPLEMENTAL
1000 5TH ST SE   
12/27/18 
UNITED STATES OF AMERICA / TANYA HILL
B1902924 / CONSTRUCTION
DGS RENOVATION OF EXISTING WARMING KITCHEN AND FITNESS ROOM OF APPROXIMATELY 900 SF TO BECOME RESIDENTIAL GRADE DEMONSTRATION KITCHEN. RENOVATION OF EXISTING APPROXIMATELY 300 SF OPEN LOUNGE AND SOME DEMOLITION OF INTERIOR PARTITIONS, NEW FINISHES AND MEP. This permit dose not include the Child devolepment center, There work in this area.
   
01/02/19 
UNITED STATES OF AMERICA / null
P1902543 / SUPPLEMENTAL
   
01/11/19 
UNITED STATES OF AMERICA / KASMIN HOLT
AH1900407 / CONSTRUCTION
Work under permit E1903161 on starting at 7pm - 7am.
1005 5TH ST SE   
01/04/19 
ALEXANDRA H HARRIS / HOLLIE MASON
F1800763 / CONSTRUCTION
Requesting permit to add an ornamental black iron fence with gate, not to exceed three feet, enclosing / surrounding front yard area. Installation of the fence may require concrete footings. The fence will be the same as others in the neighborhood and one of the approved transparent designs approved by the HOA; "hairpin" front section and "picket" return sections with ball finials on posts. Sol...
150 I ST SE   
12/24/18 
MILLSTONE CORPORATION / CHRISTINE LONG
B1903052 / CONSTRUCTION
To temp attached material hoist to side of building
328 I ST SE   
01/11/19 
BRIAN HUSEMAN / MELVIN CRENSHAW
B1904212 / CONSTRUCTION
Remove and replace kitchen on 2nd floor and update electrical. Remove and replace bathroom on 3rd floor and update electrical. Total SQFT 248
401 L ST SE   
01/15/19 
MICHAEL R BRICKMAN / SHELBY FIGAROORE
P1902908 / SUPPLEMENTAL
250 M ST SE   
01/07/19 
SQUARE 769 LLC / BRIAN STROTT
SH1900002 / CONSTRUCTION
Support of excavation system for a nine story 188,000 GSF office building with three levels below grade located at 250 M St. SE.
   
01/08/19 
SQUARE 769 LLC / ROBERT HART
AH1900389 / CONSTRUCTION
After hours work permit for installation of DDOT approved TCP jersey barriers.
1200 NEW JERSEY AVE SE 20590   
01/03/19 
JBG/FEDERAL CENTER LLC / SAM HOLLEN
B1900891 / CONSTRUCTION
INTERIOR RENOVATION TO 7TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP, LIFE SAFETY AND NEW STRUCTURAL HANGING PARTITION. 7581 SQUARE FEET. US DOT **LEVEL 2 ALTERATION
71 POTOMAC AVE SE   
01/08/19 
RIVERFRONT HOLDINGS II, LLC / MITCH A. PERMUY
E1902865 / SUPPLEMENTAL
   
01/10/19 
FORIDA ROCK PROPERTIES INC / DANIEL M. NARH
P1902751 / SUPPLEMENTAL
227 TINGEY ST SE   
12/26/18 
JOHN MORIARTY & ASSOCIATES / DFM DEVELOPMENT SERVICES, LLC
AH1900354 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of dismantling the tower crane on private property. Work to take place Friday 1 / 18 – 7pm-10pm, Saturday 1 / 19 – 7pm-10pm, and Sunday 1 / 20 – 10am-7pm.
355 WATER ST SE   
12/24/18 
UNITED STATES OF AMERICA / KAYLIE ROLIN
TN1900028 / CONSTRUCTION
(1) 30 x 70 ft tent (1) 7k watt gas generator
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.