Since January, 2003
            
 (a random before-and-after moment)
November 11, 2004
July 11, 2018
3rd at K, Looking East (see more)

It took 27,000 steps and 1,600 photos for me to thoroughly photograph the status of the neighborhood's current construction projects--but I was up to the task, albeit with a necessary moment of refueling.
But there's no way that these seventeen projects can be well surveyed in one post, so let's start with the five projects now that have arrived above the fence line or right at it in the past few weeks:
* First up is the one that's probably making the biggest splash, which is the new National Association of Broadcasters HQ at South Capitol and M. (Its sibling, the Avidian condo building, isn't quite keeping up, and is still below the fence line.)
* Meanwhile, up at Half and K, It's taken a while but the second phase of the Parc Riverside apartments is now visible from street level as well.
* Trekking over to the Yards, the Thompson Hotel on the south side of Tingey Street is visible, while *its* sibling, the 227-unit apartment building apparently dubbed The Estate, has rebar juuuuuuust poking up above the fence line, but not obvious enough to bother with a photo. (See, I'm not COMPLETELY OCD about this.)
* The last new arrival, the third portion of "The Collective" group of apartments known as the Garrett, is past the fences.
Stay tuned for more.
Comments (7)
   
 
 More Recent News

JDLand.com Home

Comments

202_cyclist says: (6/19/18 4:38 PM)
Thank you for the update and photos. The National Association of Broadcasters building seems to sure have shot up quickly.


stacycloyd says: (6/19/18 5:49 PM)
Ramen may be coming to the 100 Montaditos spot but the only source is Popville so you may want to wait for more confirmation before promoting this to a tidbit: link


nsfw says: (6/20/18 6:56 AM)
@stacycloyd Now I can move to the neighborhood.


willinrm says: (6/20/18 10:39 AM)
Man, montaditos is going to be missed, that was a great happy hour Wednesday spot that for some reason always flew under the radar for everyone i'll never understand why. :( Hope the ramen news comes through that would be some welcomed new type of food in the hood!


Ampersand says: (6/20/18 10:45 AM)
Sometime between yesterday morning and this morning the CSX team moved the 4th St pedestrian underpass a little bit. My shot-in-the-dark guess is that 4th will reopen to all traffic around July 14th. AKA the day before the All-Star party rolls into town. (I'm hoping for sooner, though)


walt says: (6/20/18 10:58 AM)
This morning I drove up 8th from L and about 15 CSX workers were standing around inspecting a mound of recently laid tar that had buckled and was poking up at least 20 inches from the ground. I'll be interested to know if that was just a blister that can be smoothed down or if something from the tunnel is poking up from underground and pushing the road up.


jdc says: (6/20/18 2:19 PM)
You can't tell it from the photos but the Parc Riverside Phase 2 is sort of awkwardly situated in terms of the ground floor. The floor that would be the ground floor is at least a foot lower than the sidewalk level, so you almost step down into the building. But, there is a floor about 6 ft higher then sidewalk level which could also be the first floor, though you would have to walk up to it. Very bizarre.

Also, signage up for Peet's coffee.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

bdj on ANC 6D07 Candidates: +1 to barbershop! I currently walk up to Jajo barbershop in Eastern Market, whic...
CJBabyDaddy on Tuesday Tidbits: My limo driver wants to know if arrangements have been made for him and the chau...
Snacks on ANC 6D07 Candidates: I would still love to see a haircut / barbershop in the neighborhood that doesn'...
conngs0 on ANC 6D07 Candidates: Taylor Gourmet was never bad. But it sure was better when it was just the H Str...
jdc on ANC 6D07 Candidates: I never found service at TG bad - maybe it was not stellar, but everyone was alw...
Ampersand on ANC 6D07 Candidates: I was already super sad about losing my access to risotto balls and then Chris h...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O 5TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/24/18
150 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/22/18
700 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/22/18
1000 5TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle) - Street / Unknown
 09/16/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/16/18
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/15/18
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/15/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/13/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/13/18
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/08/18
400 B/O M ST SE   THEFT
Shoplifting
 09/02/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/26/18

Recent Issued Building Permits Archive  
1108 3RD ST SE   
09/04/18 
JULIANA DUFFY / HERVE BILLIET
SOL1800816 / CONSTRUCTION
This is a new rooftop solar installation for 1108 3rd Street SE, Washington, DC, 20003.
   
09/06/18 
JULIANA DUFFY / null
E1810366 / SUPPLEMENTAL
1015 4TH ST SE   
09/17/18 
GASTON CHAN / KYLE YOST
SOL1800945 / CONSTRUCTION
5.89kw rooftop solar pv system, less than 4' above roof
   
09/19/18 
GASTON CHAN / null
E1810828 / SUPPLEMENTAL
1300 4TH ST SE   
09/07/18 
null / MITCH PERMUY 7274240492
E1810371 / SUPPLEMENTAL
1346 4TH ST SE   
09/07/18 
null / MITCH PERMUY 7274240492
E1810372 / SUPPLEMENTAL
1310 10TH ST SE   
09/10/18 
NAVFAC / BLAINE LINKOUS
EX1800093 / CONSTRUCTION
Federal property at the Washington Navy Yard. Project is for the installation of outside underground utilities including new potable water valves and stormdrain. All work is cut and cover utility install. Sediment controls will be provided.
2 EYE ST SE   
09/18/18 
null
M1803959 / SUPPLEMENTAL
   
09/18/18 
null
P1809280 / SUPPLEMENTAL
4 I ST SE   
08/29/18 
CRESCENT COMMUNITIES / MITCH A. PERMUY 727-210-0492
E1809865 / SUPPLEMENTAL
   
09/18/18 
JOHN MORIARTY / null
M1803958 / SUPPLEMENTAL
2 I ST SE   
08/29/18 
CRESCENT CAPITAL VIEW LLC / KIM MITCHELL
TL1800059 / CONSTRUCTION
EXPEDITION / VELOCITY PROGRAM - INTERIOR WORK ONLY FULL-SERVICE RESTAURANT WITH 78 SEATS AND 80 OCCUPANTS INDOORS. WITH BUILDOUT OF AN EXISTING COLD DARK SHELL STRUCTURE AT THE GROUND FLOOR OF THE 2 I STREET BUILDING PERMIT B1713380. THE BUILDOUT IS FOR A RETAIL KITCHEN.
   
09/11/18 
MCDONALDS CORPORATION / null
E1810511 / SUPPLEMENTAL
   
09/19/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801319 / CONSTRUCTION
WR #3573836 - VAETH / BRUNO - WARD 6 - 20003 - PEPCO CREWS WILL BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLES - CREW WILL BE WORKING AT NIGHTS DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9PM TO 7 AM - PEPCO CREWS WILL ALSO BE WORKING WEEKENDS (SATURDAY AND SUNDAYS) FROM 6AM TIL 6PM - WORK IS ONGOING
150 I ST SE   
09/10/18 
WILLIAM CSMITH CO / GLENNWOOD ROGERS
M1803857 / SUPPLEMENTAL
418 L ST SE   
09/14/18 
null / NA NA NA
EHOP18998072 / HOME OCCUPATION
202 M ST SE   
09/05/18 
UNITED STATES OF AMERICA / DANIEL KISER; X
SG1800384 / CONSTRUCTION
Installation of 4 wall mounted signs. 2 @ 26.25 SF and 2 @ 35.5 sf
300 M ST SE   
09/05/18 
FEDERAL CENTER LP / null
P1808927 / SUPPLEMENTAL
   
09/05/18 
FEDERAL CENTER LP / null
P1808926 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE 1ST FL   
09/18/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P1809276 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 3RD FLOOR   
09/17/18 
SQUARE 742 LLC / null
P1809222 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
08/30/18 
SQUARE 742 LLC / null
E1810159 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
09/07/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ASHLEY TORRES
TL1800132 / CONSTRUCTION
Tenant Layout to 1st floor for commercial bank use. 3036SF
   
09/10/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
M1803863 / SUPPLEMENTAL
   
09/12/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1810553 / SUPPLEMENTAL
125 O ST SE   
08/29/18 
DISTRICT OF COLUMBIA / DAVID T FONTANA
B1803497 / CONSTRUCTION
Revision to issued permit B1700636 for new six story DC WATER HQ office to include: Minor door, ramp and partition changes, corrections to foundation, slab and framing due to field conditions, MEP & FA coordination with other changes, minor changes to landscaping and water utility site work.
71 POTOMAC AVE SE   
08/31/18 
FORIDA ROCK PROPERTIES INC / MITCH PERMUY 7272100492
E1810173 / SUPPLEMENTAL
79 POTOMAC AVE SE   
09/13/18 
RIVERFRONT HOLDINGS I LLC / JOHN HOMICK 301-390-4800
E1810571 / SUPPLEMENTAL
221 TINGEY ST SE   
09/10/18 
KELLY THORNBURG / GLENNWOOD ROGERS
M1803850 / SUPPLEMENTAL
227 TINGEY ST SE   
09/07/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1801286 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for precast concrete fa├žade panel installation. Work to take place from 7pm on 9 / 24 / 2018 to 7am on 9 / 25 / 2018.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.