Since January, 2003
            
 (a random before-and-after moment)
May 4, 2003
June 4, 2017
1st at Potomac, Looking Southwest (see more)

I took a positively epic number of photos on Saturday, and one of spots I captured was the southwest corner of 1st and M, where Skanska's 99 M office building now appears in more or less its final form (except for the retail spaces).
Of course it made me think of that spot's "before photo," which is one of my absolute favorites, because it shows the old Normandie Liquors building, all alone, in May 2006. Just one block to the south, demolitions were underway to clear the site that would become Nats Park, but this photo gives no hint of the radical changes about to come.
And then I thought about how I have taken so many photos of this corner since 2006, because the actual corner lot took so long to be developed, and because so much happened right around it. And I realized that it is probably one of the best spots to illustrate what has happened in the Near Capitol Ballpark River Yards neighborhood over the past 15 years.
Let's take a run through just a few of the 102 photos I have taken of that corner since 2006. Click to enlarge/slideshow 'em:
By June 2007, cranes are visible to the south, as work on the ballpark is well underway. Later that year the distinctive steel work of 55 M appears next door, and the new building rises up above the Normandie--until February 2008, when the little yellow brick building meets its demise. The ballpark is now clearly visible from 1st and M, just in time for its debut in late March, 2008, and by the end of that year, 55 M's exterior is finished.
And then the view freezes. It's the same for all of 2009, and 2010, and 2011, and 2012, and 2013, until at last a crane appears at the south end of the 1st Street block in spring 2014. Up goes the Hampton Inn, and it is followed in 2015 and 2016 by F1rst and the Residence Inn.
Finally, in May 2017, 11 years after the Normandie stood alone, the southwest corner of 1st and M finally has a skeleton of its own, as 99 M at last makes it above ground.
And now, one year after that, the sidewalks are open, and the garage-like doors where Circa will host hordes of stadium-goers are visible.
I'm guessing the beverages at Circa will cost a little more than they did at Normandie.
This is of course just one of a whole lot of corners that have radically changed in the past 15 years, and some of them even had a similar start-stop-start timeline, but I do think if one corner has to be picked to tell the story, it's this one.
Comments (6)
   
 
 More About Development News
 All posts: 99m, Development News

JDLand.com Home

Comments

Gamble Rogers says: (6/18/18 12:26 AM)
This is amazing work, JD.


conngs0 says: (6/18/18 8:46 AM)
Remarkable! It's been a pretty amazing transformation over the years even from the perspective of someone who's been in the neighborhood (or the city) for the majority of the time. But it's just as interesting to see the reactions of people who are returning after an absence of a year or two.


RMP says: (6/18/18 10:15 AM)
This is amazing. Thank you for all the hard work over the years to make this possible.


JES says: (6/18/18 10:56 AM)
This is awesome. I wonder what a similar post looking up Half from the CF gate would look like once all the Half Street buildings are done.


RMP says: (6/19/18 9:02 AM)
Election Day got off to a rocky start at the community center. They didn't start letting people in to the gym until 7:10. When I went to put my paper ballot in the machine it wasn't working so they had me put it in the provisional ballot bucket instead, so I have no idea if my vote counted or not. At least I got a sticker.


202_cyclist says: (6/19/18 4:36 PM)
@RMP--if you have an opportunity, voting early is the way to go. I voted early two weeks ago at the DC government building at Judiciary Square. The entire process took five minutes. There were no lines. I also received at least one vote-- I wrote my name in for either Shadow Senator or Shadow Representative.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

Section314 on Construction Update: Have there been any buildings completed such that move-ins have begun since the ...
Capyardsres on Construction Update: Just got a note under the door saying that 70 and 100 capitol yards are now unde...
stax on Construction Update: Great update. Any news on the new humane society building at 11th and M? i tal...
jdc on Construction Update: SWneighbor - one thing is for sure, no one bothered to shovel, or salt, those si...
SWneighbor on Construction Update: Does anyone know if the Metro chiller site condo project is still in the works? ...
202_cyclist on Construction Update: There is a session today at the annual Transportation Research Board conference ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/15/19
200 B/O WATER ST SE   THEFT
Theft 2nd Degree (theft From Building)
 01/14/19
UNIT B/O K ST SE   THEFT
Theft First Degree (theft From Building)
 01/12/19
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/11/19
1000 B/O 1ST ST SE   THEFT
Theft First Degree (all Other Larceny)
 01/06/19
1300 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/04/19
900 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
200 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/29/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/28/18
700 B/O L ST SE   BURGLARY
Burglary Two
 12/28/18
400 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/26/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/26/18
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/25/18
300 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/24/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/23/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/22/18
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/20/18
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 12/19/18
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 12/18/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/18/18

Recent Issued Building Permits Archive  
1000 5TH ST SE   
12/27/18 
UNITED STATES OF AMERICA / TANYA HILL
B1902924 / CONSTRUCTION
DGS RENOVATION OF EXISTING WARMING KITCHEN AND FITNESS ROOM OF APPROXIMATELY 900 SF TO BECOME RESIDENTIAL GRADE DEMONSTRATION KITCHEN. RENOVATION OF EXISTING APPROXIMATELY 300 SF OPEN LOUNGE AND SOME DEMOLITION OF INTERIOR PARTITIONS, NEW FINISHES AND MEP. This permit dose not include the Child devolepment center, There work in this area.
150 I ST SE   
12/24/18 
MILLSTONE CORPORATION / CHRISTINE LONG
B1903052 / CONSTRUCTION
To temp attached material hoist to side of building
1200 NEW JERSEY AVE SE 20024   
12/21/18 
JBG/FEDERAL CENTER LLC / JEWEL HANSON
TN1900027 / CONSTRUCTION
Mayor Muriel Bowser's 5th Annual Fresh Start FitDC 5K scheduled for January 1, 2019. Assemble: 4 (1) 20x20 tent, (1) 10x40 tent, (1) 10x20 tent, (3) 10x10 tents, (3) 5K Generators, (1) Start / Finish Arch (1) Show Mobile Stage from DPR 28x14, (1) Platform 4x4x2
227 TINGEY ST SE   
12/26/18 
JOHN MORIARTY & ASSOCIATES / DFM DEVELOPMENT SERVICES, LLC
AH1900354 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of dismantling the tower crane on private property. Work to take place Friday 1 / 18 – 7pm-10pm, Saturday 1 / 19 – 7pm-10pm, and Sunday 1 / 20 – 10am-7pm.
355 WATER ST SE   
12/24/18 
UNITED STATES OF AMERICA / KAYLIE ROLIN
TN1900028 / CONSTRUCTION
(1) 30 x 70 ft tent (1) 7k watt gas generator
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.