Since January, 2003
            
 (a random before-and-after moment)
November 11, 2004
January 10, 2010
4th at K, Looking East-Northeast (see more)

Was out of town for a long weekend to participate in the induction of the late Mr. JDLand into the University of Arizona School of Journalism Hall of Fame, as part of its inaugural class. Now trying to get caught up (I say that a lot these days, I know):
* MORE COFFEE!: Because you addicted folks can't get enough of that witches' brew you all pretend to like, I'll mention that Eater has reported that Australian chain Bluestone Lane has signed a lease to open a coffee shop a 1,014-square-foot space in the ground floor of the 99 M office building that will also be home to Circa and Open Road. Here's the deets on the existing location in Georgetown. Both the building and Bluestone are expected to be finished later this year.
* OATH OPEN: They kind of snuck in without a lot of fanfare, but Oath Pizza is now open next to Bethesda Bagels on M Street between 1st and New Jersey, joining All-Purpose and Declaration, which both opened last week. Now we await Wise Guy Pizza at Canal Park.
* CHLOE REVIEW: The Post's Tom Sietsema gives Chloe his "good/excellent" rating.
* YARDS PHASE 2: I was kind of surprised at the volume of coverage earlier this week about the second-phase plans at the Yards, which mainly shows the power of sending a press release to every development reporter in town (though not me). If you've been following my posts about "Yards West" since, oh, early 2014, the plans for well over 1 million square feet of office space on the footprint of Spooky Park at 1st and M and two residential buildings on the current parking lots on the south side of N Street is not really anything new. But the press release attached a 2019 start date attached to this next phase, and it also passed along two renderings, including one showing what the release describes as a "six-block spine" beginning at a new plaza at New Jersey and M, extending all the way to the Anacostia River at Diamond Teague Park, described as "a vibrant pedestrian-friendly street, featuring ground-level retail and dining, extended green spaces and a variety of public gathering areas." In all, "Yards West" will have about 3 million square feet of mixed-use space across 18 acres.
Here are the renderings, showing the planned office building for "Parcel F," on the northeast corner of 1st and N, and the aforementioned "spine," looking south toward the river.
(And maybe that new plaza at New Jersey and M will include the dreamed-of third entrance to the Navy Yard Metro station, on the south side of M.)
But what if Amazon picks the Capitol Riverfront/Poplar Point HQ2 proposal, which includes these lots (seen on this map as locations 9 and 10)? Or is this a hint that it's not expected to be chosen? We Shall See!
* PARADIGM PART 2: WBJ reports late this afternoon that Paradigm has now purchased the rest of the block bounded by New Jersey, 1st, K, and L. This includes the Eagle Academy building and the taxi garage next door, on New Jersey. The company is just getting started with its 275-unit residential building at 1000 1st Street, on the west side of this block (known as Square 740), and apparently is planning a twin for the other part of the block.
Comments (18)
   
 
 More Recent News

JDLand.com Home

Comments

NavyYardNittany says: (4/12/18 7:46 AM)
Hope you enjoyed the visit to Arizona JD, though I’m sure it was bittersweet.

Excavation began at 7:00 am sharp this morning on Square 696. Parade of 20 dump trucks welcomed me when I woke up. 4 active construction sites within two/three blocks of each other will be fun to navigate the next few months.

Also, I didn’t see it mentioned here in comments, but Circa put up a FB post last week with pics from inside 88 M and a caption along the lines of “beginning work on the new location” or something like that. Looks as though that building is just about finished in terms of the “build” phase, they were working on putting in the new sidewalk on First stteet when I went by.


Edna says: (4/12/18 11:16 AM)
The "six block spine" in Yards West - is that what has been shown on previous site plans as One-and-a-Half Street?


JD says: (4/12/18 11:17 AM)
Yes--I meant to mention that, but was bewildered as to how to properly format 1.5 Street.


JD says: (4/12/18 11:23 AM)
Re Sq 696, guess I'm going to have to make another rendering!


202_cyclist says: (4/12/18 11:35 AM)
@NavyYardNittany:

At least we got a new bike lane on I Street out of the construction, but I agree with you, between all of the Uber/Lyft and deliveries at 70/100 Capitol Yards and the construction for Square 696, I St will be a cluster for a while.


Edna says: (4/12/18 11:46 AM)
I had the same struggles re: 1.5, and tried a few different options. Since "1.5" is the easiest to type, can we settle on that convention?


malatesta says: (4/12/18 12:14 PM)
Why not 1st place?


202_cyclist says: (4/12/18 1:51 PM)
Yes-- I list 1st Place right across the street from Nats Park.

Does anyone know if Truckeroo will be back this year? Is there enough space at the Bullpen to host it?


conngs0 says: (4/12/18 4:58 PM)
It looks like they're planning on having it at Nats Park this year...

link


Ampersand says: (4/13/18 3:57 PM)
For the record, apparently the ordinal for 1.5 is "sesquialter" (or sesquialteral, the internet is fuzzy). I'm totally down for 1.5st Street as long as everyone agrees to pronounce 1.5th as "sesquialter"


Snacks says: (4/16/18 9:21 AM)
This conversation is getting dangerously close to math ... make brain hurt.


Westnorth says: (4/17/18 10:14 AM)
Bluestone Lane is also open next to the West End library. Avocado toast with all the options totals... $22! No wonder Australian millennials can't afford to buy homes.


Gamble Rogers says: (4/17/18 8:47 PM)
Avocado toast? 1.5th Street? What is the “Newly Developing Area Immediately Adjacent to (but not within) the Navy Yard” coming to?


Gamble Rogers says: (4/17/18 8:48 PM)
More pizza for the NDAIATBNWTNY!

But will any of it be any good?


sameter says: (4/18/18 12:55 AM)
I'm a little surprised at tom's review of chloe, food was passable, ambiance was great. as a small plates/veg-centric restaurant, i would hope the carrots would be cooked well, but undercooked. Chicken was well brined and seasoned, but overcooked. if dishes are going to be as simple and straight forward, you really need to nail the execution, but maybe im just jealous.


ZinNY says: (4/18/18 9:11 AM)
According to a sign on their door, Five Guys is reopening on Monday, April 23.


Lambau88 says: (4/18/18 1:05 PM)
Tried out Declaration on a non-game night. Quality food and friendly/attentive staff but, as to be expected now, beware the prices! Philly cheese-steak and fries, half an order of wings (my friend had the other), and 2 drinks (1 cocktail, 1 beer) were $45 before tip.

Also, I'm not buying all the pizza hype. I'm waiting on wise guys!


greb22 says: (4/18/18 2:57 PM)
I went to Declaration for happy hour on a non game day and they charged me regular prices the manager apologized and basically said he knows there's a glitch in the system. The drinks were good though I didn't really eat.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

202_cyclist on Yards West Zoning: Quit the gun play, people. https://mobile.twitter.com/DCPoliceDept /status/1053...
CJBabyDaddy on Yards West Zoning: What’s next? JDLand&1/2?
malatesta on Yards West Zoning: No matter what anyone says, I'm calling it "Qwandor the Dragon Street"...
B in DC on Whole Foods: JD, several folks requested that in the EIS process but were told that it was ou...
JD on Whole Foods: What also needs to happen is that the fences blocking the Garfield Park underpas...
Packinblackandred on Whole Foods: @GarfieldPark I think they only put it up there for when the Whole Foods constru...
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Shoplifting
 10/17/18
100 B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/17/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/10/18
50 M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/08/18
1100 B/O 10TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/07/18
100 B/O M ST SE   ROBBERY  10/05/18
700 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 10/04/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 09/28/18
1100 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/27/18
100 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 09/26/18
100 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/26/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/26/18
1100 B/O 5TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/24/18
150 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/22/18
700 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/22/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
10/12/18 
null / DONNA G GRAHAM
AH1900071 / CONSTRUCTION
WR #3585809 - M.ALLEN / A.PRICE - 1100 2ND PLACE SE - PEPCO CREWS WILL BE SPLICING CABLES AT NIGHT STARTING 10 / 15 / 18 UNTIL 11 / 2 / 18 FROM 10:00 PM TIL 7:00AM MONDAY THROUGH SUNDAYS
1346 4TH ST SE   
09/28/18 
ALAN OWINGS / ROBERT HENRY
AH1801345 / CONSTRUCTION
After Hours Permit for 10 / 08 / 2018 to perform construction work with the below activities: Interior Operations: 7AM - 7PM - ADVANCED NOTICE TO RESIDENTS, OPERATION CONTACT PERSON ON SITE TO ADDRESS ANY UNEXPECTED NOISE ISSUES BEFORE 9:00AM WITH CONTACT NAME AND TELEPHONE. Exterior Operations: 9AM-7PM - NO EXTERIOR ACTIVITY, TRAFFIC, NOISE GENERATION BEFORE 9am WITH ON SITE OBSERVANCE. ...
   
10/09/18 
FC 1346, LLC / null
E1900300 / SUPPLEMENTAL
   
10/18/18 
FC 1346, LLC / DFM DEVELOPMENT SERVICES, LLC
B1809670 / CONSTRUCTION
Parcel O-2 at the Yards. Revision to Permit B1610576 for installation of flood wall on 5th Street, SE, the reduction of roadway width, and widening of sidewalk to provide adequate pedestrian clear space between flood wall and edge of tree pit. TPR
2 I ST SE   
09/25/18 
MCDONALDS CORPORATION / TAMIKA STATON; OTIS
EN1802612 / SHOP DRAWING
Install 1 New G2S Elevator - 4000LBS @ 350FPM
   
09/25/18 
MCDONALDS CORPORATION / TAMIKA STATON; OTIS
EN1802611 / SHOP DRAWING
Install 3 new G2S Elevators - 3500LBS @ 350FPM
   
09/26/18 
MCDONALDS CORPORATION / null
E1811060 / SUPPLEMENTAL
   
10/09/18 
CRESECENT CAPTIAL VIEW / null
P1900223 / SUPPLEMENTAL
   
10/17/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1900080 / CONSTRUCTION
WR #3573836 - M.ALLEN / BRUNO - WARD 6 - 20003 - PEPCO CREWS WILL BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" STREET ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL AND SPLICE CABLES - CREW WILL BE WORKING AT NIGHTS DURING THE WEEK (MONDAY-FRIDAYS) FROM 9PM TIL 7AM - PEPCO CREWS WILL ALSO BE WORKING SATURDAY AND SUNDAYS FROM 6AM TIL 6PM - WORK IS ONGOING
4 I ST SE   
10/09/18 
CRESCENT COMMUNITIES / null
P1900221 / SUPPLEMENTAL
328 K ST SE   
09/27/18 
MARK BARRETT / null
E1811075 / SUPPLEMENTAL
   
10/04/18 
MARK BARRETT / BJORN FALK
SOL1800999 / CONSTRUCTION
Installation of a 5.559kW solar PV system. Roof mounted, 17 panels with integrated microinverters.
401 L ST SE   
10/11/18 
MICHAEL R BRICKMAN / FLOYD H. FURR
P1900299 / SUPPLEMENTAL
   
10/11/18 
MICHAEL R BRICKMAN / DARIUS LYVERS 703-491-1234
M1900108 / SUPPLEMENTAL
300 M ST SE 8 20024   
09/24/18 
BARBARA D HAMLETT / null
P1809404 / SUPPLEMENTAL
300 M ST SE   
09/25/18 
FEDERAL CENTER LP / null
E1811000 / SUPPLEMENTAL
   
09/25/18 
FEDERAL CENTER LP / null
E1811001 / SUPPLEMENTAL
   
09/25/18 
FEDERAL CENTER LP / null
E1810999 / SUPPLEMENTAL
400 M ST SE   
10/18/18 
CAPPER SENIOR 11 LIMITED PARTNERSHIP / null
E1900650 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
10/17/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1900581 / SUPPLEMENTAL
79 POTOMAC AVE SE 1ST FL   
10/03/18 
RIVERFRONT HOLDINGS I LLC / null
P1900101 / SUPPLEMENTAL
71 POTOMAC AVE SE   
09/28/18 
FORIDA ROCK PROPERTIES INC / BARR CONCRETE
AH1801325 / CONSTRUCTION
After hours to pour concrete with pump truck 9 / 28 / 2018 to 10 / 28 / 22018 from 11pm to 7am
   
10/04/18 
FORIDA ROCK PROPERTIES INC / BARR CONCRETE
AH1900029 / CONSTRUCTION
Afterhours to pour concrete with pump truck saturday 10 / 06 / 2018 from 12am to 7am
79 POTOMAC AVE SE   
10/04/18 
RIVERFRONT HOLDINGS I LLC / null
M1900054 / SUPPLEMENTAL
201 TINGEY ST SE   
10/09/18 
JBG/SEFC 170 LLC / DONNA G GRAHAM
AH1900051 / CONSTRUCTION
WR #3566756 - M.ALLEN / BRUNO - 201 TINGEY ST SE - PEPCO CREWS WILL BE INSTALLING NETWORK TRANSFORMERS AND INSTALLING CABLES - PEPCO WILL HAVE TO SHUT DOWN 3RD ST BETWEEN WATER ST & TINGEY ST SE TO SET TRANSFORMERS ONLY - WORK WILL BEGIN 10 / 12 / 18 THROUGH 11 / 30 / 18 - MONDAY THRU FRIDAYS FROM 10PM TIL 8AM AND SATURDAYS AND SUNDAYS FROM 6AM TIL 6PM
227 TINGEY ST SE   
10/09/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1900056 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for follow-up test run of the precast concrete façade panel installation. Work to take place 7pm on 10 / 10 to 7am on 10 / 11.
   
10/15/18 
GONE YARD HOTEL OWNER LLC / MICHAEL ERIC CAMPBELL 703-631-2711
FB1900011 / SUPPLEMENTAL
NO. TO BE INSTALLED (2) GROSS RATING: 999999 BTU / HR NATURAL GAS STEAM PRESSURE 160 PSI OUTPUT: 960,000 BTU / HR
   
10/15/18 
GONE YARD HOTEL OWNER LLC / MICHAEL ERIC CAMPBELL
UP1900012 / SUPPLEMENTAL
   
10/17/18 
UNITED STATES OF AMERICA / DFM DEVELOPMENT SERVICES, LLC
AH1900079 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 10 / 22 through 11 / 3.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.