Since January, 2003
            
 Sliding from Before to After

With my trip to the disabled list delayed thanks to a very-last-minute insurance snafu, I decided on Sunday to finally limp over to 8th Street for the first time in forever to see what has sprouted.
* EMBLEM: There's one obvious new sprout on lower 8th, and that is the nearly-topped-out construction of a new condo building on the southeast corner of 8th and Virginia. It's officially known as the Emblem at Barracks Row, a 20-unit building being built and run by Bozzuto. Every unit has a unique layout, according to the web site, and there will be six penthouse units, most with outdoor terraces. (And since it's only four stories tall, it's a sticks-and-bricks building, which we don't see many of in these parts.) There will also be 3,000 square feet of ground-floor retail space. Sales on the units should begin this year. (I do not know the price ranges.) A rendering of the finished product can be peeked at here.
* LA MEDITERRA: A new restaurant has opened south of L, next door to Las Placitas in the space once occupied by Ziaffat. It's La Mediterra Fusion Grill, serving kabobs, shwarma, and other Mediterranean offerings (and wings!), and it is open for lunch and dinner seven days a week. Here's a peek at the menu, if you have your x-ray specs handy.
* NAILS!: I think it's been there a few months, but Navy Nails and Spa is now in the ground floor of the gray building on the northeast corner of 8th and M.
* POTOMAC AVENUE DOINGS: Meanwhile, around the corner on Potomac Avenue between 8th and 9th, the long-vacant apartment building at 816 Potomac is now undergoing renovations to be a rental building with what now is targeted to be 19 units, if designs are approved. As for the empty lot next to that building at the corner of 9th and Potomac, the Board of Zoning Adjustment voted in December to approve plans for a four-story, 49-unit building at 818 Potomac, which would also be notable for plans to have a "parking elevator" garage that would allow 43 cars to be parked/stacked on one level. Both projects are being developed by the Murillo Malnati Group.
Comments (17)
   
 
 More About 8th Street

JDLand.com Home

Comments

dude says: (1/9/18 7:57 AM)
Regular elevators break quite enough, but at least you can just take the stairs. I can't imagine the headaches involved in a car elevator.


monkeyrotica says: (1/9/18 9:06 AM)
Stopped by La Mediterra for lunch yesterday. Ordered the beef shawarma on lavash bread and a side of falafel with tahini. The beef was tasty and filling and the check was $10 and change, which is about what you'd pay for the same from a food truck.


mensan98th says: (1/9/18 10:20 AM)
I hope La Mediterra hangs around. It'd be nice to have it in the neighborhood and on the (for now) easier-to-access end of 8th Street SE.


202_cyclist says: (1/9/18 11:15 AM)
Thank you for the updates. I noticed there is now a dumpster, a small tractor, and a port-a-potty on the vacant lot immediately north of Eagle Academy on K and NJ Ave, SE.


Ampersand says: (1/9/18 5:14 PM)
Presumably anyone affected would have noticed by now, but apparently there's a somewhat sizable power outage in the neighborhood that seems to have taken out the traffic light at New Jersey and M. Based on a couple minutes worth of observation, the general driver consensus seems to be that Traffic Light Out = Full-Speed Green For Everyone. Safe passage, everyone...


EPM says: (1/9/18 6:13 PM)
This may be old news as I’ve been out of commission awhile myself but since Whole Foods questions are never far between - there are what I believe are more/new signs in the windows with the WF logo and “coming soon.”


JD says: (1/10/18 8:55 AM)
No, we're good on that:

link



jdc says: (1/10/18 10:13 AM)
Not sure it's new, but I just noticed that the Homewood Suites on Half and M streets has a large, blue LED display running from just above the entrance to the top of the building. It sort of mimics a wave, flowing up and down, down and up.


202_cyclist says: (1/10/18 11:47 AM)
Folks, I have some unfortunate news to report. As per the ANC 6D agenda for this past Monday's meeting, there was a request for a five year extension for the Yards parking lot, so I take this as a sign we're probably not going to the get Amazon II HQ in JD Land.

link

On the other hand, hyperloop and a drone-port still remain possibilities for the neighborhood.


Alex B. says: (1/10/18 12:52 PM)
"so I take this as a sign we're probably not going to the get Amazon II HQ in JD Land."

There are lots of signs to look at for why Amazon won't be coming to DC, but this is not one of them.


JES says: (1/10/18 2:23 PM)
5 year extension also doesn't mean that the lot will remain a lot for the entire 5 years. If their permit was up and they needed to reapply, they probably don't want to have to do so on an annual basis, so why not ask for longer?


Ampersand says: (1/10/18 2:42 PM)
From Tom Sietsema's chat today:

"All-Purpose is gearing to open by mid-February," creator Michael Friedman texted [Tom] earlier today. "We had some major setbacks with our build-out, but can't wait to serve the community some old-school deck-oven pizza and delicious antipasti!"


jdc says: (1/10/18 2:45 PM)
I was wondering what was going on with All-Purpose. This has been a very slow build out.


RMP says: (1/10/18 3:15 PM)
Does anyone in the biz know why restaurant build-outs always seem to take so long? Is it the permitting? Installing the cooking equipment? Something else?


202_cyclist says: (1/10/18 3:19 PM)
@RMP-- I think dealing with DCRA and the other DC regulatory agencies takes an exceedingly long time.


JNB says: (1/10/18 8:16 PM)
Was at Wise Guys picking up pizza for dinner and they confirmed they are opening in the hood. Said it would be a couple of months or so.


RMP says: (1/11/18 7:49 AM)
Speaking of slow build-outs, did 18-8 just give up? It seems like they've been stuck at 90% of the way there for months.

Add a Comment:


Registered CommenterPosting Comments Now Requires a
Registered Account:

Log In, or Register Now



JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News

202_cyclist on Barre3 Studio Coming: I noticed another construction trailer this morning on the empty lot immediately...
jdc on Barre3 Studio Coming: I love Harry's, but competition is always good. That said, I wonder if this plac...
sameter on Barre3 Studio Coming: besides harrys being overpriced, it will do the neighborhood good to have compet...
malatesta on Barre3 Studio Coming: Huh. With Harry's, Harris Teeter and (hopefully) Whole Foods all in a 3ish block...
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O K ST SE   BURGLARY
Burglary Two
 01/13/18
1000 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/18
500 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 01/09/18
900 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/07/18
100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/04/18
400 B/O M ST SE   THEFT
Shoplifting
 01/02/18
UNIT B/O K ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/31/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/19/17

Recent Issued Building Permits Archive  
1100 2ND PL SE   
12/21/17 
CAPPER CARROLLSBURG VENTURE LLC / null
P1802299 / SUPPLEMENTAL
1331 2ND ST SE   
12/22/17 
DC WATER / DAVE LEVINE
AH1800369 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water, Corman Construction 301-343-5417. TO EXCLUDE LEGAL HOLIDAYS.
1331 4TH ST SE CU   
12/27/17 
FC 1331 LLC / GARY BRENT; N/A
SG1800119 / CONSTRUCTION
Install 1 illuminated blade sign and 7 non-illuminated window vinyl signs - CHLOE BY HAIDAR KAROUM
   
12/28/17 
FC 1331 LLC / BEN BEDDO
TL1700205 / CONSTRUCTION
New Tenant Layout for restaurant
1300 4TH ST SE   
01/05/18 
FORREST CITY WASHINGTON / GEORGE ARTHUR KING
SB1800091 / CONSTRUCTION
To abandon 18 6 inch diameter 80 foot deep dewatering wells and 4 2 inch diameter 50 feet deep observation wells per the DOEE regulations
1346 4TH ST SE   
01/12/18 
ALAN OWINGS / ROBERT HENRY
AH1800415 / CONSTRUCTION
After Hours Permit for 1 / 15 / 18 from 7AM to 7PM to perform concrete operations, framing, operations, and utility operations.
2 I ST SE   
12/20/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800359 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
411 I ST SE   
12/27/17 
ABIGAIL A SMITH / ROBERT D. JOHNSTON
E1802679 / SUPPLEMENTAL
337 L ST SE   
12/22/17 
JENNIFER LANCASTER / null
E1802602 / SUPPLEMENTAL
   
01/11/18 
JENNIFER LANCASTER / BJORN FALK
SOL1800005 / CONSTRUCTION
Installation of a 3.6kW solar PV system. Roof Mounted, 10 panels
300 M ST SE STE# 400   
01/03/18 
FEDERAL CENTER LP / SAM HOLLEN
B1803531 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE CONFERENCE ROOM. PARTITIONS, CEILING, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 680 SQUARE FEET. CACI SUITE 400
25 POTOMAC AVE SE DOCK 79   
01/11/18 
RIVERFRONT HOLDINGS I LLC / null
P1802701 / SUPPLEMENTAL
227 TINGEY ST SE   
12/29/17 
JW CAPITAL PARTNERS / MELISSA DIAZ
FD1700126 / CONSTRUCTION
Parcel L1- Foundation to Grade permit for the new construction on an 11 story full service hotel building with restaurant and retail.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.