Since January, 2003
            
 Sliding from Before to After

I somewhat unexpectedly found myself wandering around on Sunday, and though the official JDLand camera stayed home and drank hot chocolate, the JDLand cellphone (a Pixel 2, thanks for asking) stepped in to catch some progress pics.Here's a rundown:
* HELLO, AVIDIAN: After being burned multiple times over the years with projects being said to include condos during the design phase only to end up as rentals, it's nice to have confirmation via the purty new fence signage at South Capitol and M that not only that the corner will be home to the new headquarters for the National Association of Broadcasters, but that the sibling building immediately to the south that was oddly dubbed 10 Van is now known as the Avidian, and that it will be condominiums, "Selling 2018." The building should have 170ish units and will probably be completed in 2019.
* PEEKING OUT: We have three newcomers to ground level, as the 380-unit apartment building at South Capitol and I is now clearly visible from the street, as is the 190-unit rental sibling to the further-along Bower at Yards Parcel O on 4th Street. Plus, the 420-unit West Half building immediately north of Nats Park now has its first batches of rebar out of the ground, if your eyes know what to look for. (And yes, I'm still completely failing at catching the work underway on what's now known as the Emblem at Barracks Row, the 20-unit condo building at 8th and Virginia. One of these days.)
* ONWARD AND UPWARD: The new DC Water HQ continues to get its face put on, while the condo building known as the Bower at 4th and Tingey has completed seven of its 10ish floors, and at 2nd and L the next Capper mixed-income building is through Floor #4 of its own 10ish floors. {Trying to avoid any arguments about whether penthouses = floors.}
* DOWN ON THE CORNER: There's officially another project underway, as digging is now proceeding at 2nd and I for The Garrett, the third and final portion of WC Smith's "Collective" development that also includes the Park Chelsea and Agora (and this, of course). Meanwhile, there are still holes at the second phase of the Parc Riverside at Half and L (below), and at Monument Valley, which is impossible to get a shot of from street level so you'll just have to imagine it. And I forgot to look behind the fence at Parcel L.
There will probably be some new holes in the ground in coming months, as both the rumor mill and the permitting pipeline hint that at least three more projects will get underway: Dock 79's residential sibling at the old Florida Rock site, the large residential development on the old "Congressional Square" site at 1st and K, and Paradigm's 275ish-unit residential building on the old Market Deli site at 1st and L. (Though I'll note that each of these still do not have permit applications in the system yet beyond the initial shoring/sheeting/excavation step.) The number of still-empty lots keeps a'shrinking....
Comments (17)
   
 
 More About Development News

JDLand.com Home

Comments

202_cyclist says: (12/11/17 1:05 PM)
Thank you for this update. I am glad to see you survived the DC blizzard, the most exciting natural disaster to strike our neighborhood since the GREAT DELAWARE EARTHQUAKE OF 2017!!!


RMP says: (12/11/17 3:18 PM)
Thanks for the update, JD!

I actually LOL'd at the rendering on the Avidian website. I guess it would be nice if the Capitol were only a couple blocks away, the freeway didn't exist, and people actually walked along South Capitol.

Put me down vote a vote in the penthouse = floor camp.


CJBabyDaddy says: (12/11/17 7:43 PM)

Nothing gets me in the holiday spirit more than JD’s posting of the final SH&F Survey.

Hey, don’t judge.


202_cyclist says: (12/12/17 6:35 AM)
We went to Rasa last night. I got the lamb and my wife ordered the Chicken tikka. The food was absolutely delicious, the service was great, and the restaurant has a very nice interior. It’s a good addition to the neighborhood.


Ampersand says: (12/12/17 9:05 AM)
I'm too lazy to see if it was scooped in a different post or thread, but apparently Chipotle is opening at 10:45am on Thursday! First 25 in line get a buy-one-get-one coupon and a t-shirt.


sameter says: (12/12/17 9:07 AM)
Chipotle is opening on thursday the 14th, saw something on facebook last night, wishing now that i screenshot it.


Ampersand says: (12/12/17 9:12 AM)
An attempt to post the chipotle notice should be below...



NavyYardRes says: (12/12/17 10:38 AM)
The condo fee's at the Bower are high considering no pool (500+ per month). I can only imagine what they will be for Avidian with a pool. Do we know of any Condo's in the pipeline with no amenities?


202_cyclist says: (12/12/17 11:05 AM)
The development at 8th and Virginia is moving quickly. It looks like the stairs have been installed and Bozzuto is already starting construction (wood) on the second floor.

Will these be apartments or condos? If they are condos, they might be more affordable since they won't have the expensive amenities other new residential buildings have.


jdc says: (12/12/17 11:19 AM)
Man, those will be some rough views in that apartment building at S. Capitol and I...you either see the dome, or traffic.


JD says: (12/12/17 11:20 AM)
Some of us consider dome-and-traffic views to be a dream come true. :)


JD says: (12/12/17 11:24 AM)
801 Virginia (the Emblem) is supposed to be condos.


RMP says: (12/12/17 12:00 PM)
I'd be awfully nervous about buying a condo in a building made out of wood unless there were some serious reassurances that the soundproofing is solid.


202_cyclist says: (12/12/17 12:30 PM)
@RMP-- I absolutely agree but since it is only 3 - 4 floors of wood-framing, perhaps the noise issues will be less than other wood structure buildings.


JES says: (12/13/17 10:10 AM)
@ NavyYardRes & 202,

We live in Velocity and we see our building's budget every year. You'd be surprised at just how little those amenities actually cost to provide compared to the cost of just running the building. We've got a payroll of I believe 13-14 people (some full-time, some part-time) and their salaries plus reserve contributions make up an overwhelmingly large portion of the budget.

In other words, condo fees in any large multiunit building are going to be high. You need a GM, a rotating staff to staff the front desk, cleaning staff, maintenance staff, etc. The cost of running and maintaining stuff like a gym and pool is negligible in comparison. Even a "no amenity" building is gonna cost a lot to run.


202_cyclist says: (12/13/17 11:46 AM)
Jes-- I agree, I think it is the cost of having a receptionist in the building 24 hours per day. Also, it is nice having janitorial staff in our building every day to keep the building clean but it also adds to the cost.

Having an elevator and underground parking (which I think the 8th and VA Ave building won't have) also contributes to costs.


JES says: (12/13/17 12:37 PM)
801 will probably still have an elevator for moving purposes at the very least. And it'll have insurance policies and other things. It'll probably have lower fees than all the high rises, but I'd be shocked if they were THAT much lower. (Though the Bower's seem insane to me. They're significantly higher, percentage wise per square foot, than Velocity's).

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Top News

CJBabyDaddy on April Construction Report: The 17th? That’s the evening I normally set aside for all things related to my s...
202_cyclist on April Construction Report: @RMP— you’re correct, I was insufficiently caffeinated this morning. Regardless...
RMP on April Construction Report: May 17th is a perfectly nice date but isn't Bike to Work Day on May 18th?
202_cyclist on April Construction Report: May 17 works and that is Bike to Work Day!
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/24/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/23/18
1100 B/O 2ND PLACE SE   THEFT
Theft 2nd Degree (theft From Building)
 04/20/18
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/20/18
1100 B/O NEW JERSEY AVE SE   SEX ABUSE
First Degree Sexual Abuse
 04/17/18
400 B/O M ST SE   THEFT
Shoplifting
 04/17/18
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/17/18
UNIT B/O N ST SE   ROBBERY  04/14/18
100 B/O I ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/12/18
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/12/18
1200 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/09/18
150 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 04/07/18
1000 B/O 3RD ST SE   BURGLARY
Burglary One
 04/07/18
1200 B/O NEW JERSEY AVE SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 04/05/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/01/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/28/18
300 B/O I ST SE   ASSAULT WITH A DANGEROUS WEAPON  03/25/18

Recent Issued Building Permits Archive  
1331 2 ST SE   
04/02/18 
DISTRICT OF COLUMBIA / MARK HARLOW CLIFFORD
SB1800225 / CONSTRUCTION
Application for Well Abandonment Workplan Approval for the abandonment of 8 monitoring wells and 21 inclinometers at the Main Pumping Station site for the DC Water Clean Rivers Project, Division I, installed under Permit Number SB1400419.
1100 2ND PL SE   
04/19/18 
CAPPER CARROLLSBURG VENTURE, LLC / TAMIKA STATON; OTIS
EN1801710 / SHOP DRAWING
Install 1 New G2S 3500LBS @350FPM, Elevator 2; 13 Floors
   
04/19/18 
CAPPER CARROLLSBURG VENTURE, LLC / TAMIKA STATON; OTIS
EN1801712 / SHOP DRAWING
Install 2 New G2S Elevators - 3500LBS@35FPM Elevator 1, 12 Floors
1331 2ND ST SE 20003   
04/05/18 
DC WATER / DAVE LEVINE
AH1800744 / CONSTRUCTION
After Hours work for structure excavation in support of DC Water, Corrman Construction 301-343-5417.
1300 4TH ST SE   
04/17/18 
null / DONNA G GRAHAM
AH1800863 / CONSTRUCTION
WR #3476633-WARD 6-20003-VAETH / BRUNO - PEPCO CREWS WILL BE WORKING THE 1200 - 1300 BLK OF 4TH ST SE - INSTALLING NETWORK TRANSFORMER AND INSTALLING PRIMARY CABLES - STARTING THURSDAY 4 / 19 / 18 UNTIL 5 / 19 / 18 - MONDAY THRU FRIDAYS AT 10PM UNTIL 10AM AND ON SATURDAY AND SUNDAYS FROM 6AM TIL 8PM.
1346 4TH ST SE   
04/10/18 
ALAN OWINGS / ROBERT HENRY
AH1800796 / CONSTRUCTION
After Hours Permit for 04 / 16 / 18 from 9AM to 7PM to perform facade, interior unit framing and drywall work, and interior Mechanical, Electrical, Plumbing and Sprinkler Rough-In.
1346 4TH ST ST SE 20003   
03/28/18 
FOREST CITY / TYLER D BARRON
AH1800712 / CONSTRUCTION
After hours for 4 / 13 / 18 to 5 / 12 / 18. Work that is to be done is quiet work of window deliveries at 5:30AM to 7:00AM by use of tower crane
82 I ST SE   
04/02/18 
GDVC EYE STREET LLC / null
FB1800055 / SUPPLEMENTAL
150 I ST SE   
03/28/18 
null
E1805313 / SUPPLEMENTAL
   
03/29/18 
null / JOHN THOMSON 3018645080
E1805337 / SUPPLEMENTAL
300 M ST SE 400   
04/09/18 
FEDERAL CENTER LP / null
M1801970 / SUPPLEMENTAL
300 M ST SE STE# 400 20024   
04/05/18 
CHARLES SMITH / EUGENE AHNS 3012811497
E1805597 / SUPPLEMENTAL
300 M ST SE STE# 400   
04/12/18 
FEDERAL CENTER LP / null
P1805161 / SUPPLEMENTAL
401 M ST SE   
04/03/18 
TETRA TECH C/O DOEE / JESSICA REICHARD
AH1800767 / CONSTRUCTION
After hours permit for manhole access to complete inspections for DOEE Anacosta River Sediment clean up project, work hours between 7pm and 7am Monday thru Friday. Rolling work zones for all manhole access under permit # PA10374319-R1
800 NEW JERSEY AVE SE   
04/05/18 
SQUARE 737 LLC / null
P1804974 / SUPPLEMENTAL
   
04/09/18 
SQUARE 737 LLC / null
E1805700 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
04/02/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1800715 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
   
04/11/18 
CONSOLIDATED RAIL CORPORATION / DEVIN MURDOCK
SB1800265 / CONSTRUCTION
Drill 8 borings to 40ft. Convert 4 borings into 1" temporary wells, collect groundwater from each well and abandon borings.
1100 NEW JERSEY AVE SE 2ND FLOOR   
04/20/18 
SQUARE 742 LLC / null
E1806043 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
04/18/18 
null
E1805988 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
04/17/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / GARY BRENT; BRENT
SG1800260 / CONSTRUCTION
Install 1 illuminated wall sign, 1 illuminated window sign and 1 window vinyl decal sign - Peets Coffee
1100 NEW JERSEY AVE SE 5TH FL   
04/19/18 
SQUARE 742 LLC / DOMINIC E TOTARO 301-725-1998
M1802089 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
04/13/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1804348 / CONSTRUCTION
INTERIOR RENOVATIONS TO OFFICE SPACE ON THE 5TH FLOOR. **DEMOLITION, LEVEL 2 ALTERATION
   
04/19/18 
SQUARE 742 LLC / PEDRO C. CASTILLO 3019219056
E1806025 / SUPPLEMENTAL
   
04/19/18 
SQUARE 742 LLC / null
E1806015 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
04/06/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ACCUPERMIT LLC AS AGENT
B1803009 / CONSTRUCTION
Interior alterations for new tenant in existing commercial space to include partitions, mill work, electrical and plumbing fixtures, flooring and wall coverings, dining area furniture and kitchen equipment for a A-2 restaurant with 49 proposed occupancy.
125 O ST SE   
03/29/18 
DISTRICT OF COLUMBIA / JAMES M. HALLER
P1804624 / SUPPLEMENTAL
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801762 / SHOP DRAWING
I New G2S Elevator - 3500LBS @ 200FPM (7 Floors)
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801763 / SHOP DRAWING
Install 1 New G2S Elevator - 3500LBS @ 200FPM (6 Floors)
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801761 / SHOP DRAWING
Install 1 New G2S Elevators 4000LBS @ 200FPM (7 Floors)
71 POTOMAC AVE SE 20002   
04/19/18 
null / STEVE GRIFFIN
BP1802939 / POST CARD
71 POTOMAC AVE SE   
04/17/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
FD1800020 / CONSTRUCTION
Foundation only for new residential building
227 TINGEY ST SE   
03/28/18 
UNITED STATES OF AMERICA / ERICKA CLARK
AH1800760 / CONSTRUCTION
significant concrete pours and tower crane erection 5AM - 7AM and 7PM - 10:00PM
   
04/12/18 
UNITED STATES OF AMERICA / STEPHEN J. EXELBERT
P1805022 / SUPPLEMENTAL
300 TINGEY ST SE   
04/12/18 
MERCURY LLC / WILL TEASS
B1803433 / CONSTRUCTION
INTERIOR FIT-OUT / EXTENSION OF EXISTING TENANT SUITE (APPROVED UNDER B1605215) INCLUDING NEW MECHANICAL AND ELECTRICAL WORK. **LEVEL 2 ALTERATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.