Since January, 2003
            
 (a random before-and-after moment)
March 15, 2008
June 16, 2018
3rd at Tingey, Looking South-Southeast (see more)

* AMAZON HQ2: Jonathan O'Connell reports on the announcement yesterday that DC has included Southeast DC in the four sites it plans to pitch to Amazon* in the company's quest for a location for its "HQ2," a second headquarters that will need up to 8 million (!) square feet of space. It would require the cobbling together of multiple parcels in Near Southeast, Buzzard Point, and Poplar Point, almost none of which are currently controlled by the DC government. Amazon is expected to make a decision amongst the many cities putting themselves in contention in 2018. For more information on the #ObviouslyDC pitch, go to AlexaWhyDC.com. (And yes, the movie theater site is among the highlighted parcels. But remember, this is the city highlighting which parcels are still available, not what might necessarily come to pass.)
* BOWER SALES: Readers report receiving e-mails from PN Hoffman saying that the sales center for The Bower is expected to open on Sunday, Oct. 29, with some "preview appointments" available for scheduling in the time span between now and then. This is the 138-unit condo project that has been under construction for what seems like forever on the southeast corner of 4th and Tingey at the Yards. The official web site now has floor plans available (which I think I already mentioned, but whatevs).
* CAVA PROGRESS: In response to a Twitter query last week, Cava Grill says that "they are working hard" to get their new location on M Street between Half and Cushing ready to go. "Stay tuned for updates."
* RASA PROGRESS: Eater DC reports on the progress at Rasa Indian Grill, on 1st Street SE between M and N, which the owners "hope" to open in November.
* CHLOE PROGRESS: The restaurant coming to the ground floor of Arris is having a hiring open house on Oct. 26 and 27.
* SE BLVD: No pressure, but today is the last day to make comments on the environmental assessment for Southeast Blvd.
* CONSTRUCTION UPDATES: The JDLand camera has been lazy of late. But, given the weather forecast, I expect that to be rectified this weekend.
* Full disclosure: I work for the Washington Post, now owned by Jeff Bezos, Amazon's grand poobah. But Amazon does not own the Post, it must always be emphasized.
Comments (26)
   
 
 More Recent News

JDLand.com Home

Comments

FromTheTurret says: (10/17/17 1:14 PM)
Be on the look out for a new eatery in the neighborhood too...it's a secret. Oath Craft Pizza (www.oathpizza.com) will be moving in.

link


202_cyclist says: (10/17/17 1:29 PM)
Thank you for the updates-- it is nice not having the reminder about the playoffs every time I check the site.

I am looking forward to Rasa opening. We tried the food they were sampling at the Rooftop Hop event back in June and it was delicious.


Ampersand says: (10/17/17 2:17 PM)
FromTheTurret - Do they name-drop this neighborhood later in the article? Only Fairfax County is mentioned in the part I can read without creating an account. Sounds tasty, though also seems like it would compete pretty directly with All Purpose (which can't open soon enough).


FromTheTurret says: (10/17/17 2:54 PM)
They won't be a direct competitor to All Purpose. They are fast casual but will have beer and wine. Their footprint is much smaller than All Purpose...more like a Taylor Gourmet or Roti size location but not on 1st Street. No, the article does not name drop the neighborhood but another source did.


Snacks says: (10/17/17 3:38 PM)
The Bower

Units will be ready for move-in around the end of 2018 and early 2019. If you call and ask they will provide you with information regarding pricing on specific units. Condo fees are $.80 a sq foot. That seems high to me as this building won't have a pool.


Ampersand says: (10/17/17 3:42 PM)
Thanks for the additional info. I will gladly accept any fast casual pizza place that isn't an &pizza.


conngs0 says: (10/17/17 4:10 PM)
JD, thanks for the updates, and I hope you enjoy the time outdoors this coming weekend!

Re DC's proposal to Amazon, hopefully Amazon knows the "transit oriented" proposal only works during Metro's operating hours. To stay open late, Amazon will have to get Exelon to foot the bill. But if Amazon expects to occupy 500,000 to 1 million square feet of office space by late 2019, it sure doesn't seem like the "Anacostia Riverfront" option will be suitable by then. I mean, the movie theater surely won't be finished!


RMP says: (10/17/17 5:41 PM)
The coming soon paper is up for Willow and it's going in on the Water St. side of Arris next to Schilling.


202_cyclist says: (10/18/17 6:32 AM)
There is a notice on the window of the vacant building at 716 L St SE (i.e. the building right across the street from the blue castle and next
to the Brig) that a fourth floor addition and a penthouse is planned. I have thought that the ground floor there would be great for a restaurant, with the wide sidewalks.

There is quite a lot of residential construction now in the lower Barracks Row corridor, with this, 816 and 820 Potomac Ave, and the building on the corner of 8th and L St.


202_cyclist says: (10/18/17 6:37 AM)
Here is a photo of the notice.

link


jdc says: (10/18/17 9:10 AM)
Signage for Cava is up....it's weird though because it says Cava above one door and just V above another.


JES says: (10/18/17 3:37 PM)
80 cents per square foot??? Our particular unit in Velocity is around 52 or 53 cents. Yeesh.


SWSE says: (10/19/17 3:16 PM)
I'm surprised no one has commented on the Amazon proposal. While I think it's a long shot for DC/Cap Riverfront to get it, I generally think it's a terrible idea- it seems like it would take a ton of space off the table for community amenities (such as the movie theater, other restaurants or retail, etc), and bring a lot more traffic and congestion, drive up the cost of living even more, etc. Am I missing something? What are the advantages of Amazon moving in?


JD says: (10/19/17 3:20 PM)
While not speaking of the movie theater, it is likely that any office buildings built here would be required (or at least highly pressured) to have ground-floor retail. Certainly it would be required in any of the Yards parcels, and in the Florida Rock one, and at 25 M.

I think people aren't really talking about it because it doesn't seem highly likely that the neighborhood will be chosen, given what a cobbling-together of space it would have to be. Then again, neither did choosing South Capitol Street as the spot for a new baseball stadium.


JD says: (10/19/17 3:25 PM)
Also, as for "bringing a lot more traffic and congestion, driving up the cost of living" etc., every one of those parcels is going to be developed at some point anyway, whether Amazon arrives or not. But what it would do is change a number of parcels (the ones south of N and east of 1st) from planned residential to office. Otherwise, that huge empty space at 1st and M is already planned to be hundreds of thousands of square feet of office. 25 M is planned to be office. One of the Florida Rock buildings is planned to be office.

And I guarantee you that those lots won't all remained undeveloped just because Amazon doesn't come here.


202_cyclist says: (10/19/17 3:38 PM)
Reality is setting in for the Bridge Park, as it is being scaled back a bit.

link


202_cyclist says: (10/19/17 4:01 PM)
Prince of Petworth has an overview of the recent ANC meeting where the proposed building at the car repair lot adjacent to 909 New Jersey Ave was discussed.

link


JD says: (10/19/17 4:02 PM)
Bridge park's original design was seven times more load than the piers could handle. Lol.

Also, only $15m raised. It ain't gonna be built by 2019.



202_cyclist says: (10/19/17 4:24 PM)
Hyperloop or the Amazon HQ in JD Land both seem more realistic than the Bridge Park. I say that as someone who thinks the Bridge Park is a cool idea.


GG says: (10/19/17 8:02 PM)
Looks like Morini’s boardwalk is getting a trial run this weekend.

(oops, image URL included with this comment didn't work!)



GG says: (10/19/17 8:02 PM)
Let’s try that link again...

link


dude says: (10/20/17 10:22 PM)
Any news on Chipotle? Did I miss something?

As for Amazon, yeah, better bet for the Hill East area I think. Or even better in Fairfax County.


JES says: (10/21/17 11:00 AM)
Snapped a picture of the Morini menu this morning. Look legit! link


GarfieldPark says: (10/22/17 1:26 AM)
Agora/WF is on verge of adding lights on roof top of building. Looks good. Fencing is also up on phase 3 of that project. Getting to work.


202_cyclist says: (10/23/17 3:24 PM)
Speaking of Whole Foods, do you know when that little street adjacent to the building will open? It looks like the sidewalk is landscaped and there will be a whole new sidewalk to leave Lime Bikes/Spin/Mobikes on, as well as for neighborhood dogs to relieve themselves.


202_cyclist says: (10/23/17 3:26 PM)
Also, it is SWTLQTC territory and not JD Land but the scoreboard was recently installed at Audi Field. It looks like there has been considerable progress on the new stadium.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

Alex B. on Transportation Study Meeting: That rendering of Walters seems a bit misleading, as it would imply a two story ...
caphillguy on Transportation Study Meeting: For everyone's information: the intersection at Virginia Ave and 7th Street was ...
JD on Transportation Study Meeting: Some details on Walters Sports Bar, still planning on coming to the space below ...
202_cyclist on Transportation Study Meeting: Exciting news folks! It looks like there was soil testing today for the former ...
CJBabyDaddy on Transportation Study Meeting: @RMP & @jdc: Sign on the front door says: “We are waiting on some officia...
conngs0 on Transportation Study Meeting: JD, thanks for passing along the update on the Capper Seniors building. I suppo...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 12/15/18
200 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/14/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/13/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/13/18
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/09/18
1100 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/08/18
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/06/18
UNIT B/O N ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/05/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/01/18
1200 B/O HALF ST SE   ROBBERY  11/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/28/18
700 B/O L ST SE   THEFT
Shoplifting
 11/26/18
1255 1ST ST SE   ASSAULT WITH A DANGEROUS WEAPON  11/25/18
1200 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/23/18

Recent Issued Building Permits Archive  
1300 4TH ST SE 1ST FL   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902414 / SUPPLEMENTAL
1300 4TH ST SE   
12/11/18 
PARCEL O 1-LLC / N/A
B1900015 / CONSTRUCTION
Yards Parcel O1 - Revision to Base Building Permit B1609947 to incorporate minor design changes including converting a residential unit to a fitness center. TPR
1300 4TH ST SE B1   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902413 / SUPPLEMENTAL
1331 4TH ST SE CU   
12/10/18 
FC 1331 LLC / null
P1902045 / SUPPLEMENTAL
1300 4TH ST SE PENTHOUSE   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902412 / SUPPLEMENTAL
1300 4TH ST SE   
12/10/18 
PARCEL O-1 LLC / RICHARD V CAREY 301-424-8899
FB1900032 / SUPPLEMENTAL
(2) NEW INSTALL Gross 1,840,000 BTU / HR Natural Gas HW
1346 4TH ST SE   
12/07/18 
FC 1346 LLC / null
FB1900031 / SUPPLEMENTAL
1000 5TH ST SE   
12/11/18 
UNITED STATES OF AMERICA / null
E1902394 / SUPPLEMENTAL
   
12/11/18 
UNITED STATES OF AMERICA / BRANDON WILSON; BRANDON M WILSON
B1902777 / CONSTRUCTION
Kitchen Area: -Interior only Frame about 7lf around one column as per 2 / A030 -Add 260 SQF bulkhead as per 1 / A030 None Load bearing wall on first floor and second floor.. M,E,P, will be provided on another permit. IT Lounge -Add 194 SQF bulkhead as per 3 / A030
2 I ST SE   
12/10/18 
MCDONALDS CORPORATION / KIM MITCHELL
B1814290 / CONSTRUCTION
The submitted drawings are a revision to those approved under building permit #B1703907, and include the incorporation of a new corridor connection at the roof level between phase 1 and phase 2 buildings, and corresponding revisions. Revised Mechanical / Plumbing / Electrical drawings are included to reflect the change of Engineers of Record. Interior Design Drawings are also included. Various...
   
12/14/18 
CRESCENT CAPITAL VIEW, LLC / ERICKA CLARK
AH1900295 / CONSTRUCTION
Dismantle of tower crane. Minimal noise impact and required for reduction on impact to traffic.
250 M ST SE   
11/28/18 
SQUARE 769 LLC. / CONOR LAW
BCIV1800147 / CONSTRUCTION
New construction of erosion and sediment controls, domestic water service, fire service, sanitary sewer service, storm sewer service, curb & gutter, street trees, misc. landscaping, sidewalk, storm water management.
   
12/05/18 
null
E1902214 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE STE# 420   
11/27/18 
SQUARE 742 LLC / JAMES W LASHER
E1901850 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/20/18 
SQUARE 742 LLC / null
E1901715 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
P1901600 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
M1900652 / SUPPLEMENTAL
   
11/29/18 
SQUARE 742 LLC / JOE SAFFER
P1901753 / SUPPLEMENTAL
   
12/04/18 
SQUARE 742 LLC / PAUL WHITLEY
AN1900004 / CONSTRUCTION
This project consists on installing (9)proposed antennas , RRU's, and hybrid cables on an existing building, and removing (9) existing antennas, RRU's, TMA's, and hybrid cables.
   
12/05/18 
SQUARE 742 LLC / JOHN M. GIUSEPPE
B1900960 / CONSTRUCTION
renovations to 3rd floor office space SUITE 300 NATIONAL ASSOCIATION OF AREA AGENCIES ON AGING as shown on the electronically submitted mech., plumb., elect., fire protection, demolition, and architectural dwgs. Interior work only. No change in use. NO structural work involved. 7000 sf. **LEVEL 2 ALTERATION, DEMOLITION
125 O ST SE 2-6FL   
11/28/18 
DISTRICT OF COLUMBIA / ANDREW KLEIN 2408991526
E1901923 / SUPPLEMENTAL
125 O ST SE   
11/27/18 
DISTRICT OF COLUMBIA / MICHAEL P. LYONS
E1901853 / SUPPLEMENTAL
   
11/27/18 
DISTRICT OF COLUMBIA / WILLIAM H. JONES
E1901854 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / WESLEY R. DAVIS
E1901951 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / null
P1901748 / SUPPLEMENTAL
79 POTOMAC AVE SE   
11/27/18 
RIVERFRONT HOLDINGS LLC / null
AH1900270 / CONSTRUCTION
AFTER HOURS 7PM TO 7AM FINAL CONNECTION OF RELOCATED 8” SANITARY LINE
71 POTOMAC AVE SE   
11/26/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
B1804337 / CONSTRUCTION
New 264-Unit 13-Stories Apartment House
   
12/03/18 
RIVERFRONT PROPERTIES LLC / null
P1901813 / SUPPLEMENTAL
   
12/13/18 
RIVERFRONT HOLDINGS LL, LLC / PARKER HARRELL
SB1900071 / CONSTRUCTION
Abandoning 20 temporary wellpoints and 3 gravel packed wells originally installed for dewatering during construction.
79 POTOMAC AVE SE   
12/13/18 
RIVERFRONT HOLDINGS I LLC / null
E1902479 / SUPPLEMENTAL
227 TINGEY ST SE   
11/30/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1900285 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 12 / 5 / 2018 to 1 / 5 / 2019.
300 TINGEY ST SE   
12/04/18 
FC BOILERMAKER LLC / STEPHEN ADAMS 2403042373
E1902120 / SUPPLEMENTAL
   
12/06/18 
FC BOILERMAKER LLC / GARY BRENT; N/A
SG1900027 / CONSTRUCTION
Install 1 illuminated edge-lit wall logo sign, 1 illuminated halo-lit letter sign, 1 double-sided push thru edge-lit blade sign - LULULEMON
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.