Since January, 2003
            
 Sliding from Before to After

I don't get truly surprised too often anymore after 13-plus years in this gig, but when I clicked the link for this Washington Post article, "DC Unveils Plans for New Frederick Douglass Bridge," I most certainly did not expect to see a completely new design of the bridge that has been on the boards to be replaced for well over a decade.
Gone is the arched bascule design that was chosen many moons ago, replaced with a showier look using three sets of parallel arches. (I will await more detailed renderings before assuming that the bridge has the same multi-use paths on each side of the bridge as the previous design did, though the Post article says there is at least one.)
The plans for building the new bridge immediately south of and parallel to the old bridge have not changed, and there will still be large traffic ovals on both ends.
A $441 million design-build contract has been awarded to a joint venture of Archer Western Construction and Granite Construction Company, and AECOM is the lead designer. This phase also includes the reconstruction of the interchange of Interstate 295 and the Suitland Parkway.
The Post article says that the new bridge is "projected to open in 2021."
Here's a few more graphics purloined from the Post piece--hopefully DDOT will post their video of the design soon and I'll add the link.
It'll take me a little while to update my South Capitol Street Bridge project page, but in the meanwhile it's a nice trip down memory lane and includes more information (current as of the last time the city announced information about the project) about the ovals and whatnot.
And my South Capitol Street project page explains how this bridge and the interchange project are the first of a multiphase plan to rework much of South Capitol from the Southeast Freeway to the Suitland Park.
UPDATE: There is a new URL for an official web site for the project, newfrederickdouglassbridge.com. You can see the rendering video by scrolling down a touch or clicking on "Gallery." There's a lot of additional drawings, including these two from above, which show the traffic ovals and also do show multi-use paths on both sides of the bridge. See also the siteplan to get your bearings about the new bridge and ovals and 295 interchange.
Also, the project web site says that construction is expected to begin in "winter 2017."
Comments (30)
   
 
 More About Douglass Bridge

JDLand.com Home

Comments

NavyYardGuy says: (8/10/17 12:15 PM)
Wow, that is so beautiful (the bridge).


JES says: (8/10/17 12:26 PM)
holy crap, that's gonna be cool.


Brett M says: (8/10/17 12:30 PM)
Wow, not only is it a better looking bridge, but costs less than the $900M Vince Gray told us it would cost


Chris says: (8/10/17 12:35 PM)
I like it!


JD says: (8/10/17 12:46 PM)
Just to be fair, $900 M was probably for the entire South Capitol Street reconstruction project, not just the bridge. Though originally the bridge was priced at more than $600 million, back when it was still going to need to have a swing span.


JD says: (8/10/17 12:51 PM)
Be sure to watch the video on the project web site.


ttassa says: (8/10/17 12:52 PM)
Wow, this is very impressive.


202_cyclist says: (8/10/17 2:12 PM)
Frederick Douglass is doing great work. He is being recognized more and more these days.



202_cyclist says: (8/10/17 2:13 PM)
Looks good but where will the zip-line going across the Anacostia be placed?


JD says: (8/10/17 2:15 PM)
Over on that other bridge, you know, the one that always seems to be a year away from getting started.


202_cyclist says: (8/10/17 2:21 PM)
This looks great but I give it about two days before the U.S. Commission of Fine Arts tries its best to make this bridge dull.

Also, it reminds me of the 6th Street viaduct replacement in LA.
link


CJBabyDaddy says: (8/10/17 2:24 PM)
Purty.


202_cyclist says: (8/10/17 2:35 PM)
It almost makes up for some of the pain of losing the Barry.


jdc says: (8/10/17 4:29 PM)
Dock 79 residents are sure going to have a much improved view. What, what a beauty at night!


202_cyclist says: (8/10/17 4:40 PM)
Also, the new DC Water & Sewer Authority headquarters will compliment this new modern bridge design.


CJBabyDaddy says: (8/10/17 10:07 PM)
202_cyclist: I hope D.C. isn't jumping the gun on naming the bridge after this Mr. Douglass guy. Wouldn't it be better to wait a few decades until he retires and we can put his accomplishments into perspective?


conngs0 says: (8/11/17 8:54 AM)
Totally agree that the renderings of the bridge are pretty solid. Hopefully the finished product looks like that! I also like that the design seems to limit the amount of dead space around the ends of the bridge to the greatest extent possible.


202_cyclist says: (8/12/17 9:27 AM)
Why so much noise? STFU and go back to sleep!


JD says: (8/12/17 1:11 PM)
In other news, Ann's appears to be open today.



dude says: (8/13/17 10:24 PM)
@202 hah.

When I saw the bridge design in my email the other day I was pleasantly surprised. The whole profject looks good and seems to make sense. Very cool.


202_cyclist says: (8/14/17 10:35 AM)
One question about the design of the bridge-- presumably the vertical arches won't pose a hazard to the many low-flying helicopters in the area, especially with the heliport in Buzzard Point on the other side of So. Capitol Street (will this be relocated with the coming development of that part of Ward 6?). Has DDOT studied this?


ZNY2 says: (8/15/17 3:58 PM)
Noticed this weekend that Il Parco looked closed for good. Eat DC seems to confirm this

link


JD says: (8/15/17 4:02 PM)
Wow, swore we discussed it here in the comments, but guess it was just on Twitter.


walt says: (8/15/17 4:14 PM)
I always think about what the bridge will look like in a drought. Some bridges lose all of their aesthetic value when the river dries up. We probably don't have to worry about that though.
It looks beautiful as shown.


202_cyclist says: (8/15/17 4:15 PM)
Unfortunate news regarding Il Parco.

Does anyone know anything about 920 - 922 M Street, SE? There was a banner for AllAfrica.com on the front of the building but it appears to be vacant. The building looks like it might have previously been a motel. This is the first time I've seen this rendering: link

If I had some money to invest, I would buy property along the lower 8th Street corridor.


RMP says: (8/16/17 9:18 AM)
Paper is down at Juice Laundry and there's a sign on the door.



202_cyclist says: (8/16/17 10:18 AM)
Does anyone know the status of construction at the Zika pit known as the second phase of Parc Riverside. I haven't seen any apparent activity there in about two weeks.

I agree with what others posted about Il Parco. The pizza was actually quite good but the service was lacking.


202_cyclist says: (8/17/17 11:10 AM)
TOWER CRANE UPDATE!!!

A tower crane is being installed today at the West Half Street site.


JD says: (8/17/17 11:23 AM)
See, @202, I told you to be on the lookout!


202_cyclist says: (8/17/17 11:38 AM)
I have to say, these are exciting times we're living in!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

JES on Watching the Neighborhood: This is awesome. I wonder what a similar post looking up Half from the CF gate w...
RMP on Watching the Neighborhood: This is amazing. Thank you for all the hard work over the years to make this pos...
conngs0 on Watching the Neighborhood: Remarkable! It's been a pretty amazing transformation over the years even from ...
Gamble Rogers on Watching the Neighborhood: This is amazing work, JD.
202_cyclist on A Quick Hard: FOUND: keys for a Mini Cooper. My wife and I found a pair of keys this morning...
Westnorth on A Quick Hard: I hope Brogan isn't related to infamous Elon Musk hanger-on Brogan BamBrogan; if...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/18/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/16/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/11/18
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/10/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/18
1000 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/28/18
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/22/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/21/18
300 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/19/18

Recent Issued Building Permits Archive  
1018 3RD ST SE   
06/06/18 
DAVID A LEINER / SCOTT STERL
F1800474 / CONSTRUCTION
REPLACEMENT OF AN EXISTING CHAIN LINK FENCE TO A WOODEN FENCE 6FT. TALL.
1212 4TH ST SE   
06/06/18 
null / THAIS NA PEACHER
EHOP18924304 / HOME OCCUPATION
101 H ST SE   
05/22/18 
SQUARE 737 LLC / null
M1802469 / SUPPLEMENTAL
   
05/23/18 
SQUARE 737 LLC / null
P1806213 / SUPPLEMENTAL
   
06/05/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1807389 / SUPPLEMENTAL
   
06/06/18 
SQUARE 737 LLC / null
P1806501 / SUPPLEMENTAL
2 I ST SE   
05/22/18 
CRESCENT CAPITOL VIEW / null
E1807051 / SUPPLEMENTAL
   
05/31/18 
CRESCENT CAPITOL VIEW / null
E1807278 / SUPPLEMENTAL
   
05/23/18 
CRESCENT CAPITAL VIEW, LLC / ERICKA CLARK
TC1800034 / CONSTRUCTION
Renewal of tower crane permit #TC1700022 EXTENSION WILL EXPIRE ON 11 / 23 / 2018
202 M ST SE   
05/29/18 
null
E1807211 / SUPPLEMENTAL
   
05/29/18 
null
P1806323 / SUPPLEMENTAL
100 M ST SE   
06/05/18 
SQUARE 743 INC / ROBERT L HUNTER 703-404-0303
M1802631 / SUPPLEMENTAL
202 M ST SE   
05/31/18 
UNITED STATES OF AMERICA / null
P1806387 / SUPPLEMENTAL
300 M ST SE   
05/25/18 
FEDERAL CENTER LP / GARY BRENT; CARLOS DIAZ
SG1800308 / CONSTRUCTION
Install 2 illuminated wall signs and 1 temporary Banner - Sprint
   
06/01/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809520 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 860 SQUARE FEET. STRATEGIC INSIGHT
410 M ST SE   
05/30/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / SCOTT NICHOLS
AN1800023 / CONSTRUCTION
AT&T proposes to add three new antennas to an existing rooftop telecommunications facility.
800 NEW JERSEY AVE SE   
05/24/18 
SQUARE 737 LLC / null
P1806243 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
05/23/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION INC.
AH1800974 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities. **TO EXCLUDE LEGAL HOLIDAYS**
1115 NEW JERSEY AVE SE   
05/22/18 
DONOHOE REAL ESTATE SERVICES / null
M1802478 / SUPPLEMENTAL
   
06/07/18 
DONOHOE REAS ESTATE SERVICES / null
E1807467 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20003   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807687 / SUPPLEMENTAL
   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807698 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/12/18 
GALLERY CAPITOL WATERFRONT PROPERTY LLC / null
P1806653 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/12/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1807730 / CONSTRUCTION
REVISION: REVISE B1804348 5TH FLOOR OFFICE SPACE TO EXTEND THE OFFICE INTO ADDITIONAL SPACE TO CREATE A LARGER OPEN OFFICE
71 POTOMAC AVE SE   
05/30/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800044 / CONSTRUCTION
Removal of an Underground storage Tank (UST) 7 feet in diameter and approximately 16 feet long (approximately 6,000 gallons). Suspected Fuel Tank. Tank is filled with water and soil. Tank will be cleaned, removed and disposed off as per the appropriate standards and requirements.
221 TINGEY ST SE   
06/05/18 
GONE YARD HOTEL OWNER LLC / MITCH PERMUY 7272100491
E1807017 / SUPPLEMENTAL
227 TINGEY ST SE   
05/25/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1801871 / CONSTRUCTION
Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR
   
05/31/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806388 / SUPPLEMENTAL
(2) Backwater valve
   
06/07/18 
UNITED STATES OF AMERICA / MICHAEL ERIC CAMPBELL 571-229-1360
M1802664 / SUPPLEMENTAL
Equipment Manufacturer Equipment Model AAON DOAS, RTU and AHU DAIKIN VRF and split systems DESERT AIRE LC06R7NFDDMLAERD
   
06/07/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806553 / SUPPLEMENTAL
REVISION TO P1806388. IN LIEU OF 753 SINKS SHOULD READ 264 SINKS, 489 BASINS
300 TINGEY ST SE   
06/04/18 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS 443-532-0991
M1802615 / SUPPLEMENTAL
   
06/04/18 
FC BOILERMAKER LLC / null
P1806437 / SUPPLEMENTAL
   
06/05/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1806464 / SUPPLEMENTAL
355 WATER ST SE   
06/14/18 
UNITED STATES OF AMERICA / EDUARDO LOPEZ 2023884000
E1807680 / SUPPLEMENTAL
355 WATER ST ST SE   
06/13/18 
UNITED STATES OF AMERICA / KIMBERLY SPEED
TN1800127 / CONSTRUCTION
The Great Lawn at Yards Park will be the site of the California State Society Annual Summer Picnic. The contract specifies the licensee to obtain permits for tents and generators on the lawn. The large tent is 100 x 40 - which I have the Certificate of Flame Resistance), as well as a generator. I have the generator specifications from the distributor.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.