Last week the DC Zoning Commission gave a unanimous thumbs-up last week to the design review for the first hotel at the Yards, to be constructed on the southwest corner of 3rd and Tingey on the north end of what is known in Yards parlance as "Parcel L."
It will be 10 stories tall, with 227 rooms and about 7,500 square feet of ground-floor retail, plus additional space for a rooftop bar. No operator for the hotel has been publicly announced, but apparently those talks are far along.
The hotel is expected to be completed more or less at the same time as its sibling to the south, the 280ish-unit residential building that first hit the boards a year ago. That building will have about 17,000 square feet of ground-floor retail. The residential building is being developed by Forest City, but the hotel is actually being developed by JW Capital Partners and Geolo Capital.
As part of the construction of these two buildings, a new pedestrian "mews" along what would be the footprint of 2nd Street SE will be constructed, making for an easier and less traffic-y flow between the Yards Park and points north and west.
There will also be a new Tingey Square built at the intersection of N, Tingey, and New Jersey, which should change the traffic flow at that spot considerably.
There's been no official announced timeline on these projects, but the closure on June 1 of the public parking lot on Parcel L might lead one to believe that there is some expectation of work at least on the southern end of the block looming before too long, but I know nothing for sure. UPDATE: I see now that an excavation-only permit was approved for this site recently (looks like they need to run water, sewer, gas, and telecommunications infrastructure to the block), and there is a shorting/sheeting permit application filed for the residential building, which jibes with the estimated 2018 start date that was given last year.
See my Parcel L page (such as it is) for additional details (such as they are).
Comments (9)
   
 
 More About Development News

JDLand.com Home

Comments

JD says: (6/9/17 1:03 PM)
And in other permit news, permits have started to be filed for The Garrett, the third residential building on the Park Chelsea/Agora block. And the shoring/sheeting/excavation permit for Parc Riverside Phase II looks to have been issued, but foundation and above-ground permits are still in process.


RMP says: (6/9/17 1:15 PM)
In case anyone is curious, I've been told the management company selected for this hotel is Thompson Hotels. I've never heard of them or stayed in any of their properties. Anyone know much about them? link


JES says: (6/9/17 2:05 PM)
They are definitely already working at the Parc Riverside site. The notice in our elevator says to expect pile driving to start this Monday (6/12) and last about 5-6 weeks. I guess on the bright side, it's going to be easier to get my a$$ out of bed on time for the foreseeable future... link


Section314 says: (6/9/17 3:36 PM)
Does anyone know if Tingey Square will be delivered as part of the completion of the DC Water work currently underway? Or at least the realigned roadway, curbs, gutters, sidewalks, etc.?


Section314 says: (6/9/17 3:37 PM)
Does anyone know if Tingey Square will be delivered as part of the completion of the DC Water work currently underway? Or at least the realigned roadway, curbs, gutters, sidewalks, etc.?


dude says: (6/11/17 8:27 AM)
Are there enough people to fill all these hotels?


Section314 says: (6/11/17 11:25 PM)
Dude, the 2016/2017 DC Development report says that, as of Fall 2016, there were 29,387 hotel rooms in DC. What's a few hundred more?


RMP says: (6/12/17 8:51 AM)
I've been keeping an eye on the neighborhood hotels for my family for their upcoming vacation. Despite all being mid-tier brands, the rates are higher on a lot of dates than I might otherwise expect, which seems to suggest they're not having a hard time filling rooms. But I could be completely wrong.


Westnorth says: (6/16/17 4:59 PM)
Geolo Capital also operates the Liaison Hotel near Union Station (better known to locals as the hotel with Art & Soul restaurant). Thompson's Nashville property seems most comparable, in that it's in a similar new-build mixed-use neighborhood. Looks like they're aiming for a W Hotels price point and ambiance.

The mid-tier hotels seem really popular with both convention types going to the Hill and with tourist groups. Thompson is a different beast, though; will be interesting to see if enough rich yuppies are willing to book away from Dupont and Downtown.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News
  

RMP on DDOT Unveils Planned: I support this change. I like the current Ciculator route in theory, but it take...
NavyYardGuy on Peet's Coffee Coming: @ JD..was that a hint..like Compass coffee is coming to Navy Yard too?
Ampersand on DDOT Unveils Planned: aaaaaaand now that I've posted that I see exactly such a route would also be cre...
JD on DDOT Unveils Planned: (That includes Eastern Market.)
JD on DDOT Unveils Planned: "Circulator service between Union Station, Barracks Row, and the Washington Navy...
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/15/17
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/12/17
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/11/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/11/17
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/08/17
900 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/08/17
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 12/03/17
300 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/02/17
500 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/02/17
1100 5TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/01/17
400 B/O M ST SE   THEFT
Shoplifting
 11/29/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/28/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/27/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/26/17
1000 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/26/17
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/24/17
1200 B/O NEW JERSEY AVE SE   THEFT
Theft First Degree (all Other Larceny)
 11/24/17
400 B/O M ST SE   THEFT
Shoplifting
 11/22/17
100 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 11/19/17
70 B/O I ST SE   BURGLARY
Burglary Two
 11/16/17

Recent Issued Building Permits Archive  
1100 2ND PL SE   
12/13/17 
BAKER DC / CHRISTINE LONG
AH1800290 / CONSTRUCTION
An after hours permit is respectfully requested from 5am thru 9pm daily
1331 2ND ST SE   
11/29/17 
DC WATER / DAVE LEVINE
AH1800282 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water. Corman Construction 301-343-5417
2 I ST SE   
11/29/17 
MCDONALDS CORPORATION / MICHAEL ERIC CAMPBELL
M1800603 / SUPPLEMENTAL
   
11/29/17 
MCDONALDS CORPORATION / DANIEL P. THOMPSON
P1801598 / SUPPLEMENTAL
   
12/01/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800280 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
   
12/14/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800324 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
70 I ST SE   
11/28/17 
DISTRICT OF COLUMBIA / OTIS ELEVATOR COMPANY; OTIS ELEVATOR COMPANY
ER1800447 / SHOP DRAWING
BODY OF WORK: Replace machine and recable elevator # 1.
337 L ST SE   
12/06/17 
JENNIFER LANCASTER / null
E1802092 / SUPPLEMENTAL
347 L ST SE   
12/07/17 
THOMAS PAQUIN / null
E1802129 / SUPPLEMENTAL
   
12/14/17 
THOMAS PAQUIN / BJORN FALK
SOL1800006 / CONSTRUCTION
Installation of a 5.4kW solar PV system. Parapet mounted, 15 panels
555 L ST SE   
11/27/17 
UNITED STATES OF AMERICA / CLIFFORD DIXON
B1714199 / CONSTRUCTION
DGS PROJECT This permit is for interior work only.SWING SPACE FOR WARD 6 CLINIC TO EXISTING VACANT JOY EVANS RECREATION CENTER TEMPORARILY FOR 12 TO 18 MONTHS
515 M ST SE   
12/11/17 
null / BLUE STAR DESIGN BUILD
BP1801085 / POST CARD
300 M ST SE STE# 402 20024   
12/13/17 
FEDERAL CENTER LP / null
P1802065 / SUPPLEMENTAL
100 M ST SE   
12/05/17 
CRANE SERVICE CO / CHRISTINE LONG
AH1800304 / CONSTRUCTION
An after hours permit is respectfully requested from 7AM Saturday thru 7PM Sunday
110 M ST SE   
12/13/17 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THUY LE
TL1700234 / CONSTRUCTION
Interior alteration for new tenant, restaurant with 37 seats, 49 in occupancy load.
410 M ST SE   
11/20/17 
DC HOUSING / COLLINS ELEVATOR SERVICES INC.; COLLINS ELEVATOR SERVICES INC.
ER1800511 / SHOP DRAWING
BODY OF WORK: 1. Remove old piston. Replace & install jack on car # 1.
861 NEW JERSEY AVE SE   
12/14/17 
CSX TRANSPORTATION INC. / NA CSX TRANSPORTATION, INC.
AH1800330 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1100 NEW JERSEY AVE SE 3RD FL   
11/22/17 
SQUARE 742 LLC / null
P1801490 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/20/17 
SQUARE 742 LLC / null
P1801410 / SUPPLEMENTAL
   
12/06/17 
SQUARE 742 LLC / DOMINIC E TOTARO
M1800664 / SUPPLEMENTAL
   
12/08/17 
SQUARE 742 LLC / SAM HOLLEN
B1801219 / CONSTRUCTION
INTERIOR RENOVATION TO 2ND FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP, LIFE SAFETY AND STRUCTURAL HANGING MOVABLE PARTITION. 25,226 SQUARE FEET. ALION SCIENCE AND TECHNOLOGY **LEVEL 2 ALTERATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2017 JD.