Since January, 2003
            
 (a random before-and-after moment)
September 24, 2007
October 22, 2017
4th at Tingey, Looking South-Southeast (see more)

Conte's Bike Shop, a bicycling retailer with nine Virginia locations, will be opening a full-service operation at Arris at the Yards in early 2017, it's being announced today.
But if you can't wait that long, Conte's will be running a 10-day pop-up version in one of Arri's open retail spaces on Tingey Street starting Thursday, May 19 through May 29th, opening on Thursday through Sunday during each of those two weeks. This means that the store will be open during both Bike to Work Day on Friday, May 20 and Tour de Fat at the Yards on Saturday, May 21.
This pop-up version will have bikes for sale or rent, repair services, clothing, gear, and "expert advice."
The permanent Conte's location will be 2,200 square feet in size, located in the 4th Street portion of Arris's ground floor.
Conte's was founded in 1957 in Newport News, and is apparently still a family-owned operation, with locations in Arlington and Falls Church in addition to elsewhere in Virginia.
The press release from Forest City also says:
"Their shops carry a full line of bikes and accessories including hybrids, mountains, cruisers and road bikes by leading brands including Giant/Liv, Eddy Merckx, BMC, Scott and more, as well as offering gear, accessories clothing and lots of expert advice. They also offer a trade-in policy and used equipment for sale. What’s more, Conte’s Bike Shop prides itself on being a community center and resource for the cycling community, offering events, clinics, structured rides and online resources."
Comments (21)
   
 
 More About Retail

JDLand.com Home

Comments

JD says: (5/17/16 4:34 PM)
Also in the press release:

* The Yards Park Marina is expected to open in June
* District Winery construction expected to start in June, with completion in late 2017
* Site work expected to begin "in coming weeks" on the two Parcel O projects, with a completion date of 2018, but no exact start date announced
* Arris has 115 of its 327 units already leased
* Showplace Icon "expected to begin late this year," but until there's an announced deal with DC Water, treat that news lightly.



JD says: (5/17/16 4:36 PM)
Also, the "interim park area" at 1st and M is almost finished, but they REFUSE to call it by its correct name, Spooky Park.


JES says: (5/17/16 4:37 PM)
Completion date of 2018? And they haven't even started? Having a hearty guffaw at that timeline...


JD says: (5/17/16 4:38 PM)
Nah, not really, generally buildings can take 18-24 months on a "normal" timeline. They could start by the end of this year and still make the end of 2018.


JES says: (5/17/16 4:39 PM)
I guess it just SEEMS like it takes so much longer...


conngs0 says: (5/17/16 4:59 PM)
Awesome news about the bike shop! I was pretty bummed that REI went the NoMa route as opposed to taking over that building south of the DOT (Building 170?). I still think that was a better fit, but I suppose between Conte's and Pacers, the neighborhood will be able to get a large amount of their fitness paraphernalia even without REI.

The lag in progress on the Showplace Icon theater resulting from DC Water's reluctance to move is pretty frustrating. Hopefully that can be worked out sooner rather than later.


CJBabyDaddy says: (5/17/16 4:59 PM)
The PN Hoffman Parcel O sales sign at the corner of 4th & Tingey originally indicated that sales would begin in "Spring 2016." In March 2016, the sign was updated to indicate that sales would commence in "2016." In April, we were informed by PNH to expect sales to begin in the first quarter of 2017.


JD says: (5/17/16 5:05 PM)
As I mentioned in a comment somewhere a few weeks ago, I am shifting 100% back to needing to see shovels in the ground before really believing that any project is getting started. Not saying all new projects are going to grind to a halt, but there is just so much residential inventory newly arrived or already under construction, and I just don't believe that projects are a "given" at this point to be getting underway.



Westnorth says: (5/17/16 5:31 PM)
Yeah, I was surprised to see that Parcel O was not mentioned at all in Forest City's annual report to shareholders. PNH is probably trying to wrap up sales at 525 Water in Southwest before starting sales at the Yards.


JD says: (5/17/16 5:33 PM)
A reader told me within the past few days that the Arris leasing office told him that Parcel O won't begin until 2018. I don't tend to take leasing people at their word on this sort of stuff (having heard way too many stories over the years of out-and-out lies at various leasing offices about starting dates at neighboring sites), but it's something to file away as a potentially interesting data point.



snakegriffin says: (5/17/16 5:35 PM)
Heard from multiple realtors that given the demand and the neighborhood they expect the Parcel O prices to be comparable to the other PNH units in SW. At those price points (and at this timeline), we'll be out. I'd rather renovate a rowhouse for that amount of money.


JES says: (5/17/16 6:34 PM)
Are the apartment building and condo building at Parcel O designed to be built at the same time, or could they start one without starting the other? Given that renters and buyers are different markets (and there's a dearth of for sale property in our neighborhood), I don't think the condo building would have any trouble whatsoever selling. With all the new rentals coming online, could be different story for getting the apartments rented though. And if they have to be built together, that could push the entire timeline back I suppose.


JD says: (5/17/16 9:10 PM)
I think they could be built separately, but that's not speaking to financial agreements/construction agreements/etc.


CJBabyDaddy says: (5/17/16 10:55 PM)
The 35% drawings from last year show Parcels O-1 and O-2 sharing an underground parking garage 2 levels below grade. So, I've always assumed that condo building and apartment building construction will be simultaneous.


JD says: (5/17/16 10:58 PM)
That is the plan, but it's not a design that irrevocably requires the two to be built at the same time. Look at Velocity, and how they built the garage for what ended up being the Parc Riverside. With money, and lawyers, all sorts of initial plans can be altered. :)


jdc says: (5/18/16 10:14 AM)
And that's something this area definitely does not have a lot of, money and lawyers ;)


JD says: (5/19/16 2:41 PM)
I haven't gotten a press release on this, so no "real" post on it, but Bisnow says that All-Purpose Pizza has been signed at Dock 79:

Bisnow: link

City Paper on All-Purpose's location on 9th St. downtown: link


JD says: (5/19/16 2:44 PM)

It's from the Red Hen and Boundary Stone folks: link


JES says: (5/19/16 4:05 PM)
...but who's taking the retail bay that has the roof deck thingy?


conngs0 says: (5/19/16 11:08 PM)
I wonder if this will spur Nicoletta to get moving in an effort to gain a foothold in the neighborhood.

I've had a chance to visit Il Parco twice so far. Not bad at all (and the service was significantly better than it was at Park Tavern), but I think the pizza is significantly better when you eat in as opposed to take it home. I suppose you can say the same thing about almost any pizza, but that thin crust really does need to be eaten right out of the oven. So I'm still looking for an upgrade over Papa Johns when it comes to delivery/takeout. Doesn't look like All Purpose will fill that niche, but I'll still look forward to giving it a shot!


JES says: (5/20/16 10:53 AM)
@conngs0

Yeah, I'm not sure what it is about delivery pizza around here, but almost all of it sucks. Pizza Bolis isn't bad though, and We the Pizza also delivers here.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News
  

RMP on DDOT Unveils Planned: I support this change. I like the current Ciculator route in theory, but it take...
NavyYardGuy on Peet's Coffee Coming: @ JD..was that a hint..like Compass coffee is coming to Navy Yard too?
Ampersand on DDOT Unveils Planned: aaaaaaand now that I've posted that I see exactly such a route would also be cre...
JD on DDOT Unveils Planned: (That includes Eastern Market.)
JD on DDOT Unveils Planned: "Circulator service between Union Station, Barracks Row, and the Washington Navy...
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/15/17
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/12/17
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/11/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/11/17
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/08/17
900 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/08/17
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 12/03/17
300 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/02/17
500 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/02/17
1100 5TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/01/17
400 B/O M ST SE   THEFT
Shoplifting
 11/29/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/28/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/27/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/26/17
1000 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/26/17
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/24/17
1200 B/O NEW JERSEY AVE SE   THEFT
Theft First Degree (all Other Larceny)
 11/24/17
400 B/O M ST SE   THEFT
Shoplifting
 11/22/17
100 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 11/19/17

Recent Issued Building Permits Archive  
1100 2ND PL SE   
12/13/17 
BAKER DC / CHRISTINE LONG
AH1800290 / CONSTRUCTION
An after hours permit is respectfully requested from 5am thru 9pm daily
1331 2ND ST SE   
11/29/17 
DC WATER / DAVE LEVINE
AH1800282 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water. Corman Construction 301-343-5417
2 I ST SE   
11/29/17 
MCDONALDS CORPORATION / MICHAEL ERIC CAMPBELL
M1800603 / SUPPLEMENTAL
   
11/29/17 
MCDONALDS CORPORATION / DANIEL P. THOMPSON
P1801598 / SUPPLEMENTAL
   
12/01/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800280 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
   
12/14/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800324 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
70 I ST SE   
11/28/17 
DISTRICT OF COLUMBIA / OTIS ELEVATOR COMPANY; OTIS ELEVATOR COMPANY
ER1800447 / SHOP DRAWING
BODY OF WORK: Replace machine and recable elevator # 1.
337 L ST SE   
12/06/17 
JENNIFER LANCASTER / null
E1802092 / SUPPLEMENTAL
347 L ST SE   
12/07/17 
THOMAS PAQUIN / null
E1802129 / SUPPLEMENTAL
   
12/14/17 
THOMAS PAQUIN / BJORN FALK
SOL1800006 / CONSTRUCTION
Installation of a 5.4kW solar PV system. Parapet mounted, 15 panels
555 L ST SE   
11/27/17 
UNITED STATES OF AMERICA / CLIFFORD DIXON
B1714199 / CONSTRUCTION
DGS PROJECT This permit is for interior work only.SWING SPACE FOR WARD 6 CLINIC TO EXISTING VACANT JOY EVANS RECREATION CENTER TEMPORARILY FOR 12 TO 18 MONTHS
515 M ST SE   
12/11/17 
null / BLUE STAR DESIGN BUILD
BP1801085 / POST CARD
300 M ST SE STE# 402 20024   
12/13/17 
FEDERAL CENTER LP / null
P1802065 / SUPPLEMENTAL
100 M ST SE   
12/05/17 
CRANE SERVICE CO / CHRISTINE LONG
AH1800304 / CONSTRUCTION
An after hours permit is respectfully requested from 7AM Saturday thru 7PM Sunday
110 M ST SE   
12/13/17 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THUY LE
TL1700234 / CONSTRUCTION
Interior alteration for new tenant, restaurant with 37 seats, 49 in occupancy load.
410 M ST SE   
11/20/17 
DC HOUSING / COLLINS ELEVATOR SERVICES INC.; COLLINS ELEVATOR SERVICES INC.
ER1800511 / SHOP DRAWING
BODY OF WORK: 1. Remove old piston. Replace & install jack on car # 1.
861 NEW JERSEY AVE SE   
12/14/17 
CSX TRANSPORTATION INC. / NA CSX TRANSPORTATION, INC.
AH1800330 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1100 NEW JERSEY AVE SE 3RD FL   
11/22/17 
SQUARE 742 LLC / null
P1801490 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/20/17 
SQUARE 742 LLC / null
P1801410 / SUPPLEMENTAL
   
12/06/17 
SQUARE 742 LLC / DOMINIC E TOTARO
M1800664 / SUPPLEMENTAL
   
12/08/17 
SQUARE 742 LLC / SAM HOLLEN
B1801219 / CONSTRUCTION
INTERIOR RENOVATION TO 2ND FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP, LIFE SAFETY AND STRUCTURAL HANGING MOVABLE PARTITION. 25,226 SQUARE FEET. ALION SCIENCE AND TECHNOLOGY **LEVEL 2 ALTERATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2017 JD.